If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294243506020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.524251,"lon":-113.27578,"icon":""}]} |
Location: 02/06-35-029-24W4/0 | |
Location Alias: 02/06-35-29-24 W4M | |
Location Alias 2: 02/06-35-029-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 24 | |
Section: 35 | |
County/Municipality: Kneehill County | |
Well Name: EMBER 102 SWALWELL 6-35-29-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0289381 | |
License Date: 2003-07-07 | |
License Status: Issued | |
Spud Date: 2003-08-01 | |
Final Drill Date: 2003-08-01 | |
Well Total Depth: 584.00 m | |
Surface Hole Latitude: 51.524251 | |
Surface Hole Longitude: -113.275780 |
Date | Event |
---|---|
2003-07-07 | Obtained License |
2003-08-01 | Finished Drilling |
2003-08-01 | Surface Casing Operation Performed |
2003-08-01 | Well Log Performed |
2003-08-01 | Well Mode changed to Drilled and Cased |
2003-08-02 | Production Casing Operation Performed |
2003-08-02 | Rig Released |
2003-09-18 | Well Log Performed |
2003-09-21 | Perforation Treatment Performed - Jet Perforation |
2003-09-21 | Well Log Performed |
2003-10-03 | Perforation Treatment Performed - Fractured |
2003-10-28 | Well Began Production |
2003-10-28 | Well Fluid changed to Coalbed Methane-Coals Only |
2003-10-28 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-09-21 | Perforation | 377.60 | 378.10 | 17 |
2003-09-21 | Perforation | 496.40 | 496.90 | 17 |
2003-09-21 | Perforation | 198.50 | 199.00 | 17 |
2003-09-21 | Perforation | 480.00 | 480.50 | 17 |
2003-09-21 | Perforation | 438.90 | 439.40 | 17 |
2003-09-21 | Perforation | 378.70 | 379.20 | 17 |
2003-09-21 | Perforation | 502.50 | 503.00 | 17 |
2003-09-21 | Perforation | 251.60 | 252.10 | 17 |
2003-09-21 | Perforation | 322.30 | 322.80 | 17 |
2003-09-21 | Perforation | 507.70 | 508.20 | 17 |
2003-09-21 | Perforation | 370.60 | 371.10 | 17 |
2003-09-21 | Perforation | 396.00 | 396.50 | 17 |
2003-09-21 | Perforation | 511.50 | 512.00 | 17 |
2003-09-21 | Perforation | 391.10 | 391.60 | 17 |
2003-10-03 | Fracture | 519.40 | 519.90 | 0 |
2003-10-03 | Fracture | 511.50 | 512.00 | 0 |
2003-10-03 | Fracture | 507.70 | 508.20 | 0 |
2003-10-03 | Fracture | 502.50 | 503.00 | 0 |
2003-10-03 | Fracture | 496.40 | 496.90 | 0 |
2003-10-03 | Fracture | 480.00 | 480.50 | 0 |
2003-10-03 | Fracture | 472.60 | 473.10 | 0 |
2003-10-03 | Fracture | 443.30 | 444.30 | 0 |
2003-09-21 | Perforation | 443.30 | 444.30 | 17 |
2003-10-03 | Fracture | 438.90 | 439.40 | 0 |
2003-10-03 | Fracture | 433.00 | 433.50 | 0 |
2003-10-03 | Fracture | 426.50 | 427.00 | 0 |
2003-10-03 | Fracture | 420.20 | 420.70 | 0 |
2003-10-03 | Fracture | 396.00 | 396.50 | 0 |
2003-10-03 | Fracture | 391.10 | 391.60 | 0 |
2003-10-03 | Fracture | 377.60 | 379.20 | 0 |
2003-10-03 | Fracture | 374.60 | 375.10 | 0 |
2003-10-03 | Fracture | 370.60 | 371.10 | 0 |
2003-09-21 | Perforation | 426.50 | 427.00 | 17 |
2003-09-21 | Perforation | 433.00 | 433.50 | 17 |
2003-09-21 | Perforation | 374.60 | 375.10 | 17 |
2003-09-21 | Perforation | 519.40 | 519.90 | 17 |
2003-09-21 | Perforation | 420.20 | 420.70 | 17 |
2003-09-21 | Perforation | 472.60 | 473.10 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 1551 | 0.0 | 0.0 | 0.0 |
2004 | 8659 | 0.0 | 0.0 | 0.0 |
2005 | 8695 | 0.0 | 0.0 | 0.0 |
2006 | 5880 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 7942 | 0.0 | 0.0 | 0.0 |
2013 | 5898 | 0.0 | 0.0 | 0.0 |
2014 | 8751 | 0.0 | 0.0 | 0.0 |
2015 | 8754 | 0.0 | 0.0 | 0.0 |
2016 | 8778 | 0.0 | 0.0 | 0.0 |
2017 | 8696 | 0.0 | 0.0 | 0.0 |
2018 | 8701 | 0.0 | 0.0 | 0.0 |
2019 | 8577 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]