X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294243016000

Well Details

Well ID: 0294243016000
Loading map...
Location: 00/16-30-029-24W4/0
Location Alias: 00/16-30-29-24 W4M
Location Alias 2: 00/16-30-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 30
County/Municipality: Kneehill County
Well Name: CZAR ET AL SWALWELL 16-30-29-24
Operator Name: Canadian Natural Resources Limited
License Number: 0053057
License Date: 1975-02-25
License Status: RecCertified
Spud Date: 1975-02-26
Final Drill Date: 1975-03-11
Well Total Depth: 1691.60 m
Surface Hole Latitude: 51.515684
Surface Hole Longitude: -113.358127

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-02-25 Obtained License
1975-03-08 Drill Stem Test Performed
1975-03-10 Drill Stem Test Performed
1975-03-11 Finished Drilling
1975-03-11 Well Mode changed to Drilled and Cased
1975-03-12 Drill Stem Test Performed
1975-03-13 Drill Stem Test Performed
1975-03-14 Production Casing Operation Performed
1975-03-21 Perforation Treatment Performed - Acid Wash - No Pressure
1975-03-21 Perforation Treatment Performed - Jet Perforation
1975-03-24 Well Began Production
1975-03-24 Well Fluid changed to Crude Oil
1975-03-24 Well Mode changed to Flowing
1975-04-04 Perforation Treatment Performed - Jet Perforation
1975-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-01 Well Fluid changed to Crude Oil
1976-12-01 Well Mode changed to Suspended
1977-06-30 Well Fluid changed to Crude Oil
1977-06-30 Well Mode changed to Flowing
1977-09-16 Well Fluid changed to Crude Oil
1977-09-16 Well Mode changed to Pumping
1977-11-01 Well Fluid changed to Crude Oil
1977-11-01 Well Mode changed to Suspended
1990-05-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-05-11 Plug Back Performed
1990-05-11 Well Log Performed
1990-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-05-12 Plug Back Performed
1990-05-12 Well Abandoned
1990-05-12 Well Fluid changed to Crude Oil
1990-05-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-03-21 Perforation 1666.60 1670.30 7
1975-03-21 Perforation 1636.20 1639.80 7
1975-03-21 Acid Wash 1636.20 1670.30 0
1975-04-04 Perforation 1614.20 1617.00 7
1975-04-06 Acid Treatment 1614.20 1617.00 0
1990-05-11 Packing Device Capped w/Cement 1622.00 1630.00 0
1990-05-12 Packing Device Capped w/Cement 1599.00 1607.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 3293 0.0 0.0 0.0
1976 7039 0.0 0.0 0.0
1977 2082 0.0 0.0 0.0

For data sources see[5]

References