If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294260812000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.470155,"lon":-113.633506,"icon":""}]} |
Location: 00/12-08-029-26W4/0 | |
Location Alias: 00/12-08-29-26 W4M | |
Location Alias 2: 00/12-08-029-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 26 | |
Section: 08 | |
County/Municipality: Kneehill County | |
Well Name: EMBER ET AL SWALWELL 12-8-29-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0417532 | |
License Date: 2010-01-19 | |
License Status: Issued | |
Spud Date: 2010-01-23 | |
Final Drill Date: 2010-01-24 | |
Well Total Depth: 1064.00 m | |
Surface Hole Latitude: 51.470155 | |
Surface Hole Longitude: -113.633506 |
Date | Event |
---|---|
2010-01-19 | Obtained License |
2010-01-23 | Surface Casing Operation Performed |
2010-01-24 | Finished Drilling |
2010-01-24 | Well Mode changed to Drilled and Cased |
2010-01-25 | Production Casing Operation Performed |
2010-01-25 | Well Log Performed |
2010-01-26 | Rig Released |
2010-02-04 | Perforation Treatment Performed - Jet Perforation |
2010-02-04 | Well Log Performed |
2010-02-06 | Perforation Treatment Performed - Fractured |
2010-03-03 | Well Began Production |
2010-03-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-03-03 | Well Mode changed to Flowing |
2010-07-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-04 | Perforation | 714.60 | 715.10 | 13 |
2010-02-04 | Perforation | 610.30 | 611.30 | 13 |
2010-02-04 | Perforation | 599.70 | 603.70 | 13 |
2010-02-04 | Perforation | 587.70 | 588.20 | 13 |
2010-02-04 | Perforation | 580.20 | 580.70 | 13 |
2010-02-04 | Perforation | 544.60 | 545.10 | 13 |
2010-02-04 | Perforation | 529.20 | 529.70 | 13 |
2010-02-04 | Perforation | 519.00 | 520.50 | 13 |
2010-02-04 | Perforation | 509.00 | 510.00 | 13 |
2010-02-04 | Perforation | 448.00 | 449.00 | 13 |
2010-02-04 | Perforation | 422.20 | 422.70 | 13 |
2010-02-04 | Perforation | 706.40 | 706.90 | 13 |
2010-02-04 | Perforation | 412.50 | 413.00 | 13 |
2010-02-04 | Perforation | 309.10 | 309.60 | 13 |
2010-02-04 | Perforation | 296.90 | 297.40 | 13 |
2010-02-04 | Perforation | 282.60 | 283.10 | 13 |
2010-02-04 | Perforation | 958.80 | 960.80 | 17 |
2010-02-04 | Perforation | 932.70 | 933.70 | 17 |
2010-02-04 | Perforation | 851.60 | 852.60 | 17 |
2010-02-04 | Perforation | 814.60 | 815.60 | 17 |
2010-02-04 | Perforation | 811.70 | 812.70 | 17 |
2010-02-06 | Fracture | 958.80 | 960.80 | 0 |
2010-02-04 | Perforation | 702.60 | 703.60 | 13 |
2010-02-06 | Fracture | 932.70 | 933.70 | 0 |
2010-02-06 | Fracture | 851.60 | 852.60 | 0 |
2010-02-06 | Fracture | 814.60 | 815.60 | 0 |
2010-02-06 | Fracture | 811.70 | 812.70 | 0 |
2010-02-06 | Fracture | 714.60 | 715.10 | 0 |
2010-02-06 | Fracture | 706.40 | 706.90 | 0 |
2010-02-06 | Fracture | 702.60 | 703.60 | 0 |
2010-02-06 | Fracture | 686.80 | 692.30 | 0 |
2010-02-06 | Fracture | 673.50 | 674.50 | 0 |
2010-02-06 | Fracture | 658.00 | 658.50 | 0 |
2010-02-04 | Perforation | 686.80 | 692.30 | 13 |
2010-02-06 | Fracture | 651.60 | 652.10 | 0 |
2010-02-06 | Fracture | 641.70 | 642.20 | 0 |
2010-02-06 | Fracture | 639.50 | 640.50 | 0 |
2010-02-06 | Fracture | 610.30 | 611.30 | 0 |
2010-02-06 | Fracture | 599.70 | 603.70 | 0 |
2010-02-06 | Fracture | 587.70 | 588.20 | 0 |
2010-02-06 | Fracture | 580.20 | 580.70 | 0 |
2010-02-06 | Fracture | 544.60 | 545.10 | 0 |
2010-02-06 | Fracture | 529.20 | 529.70 | 0 |
2010-02-06 | Fracture | 519.00 | 520.50 | 0 |
2010-02-04 | Perforation | 673.50 | 674.50 | 13 |
2010-02-06 | Fracture | 509.00 | 510.00 | 0 |
2010-02-06 | Fracture | 448.00 | 449.00 | 0 |
2010-02-06 | Fracture | 422.20 | 422.70 | 0 |
2010-02-06 | Fracture | 412.50 | 413.00 | 0 |
2010-02-06 | Fracture | 309.10 | 309.60 | 0 |
2010-02-06 | Fracture | 296.90 | 297.40 | 0 |
2010-02-06 | Fracture | 282.60 | 283.10 | 0 |
2010-07-08 | Packing Device Capped w/Cement | 798.80 | 806.80 | 0 |
2010-02-04 | Perforation | 658.00 | 658.50 | 13 |
2010-02-04 | Perforation | 651.60 | 652.10 | 13 |
2010-02-04 | Perforation | 641.70 | 642.20 | 13 |
2010-02-04 | Perforation | 639.50 | 640.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 7202 | 0.0 | 0.0 | 0.0 |
2011 | 8633 | 0.0 | 0.0 | 0.0 |
2012 | 8749 | 0.0 | 0.0 | 0.0 |
2013 | 8713 | 0.0 | 0.0 | 0.0 |
2014 | 4674 | 0.0 | 0.0 | 0.0 |
2015 | 5100 | 0.0 | 0.0 | 0.0 |
2016 | 8702 | 0.0 | 0.0 | 0.0 |
2017 | 8654 | 0.0 | 0.0 | 0.0 |
2018 | 8442 | 0.0 | 0.0 | 0.0 |
2019 | 8611 | 0.0 | 0.0 | 0.0 |
2020 | 2105 | 0.0 | 0.0 | 0.0 |
For data sources see[5]