X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294252316000

Well Details

Well ID: 0294252316000
Loading map...
Location: 00/16-23-029-25W4/0
Location Alias: 00/16-23-29-25 W4M
Location Alias 2: 00/16-23-029-25 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 25
Section: 23
County/Municipality: Kneehill County
Well Name: DELHI BANFF ACME NO. 2
Operator Name: Sulpetro Limited
License Number: 0008398
License Date: 1954-08-23
License Status: RecExempt
Spud Date: 1954-09-08
Final Drill Date: 1954-10-20
Well Total Depth: 2140.30 m
Surface Hole Latitude: 51.501441
Surface Hole Longitude: -113.407039

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-08-23 Obtained License
1954-09-26 Drill Stem Test Performed
1954-10-01 Perforation Treatment Performed - Acid Wash - No Pressure
1954-10-01 Perforation Treatment Performed - Bullet Perforation
1954-10-16 Drill Stem Test Performed
1954-10-20 Drill Stem Test Performed
1954-10-20 Finished Drilling
1954-10-20 Production Casing Operation Performed
1954-10-20 Well Mode changed to Drilled and Cased
1954-11-08 Well Began Production
1954-11-08 Well Fluid changed to Crude Oil
1954-11-08 Well Mode changed to Flowing
1954-12-13 Well Fluid changed to Crude Oil
1954-12-13 Well Mode changed to Suspended
1955-03-07 Well Fluid changed to Crude Oil
1955-03-07 Well Mode changed to Flowing
1955-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-03-17 Perforation Treatment Performed - Cement Squeeze
1955-03-20 Perforation Treatment Performed - Bullet Perforation
1955-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-05-06 Perforation Treatment Performed - Acid Wash - No Pressure
1955-05-06 Perforation Treatment Performed - Bullet Perforation
1955-05-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1955-05-07 Perforation Treatment Performed - Bullet Perforation
1955-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-05-10 Perforation Treatment Performed - Jet Perforation
1955-05-13 Perforation Treatment Performed - Cement Plug
1955-05-14 Perforation Treatment Performed - Jet Perforation
1955-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-05-22 Perforation Treatment Performed - Cement Squeeze
1955-05-22 Well Abandoned
1955-05-22 Well Fluid changed to Crude Oil
1955-05-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-10-01 Bullet Perforation 2080.60 2082.40 13
1955-05-07 Packing Device Capped w/Cement 2087.90 2090.90 0
1955-05-07 Bullet Perforation 2087.30 2087.90 13
1955-05-08 Acid Treatment 2080.60 2087.90 0
1955-05-10 Perforation 2083.30 2085.10 13
1955-05-13 Cement Plug 2005.60 2069.60 0
1955-05-14 Perforation 1678.20 1679.80 7
1955-05-14 Perforation 1682.20 1685.20 7
1955-05-14 Perforation 1687.10 1690.10 7
1955-05-15 Acid Treatment 1678.20 1690.10 0
1955-05-22 Cement Squeeze 1678.20 1690.10 0
1954-10-01 Acid Wash 2080.60 2082.40 0
1955-03-17 Acid Treatment 2080.60 2082.40 0
1955-03-17 Cement Squeeze 2080.60 2082.40 0
1955-03-20 Bullet Perforation 2080.60 2082.40 0
1955-03-22 Acid Treatment 2080.60 2082.40 0
1955-03-25 Acid Treatment 2080.60 2082.40 0
1955-05-06 Acid Wash 2080.60 2082.40 0
1955-05-06 Bullet Perforation 2083.30 2085.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References