X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294250306020

Well Details

Well ID: 0294250306020
Loading map...
Location: 02/06-03-029-25W4/0
Location Alias: 02/06-03-29-25 W4M
Location Alias 2: 02/06-03-029-25 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 25
Section: 03
County/Municipality: Kneehill County
Well Name: EMBER 102 ENTICE 6-3-29-25
Operator Name: Ember Resources Inc.
License Number: 0319907
License Date: 2004-11-26
License Status: Issued
Spud Date: 2004-12-06
Final Drill Date: 2004-12-07
Well Total Depth: 936.00 m
Surface Hole Latitude: 51.449433
Surface Hole Longitude: -113.442846

For data sources see[1][2]

Well History

Date Event
2004-11-26 Obtained License
2004-12-06 Surface Casing Operation Performed
2004-12-07 Finished Drilling
2004-12-07 Production Casing Operation Performed
2004-12-07 Rig Released
2004-12-07 Well Log Performed
2004-12-07 Well Mode changed to Drilled and Cased
2004-12-17 Well Log Performed
2005-01-16 Well Log Performed
2005-01-17 Perforation Treatment Performed - Jet Perforation
2005-05-04 Well Began Production
2005-05-04 Well Fluid changed to Gas
2005-05-04 Well Mode changed to Flowing
2005-05-12 Perforation Treatment Performed - Jet Perforation
2005-05-12 Well Log Performed
2005-05-14 Perforation Treatment Performed - Fractured
2008-10-11 Well Fluid changed to Coalbed Methane-Coals and Other
2008-10-11 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-01-17 Perforation 648.70 651.20 17
2005-05-12 Perforation 538.00 539.00 13
2005-05-12 Perforation 547.20 548.20 13
2005-05-12 Perforation 554.00 554.50 13
2005-05-12 Perforation 556.20 557.20 13
2005-05-12 Perforation 565.00 566.50 13
2005-05-14 Fracture 565.00 566.50 0
2005-05-14 Fracture 556.20 557.20 0
2005-05-14 Fracture 554.00 554.50 0
2005-05-14 Fracture 547.20 548.20 0
2005-05-14 Fracture 538.00 539.00 0
2005-01-17 Perforation 653.80 655.80 17
2005-05-14 Fracture 530.00 531.00 0
2005-05-14 Fracture 516.70 517.70 0
2005-05-14 Fracture 490.80 491.80 0
2005-05-14 Fracture 467.50 468.50 0
2005-05-14 Fracture 428.50 430.50 0
2005-05-14 Fracture 418.50 419.50 0
2005-05-14 Fracture 414.50 415.50 0
2005-05-12 Perforation 414.50 415.50 13
2005-05-12 Perforation 418.50 419.50 13
2005-05-12 Perforation 428.50 430.50 13
2005-05-12 Perforation 467.50 468.50 13
2005-05-12 Perforation 490.80 491.80 13
2005-05-12 Perforation 516.70 517.70 13
2005-05-12 Perforation 530.00 531.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 5717 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8779 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8747 0.0 0.0 0.0
2011 8401 0.0 0.0 0.0
2012 8317 0.0 0.0 0.0
2013 8580 0.0 0.0 0.0
2014 8477 0.0 0.0 0.0
2015 8669 0.0 0.0 0.0
2016 8426 0.0 0.0 0.0
2017 7519 0.0 0.0 0.0
2018 5925 0.0 0.0 0.0
2019 7838 0.0 0.0 0.0
2020 2122 0.0 0.0 0.0

For data sources see[5]

References