X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294250308000

Well Details

Well ID: 0294250308000
Loading map...
Location: 00/08-03-029-25W4/0
Location Alias: 00/08-03-29-25 W4M
Location Alias 2: 00/08-03-029-25 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 25
Section: 03
County/Municipality: Kneehill County
Well Name: EMBER ENTICE 8-3-29-25
Operator Name: Ember Resources Inc.
License Number: 0319928
License Date: 2004-11-26
License Status: Issued
Spud Date: 2005-01-01
Final Drill Date: 2005-01-03
Well Total Depth: 933.00 m
Surface Hole Latitude: 51.450749
Surface Hole Longitude: -113.432255

For data sources see[1][2]

Well History

Date Event
2004-01-09 Well Log Performed
2004-11-26 Obtained License
2005-01-01 Production Casing Operation Performed
2005-01-01 Surface Casing Operation Performed
2005-01-03 Finished Drilling
2005-01-03 Rig Released
2005-01-03 Well Mode changed to Drilled and Cased
2005-01-22 Perforation Treatment Performed - Jet Perforation
2005-01-22 Well Log Performed
2005-01-24 Perforation Treatment Performed - Fractured
2005-02-03 Well Began Production
2005-02-03 Well Fluid changed to Coalbed Methane-Coals Only
2005-02-03 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-01-22 Perforation 174.50 175.50 17
2005-01-22 Perforation 455.00 457.00 17
2005-01-22 Perforation 459.10 459.60 17
2005-01-22 Perforation 467.00 468.50 17
2005-01-22 Perforation 476.20 477.70 17
2005-01-22 Perforation 502.00 503.00 17
2005-01-22 Perforation 505.00 506.00 17
2005-01-22 Perforation 507.50 508.50 17
2005-01-22 Perforation 523.00 524.00 17
2005-01-22 Perforation 528.80 529.30 17
2005-01-22 Perforation 530.00 531.00 17
2005-01-22 Perforation 180.50 181.00 17
2005-01-22 Perforation 544.80 545.00 17
2005-01-22 Perforation 547.00 548.00 17
2005-01-22 Perforation 555.00 556.50 17
2005-01-22 Perforation 568.50 569.00 17
2005-01-24 Fracture 568.50 569.00 0
2005-01-24 Fracture 555.00 556.50 0
2005-01-24 Fracture 547.00 548.00 0
2005-01-24 Fracture 544.80 545.00 0
2005-01-24 Fracture 530.00 531.00 0
2005-01-24 Fracture 528.80 529.30 0
2005-01-22 Perforation 184.50 185.50 17
2005-01-24 Fracture 505.00 506.00 0
2005-01-24 Fracture 502.00 503.00 0
2005-01-24 Fracture 476.20 477.70 0
2005-01-24 Fracture 459.10 459.60 0
2005-01-24 Fracture 455.00 457.00 0
2005-01-24 Fracture 452.00 452.50 0
2005-01-24 Fracture 429.00 429.50 0
2005-01-24 Fracture 418.00 420.00 0
2005-01-24 Fracture 408.60 409.60 0
2005-01-24 Fracture 406.00 407.50 0
2005-01-22 Perforation 229.00 229.50 17
2005-01-24 Fracture 229.00 229.50 0
2005-01-24 Fracture 184.50 185.50 0
2005-01-24 Fracture 180.50 185.50 0
2005-01-24 Fracture 180.50 181.00 0
2005-01-24 Fracture 174.50 175.50 0
2005-01-22 Perforation 406.00 407.50 17
2005-01-22 Perforation 408.60 409.60 17
2005-01-22 Perforation 418.00 420.00 17
2005-01-22 Perforation 429.00 429.50 17
2005-01-22 Perforation 452.00 452.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 7631 0.0 0.0 0.0
2006 8039 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8781 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8747 0.0 0.0 0.0
2011 8401 0.0 0.0 0.0
2012 8394 0.0 0.0 0.0
2013 8580 0.0 0.0 0.0
2014 8477 0.0 0.0 0.0
2015 8669 0.0 0.0 0.0
2016 8426 0.0 0.0 0.0
2017 7519 0.0 0.0 0.0
2018 5925 0.0 0.0 0.0
2019 7192 0.0 0.0 0.0
2020 1384 0.0 0.0 0.0

For data sources see[5]

References