X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294241006000

Well Details

Well ID: 0294241006000
Loading map...
Location: 00/06-10-029-24W4/0
Location Alias: 00/06-10-29-24 W4M
Location Alias 2: 00/06-10-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 10
County/Municipality: Kneehill County
Well Name: PIONEER SWALWELL 6-10-29-24
Operator Name: TAQA North Ltd.
License Number: 0064896
License Date: 1977-07-21
License Status: Suspension
Spud Date: 1977-07-26
Final Drill Date: 1977-08-03
Well Total Depth: 1706.60 m
Surface Hole Latitude: 51.466063
Surface Hole Longitude: -113.299179

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-07-21 Obtained License
1977-07-26 Lost Circulation Occurred
1977-08-03 Finished Drilling
1977-08-03 Well Mode changed to Drilled and Cased
1977-08-04 Drill Stem Test Performed
1977-08-05 Drill Stem Test Performed
1977-08-06 Production Casing Operation Performed
1977-09-02 Perforation Treatment Performed - Jet Perforation
1977-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-09-07 Perforation Treatment Performed - Jet Perforation
1977-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-11 Well Began Production
1977-09-11 Well Fluid changed to Crude Oil
1977-09-11 Well Mode changed to Flowing
1978-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-19 Perforation Treatment Performed - Jet Perforation
1978-05-23 Well Fluid changed to Crude Oil
1978-05-23 Well Mode changed to Suspended
1986-11-01 Well Fluid changed to Crude Oil
1986-11-01 Well Mode changed to Pumping
1991-01-27 Perforation Treatment Performed - Fractured
1991-01-27 Perforation Treatment Performed - Jet Perforation
1991-01-27 Well Log Performed
1991-01-31 Well Fluid changed to Crude Oil
1991-01-31 Well Mode changed to Suspended
1993-05-28 Perforation Treatment Performed - Cement Squeeze
1993-05-28 Plug Back Performed
1993-05-29 Perforation Treatment Performed - Cement Squeeze
1993-05-29 Plug Back Performed
1993-05-29 Well Fluid changed to Crude Oil
1993-05-29 Well Mode changed to Suspended
1993-05-31 Perforation Treatment Performed - Jet Perforation
1993-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-07 Perforation Treatment Performed - Chemical Squeeze
1993-06-12 Well Fluid changed to Crude Oil
1993-06-12 Well Mode changed to Pumping
1993-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-23 Plug Back Performed
1994-03-23 Well Log Performed
1994-05-31 Well Log Performed
2000-02-08 Well Log Performed
2011-12-01 Well Fluid changed to Crude Oil
2011-12-01 Well Mode changed to Suspended
2014-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-11-22 Plug Back Performed
2014-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-11-23 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-09-02 Perforation 1684.30 1685.50 7
1991-01-27 Perforation 1407.00 1411.00 13
1991-01-27 Fracture 1407.00 1411.00 0
1993-05-28 Cement Squeeze 1407.00 1411.00 0
1993-05-29 Cement Squeeze 1407.00 1411.00 0
1993-05-31 Perforation 1645.00 1649.00 13
1993-06-02 Acid Treatment 1645.00 1669.40 0
1993-06-07 Chemical Squeeze 1652.00 1653.00 0
1993-07-07 Acid Treatment 1652.00 1669.40 0
2014-11-22 Packing Device Capped w/Cement 1625.00 1633.00 0
2014-11-23 Packing Device Capped w/Cement 1387.00 1395.00 0
1977-09-02 Perforation 1687.10 1688.30 7
2014-11-23 Packing Device Capped w/Cement 677.00 685.00 0
1977-09-03 Acid Treatment 1684.30 1688.30 0
1977-09-07 Packing Device Capped w/Cement 1673.40 1681.00 0
1977-09-07 Perforation 1652.30 1653.50 7
1977-09-08 Acid Treatment 1652.30 1653.50 0
1978-05-19 Perforation 1663.30 1665.10 7
1978-05-19 Perforation 1668.20 1669.40 7
1978-05-19 Acid Treatment 1663.30 1669.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 1344 0.0 0.0 0.0
1986 48 0.0 0.0 0.0
1987 4963 0.0 0.0 0.0
1988 8415 0.0 0.0 0.0
1989 8567 0.0 0.0 0.0
1990 2824 0.0 0.0 0.0
1991 576 0.0 0.0 0.0
1993 3992 0.0 0.0 0.0
1994 4596 0.0 0.0 0.0
1995 3992 0.0 0.0 0.0
2001 3672 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 2879 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-07-26 Lost Circulation 68.60 176.80
2014-11-15 No Incident Encountered 0.00 0.00

For data sources see[6]

References