If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294251908000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.487913,"lon":-113.501301,"icon":""}]} |
Location: 00/08-19-029-25W4/0 | |
Location Alias: 00/08-19-29-25 W4M | |
Location Alias 2: 00/08-19-029-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 25 | |
Section: 19 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SWALWELL 8-19-29-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0404588 | |
License Date: 2008-11-25 | |
License Status: Amended | |
Spud Date: 2008-11-28 | |
Final Drill Date: 2008-11-29 | |
Well Total Depth: 1233.00 m | |
Surface Hole Latitude: 51.487913 | |
Surface Hole Longitude: -113.501301 |
Date | Event |
---|---|
2008-11-25 | Obtained License |
2008-11-28 | Surface Casing Operation Performed |
2008-11-29 | Direction Drilling Operation Performed - Deviate |
2008-11-29 | Finished Drilling |
2008-11-29 | Well Mode changed to Drilled and Cased |
2008-11-30 | Production Casing Operation Performed |
2008-11-30 | Rig Released |
2008-12-08 | Well Log Performed |
2009-01-04 | Perforation Treatment Performed - Jet Perforation |
2009-01-09 | Perforation Treatment Performed - Jet Perforation |
2009-01-18 | Perforation Treatment Performed - Jet Perforation |
2009-02-03 | Perforation Treatment Performed - Jet Perforation |
2009-02-06 | Perforation Treatment Performed - Fractured |
2009-02-27 | Well Began Production |
2009-02-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-02-27 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2008-11-29 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-01-04 | Perforation | 991.50 | 992.50 | 13 |
2009-02-03 | Perforation | 465.30 | 465.80 | 13 |
2009-02-03 | Perforation | 284.30 | 285.30 | 13 |
2009-02-03 | Perforation | 731.00 | 733.00 | 13 |
2009-02-03 | Perforation | 683.00 | 685.00 | 13 |
2009-02-03 | Perforation | 447.50 | 448.00 | 13 |
2009-02-03 | Perforation | 429.80 | 430.30 | 13 |
2009-02-03 | Perforation | 287.20 | 289.20 | 13 |
2009-02-03 | Perforation | 618.30 | 619.30 | 13 |
2009-02-03 | Perforation | 773.10 | 773.60 | 13 |
2009-02-03 | Perforation | 763.50 | 764.00 | 13 |
2009-01-09 | Perforation | 636.00 | 639.00 | 13 |
2009-02-03 | Perforation | 755.70 | 756.70 | 13 |
2009-02-03 | Perforation | 795.60 | 796.60 | 13 |
2009-02-03 | Perforation | 785.50 | 786.00 | 13 |
2009-02-03 | Perforation | 780.50 | 781.00 | 13 |
2009-02-03 | Perforation | 747.20 | 749.20 | 13 |
2009-02-03 | Perforation | 670.50 | 671.00 | 13 |
2009-02-03 | Perforation | 652.60 | 653.60 | 13 |
2009-02-03 | Perforation | 645.10 | 645.60 | 13 |
2009-02-03 | Perforation | 713.50 | 714.50 | 13 |
2009-02-03 | Perforation | 734.90 | 735.90 | 13 |
2009-01-18 | Perforation | 510.00 | 513.00 | 13 |
2009-02-03 | Perforation | 679.60 | 680.60 | 13 |
2009-02-06 | Fracture | 683.00 | 733.00 | 0 |
2009-02-06 | Fracture | 284.30 | 796.60 | 0 |
2009-02-03 | Perforation | 592.10 | 593.10 | 13 |
2009-02-03 | Perforation | 590.60 | 591.60 | 13 |
2009-02-03 | Perforation | 519.80 | 520.30 | 13 |
2009-02-03 | Perforation | 611.70 | 612.20 | 13 |
2009-02-03 | Perforation | 606.80 | 608.80 | 13 |
2009-02-03 | Perforation | 594.80 | 595.30 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 7391 | 0.0 | 0.0 | 0.0 |
2010 | 8715 | 0.0 | 0.0 | 0.0 |
2011 | 8757 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8739 | 0.0 | 0.0 | 0.0 |
2016 | 8752 | 0.0 | 0.0 | 0.0 |
2017 | 8683 | 0.0 | 0.0 | 0.0 |
2018 | 8725 | 0.0 | 0.0 | 0.0 |
2019 | 8698 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]