X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294251408000

Well Details

Well ID: 0294251408000
Loading map...
Location: 00/08-14-029-25W4/0
Location Alias: 00/08-14-29-25 W4M
Location Alias 2: 00/08-14-029-25 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 25
Section: 14
County/Municipality: Kneehill County
Well Name: EMBER ENTICE 8-14-29-25
Operator Name: Ember Resources Inc.
License Number: 0318977
License Date: 2004-11-16
License Status: Issued
Spud Date: 2004-12-07
Final Drill Date: 2004-12-07
Well Total Depth: 929.00 m
Surface Hole Latitude: 51.480678
Surface Hole Longitude: -113.405322

For data sources see[1][2]

Well History

Date Event
2004-11-16 Obtained License
2004-12-07 Finished Drilling
2004-12-07 Production Casing Operation Performed
2004-12-07 Surface Casing Operation Performed
2004-12-07 Well Mode changed to Drilled and Cased
2004-12-08 Rig Released
2004-12-15 Well Log Performed
2004-12-17 Well Log Performed
2005-01-08 Perforation Treatment Performed - Jet Perforation
2005-01-08 Well Log Performed
2005-01-22 Perforation Treatment Performed - Fractured
2005-01-28 Well Began Production
2005-01-28 Well Fluid changed to Coalbed Methane-Coals Only
2005-01-28 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-01-08 Perforation 175.00 175.50 17
2005-01-08 Perforation 459.60 460.10 17
2005-01-08 Perforation 467.50 468.50 17
2005-01-08 Perforation 500.00 500.50 17
2005-01-08 Perforation 512.50 513.00 17
2005-01-08 Perforation 524.40 525.90 17
2005-01-08 Perforation 535.00 535.50 17
2005-01-08 Perforation 543.80 544.30 17
2005-01-08 Perforation 544.70 545.70 17
2005-01-08 Perforation 550.60 551.60 17
2005-01-08 Perforation 568.50 569.00 17
2005-01-08 Perforation 176.70 177.20 17
2005-01-08 Perforation 570.00 570.50 17
2005-01-22 Fracture 570.00 570.50 0
2005-01-22 Fracture 568.50 569.00 0
2005-01-22 Fracture 550.60 551.60 0
2005-01-22 Fracture 544.70 545.70 0
2005-01-22 Fracture 543.80 544.30 0
2005-01-22 Fracture 535.00 535.50 0
2005-01-22 Fracture 524.40 525.90 0
2005-01-22 Fracture 512.50 513.00 0
2005-01-22 Fracture 500.00 500.50 0
2005-01-08 Perforation 293.00 293.50 17
2005-01-22 Fracture 467.50 468.50 0
2005-01-22 Fracture 459.60 460.10 0
2005-01-22 Fracture 447.00 448.50 0
2005-01-22 Fracture 423.50 424.00 0
2005-01-22 Fracture 411.00 413.00 0
2005-01-22 Fracture 409.20 409.70 0
2005-01-22 Fracture 396.20 398.20 0
2005-01-22 Fracture 346.50 347.00 0
2005-01-22 Fracture 293.00 293.50 0
2005-01-22 Fracture 176.70 177.20 0
2005-01-08 Perforation 346.50 347.00 17
2005-01-22 Fracture 175.00 175.50 0
2005-01-08 Perforation 396.20 398.20 17
2005-01-08 Perforation 409.20 409.70 17
2005-01-08 Perforation 411.00 413.00 17
2005-01-08 Perforation 423.50 424.00 17
2005-01-08 Perforation 447.00 448.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 8111 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8568 0.0 0.0 0.0
2008 8781 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8734 0.0 0.0 0.0
2011 8468 0.0 0.0 0.0
2012 8565 0.0 0.0 0.0
2013 8646 0.0 0.0 0.0
2014 8696 0.0 0.0 0.0
2015 8731 0.0 0.0 0.0
2016 8697 0.0 0.0 0.0
2017 8163 0.0 0.0 0.0
2018 7311 0.0 0.0 0.0
2019 8722 0.0 0.0 0.0
2020 2110 0.0 0.0 0.0

For data sources see[5]

References