X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294240816000

Well Details

Well ID: 0294240816000
Loading map...
Location: 00/16-08-029-24W4/0
Location Alias: 00/16-08-29-24 W4M
Location Alias 2: 00/16-08-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 08
County/Municipality: Kneehill County
Well Name: ANDEX PETROCON SWALWELL 16-8-29-24
Operator Name: Bumper Development Corporation Ltd.
License Number: 0079487
License Date: 1979-11-26
License Status: Re-Entered
Spud Date: 1980-01-09
Final Drill Date: 1980-01-21
Well Total Depth: 1725.00 m
Surface Hole Latitude: 51.471438
Surface Hole Longitude: -113.338084

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-11-26 Obtained License
1980-01-16 Drill Stem Test Performed
1980-01-21 Finished Drilling
1980-01-21 Well Log Performed
1980-01-21 Well Mode changed to Drilled and Cased
1980-01-22 Drill Stem Test Performed
1980-01-24 Production Casing Operation Performed
1980-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-06 Perforation Treatment Performed - Jet Perforation
1980-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-11 Perforation Treatment Performed - Jet Perforation
1980-02-26 Well Began Production
1980-02-26 Well Fluid changed to Crude Oil
1980-02-26 Well Mode changed to Pumping
1985-08-31 Well Fluid changed to Crude Oil
1985-08-31 Well Mode changed to Suspended
1986-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-11-11 Plug Back Performed
1986-11-11 Well Abandoned
1986-11-11 Well Fluid changed to Crude Oil
1986-11-11 Well Log Performed
1986-11-11 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-02-06 Perforation 1656.00 1664.00 3
1980-02-06 Acid Treatment 1656.00 1664.00 0
1980-02-11 Perforation 1643.00 1645.50 3
1980-02-11 Perforation 1647.50 1651.00 3
1980-02-11 Acid Treatment 1643.00 1651.00 0
1986-11-11 Packing Device Capped w/Cement 1633.00 1641.00 0
1986-11-11 Packing Device Capped w/Cement 894.80 902.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 2046 0.0 0.0 0.0
1981 2597 0.0 0.0 0.0
1982 3528 0.0 0.0 0.0
1983 7703 0.0 0.0 0.0
1984 8388 0.0 0.0 0.0
1985 2346 0.0 0.0 0.0

For data sources see[5]

References