If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294251206020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.463724,"lon":-113.397276,"icon":""}]} |
Location: 02/06-12-029-25W4/0 | |
Location Alias: 02/06-12-29-25 W4M | |
Location Alias 2: 02/06-12-029-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 25 | |
Section: 12 | |
County/Municipality: Kneehill County | |
Well Name: EMBER 102 ENTICE 6-12-29-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0327486 | |
License Date: 2005-03-02 | |
License Status: Issued | |
Spud Date: 2005-03-22 | |
Final Drill Date: 2005-03-24 | |
Well Total Depth: 931.00 m | |
Surface Hole Latitude: 51.463724 | |
Surface Hole Longitude: -113.397276 |
Date | Event |
---|---|
2005-03-02 | Obtained License |
2005-03-22 | Surface Casing Operation Performed |
2005-03-24 | Finished Drilling |
2005-03-24 | Production Casing Operation Performed |
2005-03-24 | Rig Released |
2005-03-24 | Well Mode changed to Drilled and Cased |
2005-04-07 | Well Log Performed |
2005-04-15 | Perforation Treatment Performed - Jet Perforation |
2005-04-15 | Well Log Performed |
2005-04-24 | Perforation Treatment Performed - Fractured |
2005-06-24 | Well Began Production |
2005-06-24 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-06-24 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-04-15 | Perforation | 188.20 | 189.20 | 17 |
2005-04-15 | Perforation | 507.00 | 508.00 | 17 |
2005-04-15 | Perforation | 511.50 | 512.50 | 17 |
2005-04-15 | Perforation | 525.50 | 526.00 | 17 |
2005-04-15 | Perforation | 533.50 | 535.00 | 17 |
2005-04-15 | Perforation | 543.90 | 544.40 | 17 |
2005-04-15 | Perforation | 551.70 | 552.20 | 17 |
2005-04-15 | Perforation | 552.90 | 553.40 | 17 |
2005-04-15 | Perforation | 559.60 | 560.60 | 17 |
2005-04-15 | Perforation | 577.00 | 577.50 | 17 |
2005-04-24 | Fracture | 577.00 | 577.50 | 0 |
2005-04-15 | Perforation | 295.00 | 296.00 | 17 |
2005-04-24 | Fracture | 559.60 | 560.60 | 0 |
2005-04-24 | Fracture | 552.90 | 553.40 | 0 |
2005-04-24 | Fracture | 551.70 | 552.20 | 0 |
2005-04-24 | Fracture | 543.90 | 544.40 | 0 |
2005-04-24 | Fracture | 533.50 | 535.00 | 0 |
2005-04-24 | Fracture | 525.50 | 526.00 | 0 |
2005-04-24 | Fracture | 511.50 | 512.50 | 0 |
2005-04-24 | Fracture | 507.00 | 508.00 | 0 |
2005-04-24 | Fracture | 478.80 | 479.80 | 0 |
2005-04-24 | Fracture | 456.40 | 457.90 | 0 |
2005-04-15 | Perforation | 405.00 | 406.00 | 17 |
2005-04-24 | Fracture | 431.60 | 432.10 | 0 |
2005-04-24 | Fracture | 420.30 | 421.80 | 0 |
2005-04-24 | Fracture | 418.00 | 418.50 | 0 |
2005-04-24 | Fracture | 407.00 | 408.00 | 0 |
2005-04-24 | Fracture | 405.00 | 406.00 | 0 |
2005-04-24 | Fracture | 295.00 | 296.00 | 0 |
2005-04-24 | Fracture | 188.20 | 189.20 | 0 |
2005-04-15 | Perforation | 407.20 | 408.20 | 17 |
2005-04-15 | Perforation | 418.00 | 418.50 | 17 |
2005-04-15 | Perforation | 420.30 | 421.80 | 17 |
2005-04-15 | Perforation | 431.60 | 432.10 | 17 |
2005-04-15 | Perforation | 456.40 | 457.90 | 17 |
2005-04-15 | Perforation | 478.80 | 479.80 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 4584 | 0.0 | 0.0 | 0.0 |
2006 | 8039 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8589 | 0.0 | 0.0 | 0.0 |
2011 | 8596 | 0.0 | 0.0 | 0.0 |
2012 | 8467 | 0.0 | 0.0 | 0.0 |
2013 | 8715 | 0.0 | 0.0 | 0.0 |
2014 | 8606 | 0.0 | 0.0 | 0.0 |
2015 | 8702 | 0.0 | 0.0 | 0.0 |
2016 | 8728 | 0.0 | 0.0 | 0.0 |
2017 | 8093 | 0.0 | 0.0 | 0.0 |
2018 | 6030 | 0.0 | 0.0 | 0.0 |
2019 | 8161 | 0.0 | 0.0 | 0.0 |
2020 | 2055 | 0.0 | 0.0 | 0.0 |
For data sources see[5]