X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294240516020

Well Details

Well ID: 0294240516020
Loading map...
Location: 02/16-05-029-24W4/0
Location Alias: 02/16-05-29-24 W4M
Location Alias 2: 02/16-05-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 05
County/Municipality: Kneehill County
Well Name: EMBER 102 SWALWELL 16-5-29-24
Operator Name: Ember Resources Inc.
License Number: 0411185
License Date: 2009-06-27
License Status: Issued
Spud Date: 2009-07-20
Final Drill Date: 2009-07-22
Well Total Depth: 906.00 m
Surface Hole Latitude: 51.457874
Surface Hole Longitude: -113.334546

For data sources see[1][2]

Well History

Date Event
2009-06-27 Obtained License
2009-07-20 Surface Casing Operation Performed
2009-07-22 Finished Drilling
2009-07-22 Production Casing Operation Performed
2009-07-22 Rig Released
2009-07-22 Well Mode changed to Drilled and Cased
2009-08-31 Well Log Performed
2009-09-22 Perforation Treatment Performed - Jet Perforation
2009-10-02 Perforation Treatment Performed - Jet Perforation
2009-10-07 Perforation Treatment Performed - Fractured
2009-11-20 Well Began Production
2009-11-20 Well Fluid changed to Coalbed Methane-Coals and Other
2009-11-20 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-09-22 Perforation 815.80 816.30 13
2009-10-02 Perforation 439.30 439.80 13
2009-10-02 Perforation 442.40 443.90 13
2009-10-02 Perforation 455.20 455.70 13
2009-10-02 Perforation 462.10 463.60 13
2009-10-02 Perforation 506.60 507.60 13
2009-10-02 Perforation 517.50 518.50 13
2009-10-02 Perforation 525.50 526.00 13
2009-10-02 Perforation 539.60 540.60 13
2009-10-02 Perforation 557.80 558.30 13
2009-10-07 Fracture 557.80 558.30 0
2009-10-02 Perforation 216.40 216.90 13
2009-10-07 Fracture 539.60 540.60 0
2009-10-07 Fracture 525.50 526.00 0
2009-10-07 Fracture 517.50 518.50 0
2009-10-07 Fracture 506.60 507.60 0
2009-10-07 Fracture 462.10 463.60 0
2009-10-07 Fracture 455.20 455.70 0
2009-10-07 Fracture 439.30 443.90 0
2009-10-07 Fracture 418.30 418.80 0
2009-10-07 Fracture 397.80 398.30 0
2009-10-07 Fracture 387.40 388.40 0
2009-10-02 Perforation 278.90 279.40 13
2009-10-07 Fracture 336.70 337.70 0
2009-10-07 Fracture 296.80 297.30 0
2009-10-07 Fracture 278.90 282.90 0
2009-10-07 Fracture 216.40 216.90 0
2009-10-02 Perforation 282.40 282.90 13
2009-10-02 Perforation 296.80 297.30 13
2009-10-02 Perforation 336.70 337.70 13
2009-10-02 Perforation 387.40 388.40 13
2009-10-02 Perforation 397.80 398.30 13
2009-10-02 Perforation 418.30 418.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 1008 0.0 0.0 0.0
2010 8756 0.0 0.0 0.0
2011 8700 0.0 0.0 0.0
2012 8335 0.0 0.0 0.0
2013 8730 0.0 0.0 0.0
2014 8599 0.0 0.0 0.0
2015 8676 0.0 0.0 0.0
2016 8616 0.0 0.0 0.0
2017 7957 0.0 0.0 0.0
2018 5343 0.0 0.0 0.0
2019 6520 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[5]

References