X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294240602000

Well Details

Well ID: 0294240602000
Loading map...
Location: 00/02-06-029-24W4/0
Location Alias: 00/02-06-29-24 W4M
Location Alias 2: 00/02-06-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 06
County/Municipality: Kneehill County
Well Name: EMBER SWALWELL 2-6-29-24
Operator Name: Ember Resources Inc.
License Number: 0411191
License Date: 2009-06-29
License Status: Issued
Spud Date: 2009-08-11
Final Drill Date: 2009-08-13
Well Total Depth: 921.00 m
Surface Hole Latitude: 51.448370
Surface Hole Longitude: -113.363590

For data sources see[1][2]

Well History

Date Event
2009-06-29 Obtained License
2009-08-12 Surface Casing Operation Performed
2009-08-13 Finished Drilling
2009-08-13 Production Casing Operation Performed
2009-08-13 Rig Released
2009-08-13 Well Mode changed to Drilled and Cased
2009-09-03 Well Log Performed
2009-09-18 Perforation Treatment Performed - Jet Perforation
2009-09-25 Perforation Treatment Performed - Fractured
2009-11-03 Well Began Production
2009-11-03 Well Fluid changed to Coalbed Methane-Coals Only
2009-11-03 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-09-18 Perforation 278.50 279.50 13
2009-09-18 Perforation 464.70 466.20 13
2009-09-18 Perforation 467.60 469.10 13
2009-09-18 Perforation 496.00 496.50 13
2009-09-18 Perforation 500.50 501.00 13
2009-09-18 Perforation 508.50 509.50 13
2009-09-18 Perforation 513.20 514.20 13
2009-09-18 Perforation 521.80 522.80 13
2009-09-18 Perforation 536.00 537.00 13
2009-09-18 Perforation 549.30 551.80 13
2009-09-18 Perforation 568.00 569.00 13
2009-09-18 Perforation 292.50 293.00 13
2009-09-18 Perforation 569.30 569.80 13
2009-09-18 Perforation 570.40 570.90 13
2009-09-25 Fracture 568.00 570.90 0
2009-09-25 Fracture 549.30 551.80 0
2009-09-25 Fracture 536.00 537.00 0
2009-09-25 Fracture 521.80 522.80 0
2009-09-25 Fracture 513.20 514.20 0
2009-09-25 Fracture 508.50 509.50 0
2009-09-25 Fracture 500.50 501.00 0
2009-09-25 Fracture 496.00 496.50 0
2009-09-18 Perforation 392.80 393.80 13
2009-09-25 Fracture 467.60 469.10 0
2009-09-25 Fracture 464.70 466.20 0
2009-09-25 Fracture 456.00 456.50 0
2009-09-25 Fracture 451.00 452.50 0
2009-09-25 Fracture 447.40 447.90 0
2009-09-25 Fracture 425.80 426.80 0
2009-09-25 Fracture 404.80 405.80 0
2009-09-25 Fracture 392.80 396.00 0
2009-09-25 Fracture 292.50 293.00 0
2009-09-25 Fracture 278.50 279.50 0
2009-09-18 Perforation 395.00 396.00 13
2009-09-18 Perforation 404.80 405.80 13
2009-09-18 Perforation 425.80 426.80 13
2009-09-18 Perforation 447.40 447.90 13
2009-09-18 Perforation 451.00 452.50 13
2009-09-18 Perforation 456.00 456.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 1392 0.0 0.0 0.0
2010 8756 0.0 0.0 0.0
2011 8700 0.0 0.0 0.0
2012 8398 0.0 0.0 0.0
2013 8730 0.0 0.0 0.0
2014 8599 0.0 0.0 0.0
2015 8676 0.0 0.0 0.0
2016 8616 0.0 0.0 0.0
2017 7957 0.0 0.0 0.0
2018 5388 0.0 0.0 0.0
2019 6521 0.0 0.0 0.0
2020 2116 0.0 0.0 0.0

For data sources see[5]

References