X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294251206020

Well Details

Well ID: 0294251206020
Loading map...
Location: 02/06-12-029-25W4/0
Location Alias: 02/06-12-29-25 W4M
Location Alias 2: 02/06-12-029-25 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 25
Section: 12
County/Municipality: Kneehill County
Well Name: EMBER 102 ENTICE 6-12-29-25
Operator Name: Ember Resources Inc.
License Number: 0327486
License Date: 2005-03-02
License Status: Issued
Spud Date: 2005-03-22
Final Drill Date: 2005-03-24
Well Total Depth: 931.00 m
Surface Hole Latitude: 51.463724
Surface Hole Longitude: -113.397276

For data sources see[1][2]

Well History

Date Event
2005-03-02 Obtained License
2005-03-22 Surface Casing Operation Performed
2005-03-24 Finished Drilling
2005-03-24 Production Casing Operation Performed
2005-03-24 Rig Released
2005-03-24 Well Mode changed to Drilled and Cased
2005-04-07 Well Log Performed
2005-04-15 Perforation Treatment Performed - Jet Perforation
2005-04-15 Well Log Performed
2005-04-24 Perforation Treatment Performed - Fractured
2005-06-24 Well Began Production
2005-06-24 Well Fluid changed to Coalbed Methane-Coals Only
2005-06-24 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-04-15 Perforation 188.20 189.20 17
2005-04-15 Perforation 507.00 508.00 17
2005-04-15 Perforation 511.50 512.50 17
2005-04-15 Perforation 525.50 526.00 17
2005-04-15 Perforation 533.50 535.00 17
2005-04-15 Perforation 543.90 544.40 17
2005-04-15 Perforation 551.70 552.20 17
2005-04-15 Perforation 552.90 553.40 17
2005-04-15 Perforation 559.60 560.60 17
2005-04-15 Perforation 577.00 577.50 17
2005-04-24 Fracture 577.00 577.50 0
2005-04-15 Perforation 295.00 296.00 17
2005-04-24 Fracture 559.60 560.60 0
2005-04-24 Fracture 552.90 553.40 0
2005-04-24 Fracture 551.70 552.20 0
2005-04-24 Fracture 543.90 544.40 0
2005-04-24 Fracture 533.50 535.00 0
2005-04-24 Fracture 525.50 526.00 0
2005-04-24 Fracture 511.50 512.50 0
2005-04-24 Fracture 507.00 508.00 0
2005-04-24 Fracture 478.80 479.80 0
2005-04-24 Fracture 456.40 457.90 0
2005-04-15 Perforation 405.00 406.00 17
2005-04-24 Fracture 431.60 432.10 0
2005-04-24 Fracture 420.30 421.80 0
2005-04-24 Fracture 418.00 418.50 0
2005-04-24 Fracture 407.00 408.00 0
2005-04-24 Fracture 405.00 406.00 0
2005-04-24 Fracture 295.00 296.00 0
2005-04-24 Fracture 188.20 189.20 0
2005-04-15 Perforation 407.20 408.20 17
2005-04-15 Perforation 418.00 418.50 17
2005-04-15 Perforation 420.30 421.80 17
2005-04-15 Perforation 431.60 432.10 17
2005-04-15 Perforation 456.40 457.90 17
2005-04-15 Perforation 478.80 479.80 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 4584 0.0 0.0 0.0
2006 8039 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8589 0.0 0.0 0.0
2011 8596 0.0 0.0 0.0
2012 8467 0.0 0.0 0.0
2013 8715 0.0 0.0 0.0
2014 8606 0.0 0.0 0.0
2015 8702 0.0 0.0 0.0
2016 8728 0.0 0.0 0.0
2017 8093 0.0 0.0 0.0
2018 6030 0.0 0.0 0.0
2019 8161 0.0 0.0 0.0
2020 2055 0.0 0.0 0.0

For data sources see[5]

References