If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294260903000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.462506,"lon":-113.604372,"icon":""}]} |
Location: 00/03-09-029-26W4/0 | |
Location Alias: 00/03-09-29-26 W4M | |
Location Alias 2: 00/03-09-029-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 26 | |
Section: 09 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SWALWELL 3-9-29-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0425693 | |
License Date: 2010-11-09 | |
License Status: Issued | |
Spud Date: 2010-12-16 | |
Final Drill Date: 2011-01-02 | |
Well Total Depth: 1003.00 m | |
Surface Hole Latitude: 51.462506 | |
Surface Hole Longitude: -113.604372 |
Date | Event |
---|---|
2010-11-09 | Obtained License |
2010-12-16 | Surface Casing Operation Performed |
2011-01-02 | Finished Drilling |
2011-01-02 | Well Mode changed to Drilled and Cased |
2011-01-03 | Production Casing Operation Performed |
2011-01-03 | Rig Released |
2011-01-18 | Well Log Performed |
2011-02-20 | Perforation Treatment Performed - Jet Perforation |
2011-07-17 | Perforation Treatment Performed - Fractured |
2011-07-20 | Well Fluid changed to Gas |
2011-07-20 | Well Mode changed to Testing |
2011-09-09 | Perforation Treatment Performed - Jet Perforation |
2011-09-22 | Perforation Treatment Performed - Fractured |
2011-09-23 | Perforation Treatment Performed - Fractured |
2011-12-14 | Well Began Production |
2011-12-14 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-12-14 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-20 | Perforation | 232.00 | 234.00 | 13 |
2011-07-17 | Fracture | 498.00 | 500.00 | 0 |
2011-07-17 | Fracture | 887.00 | 889.00 | 0 |
2011-07-17 | Fracture | 980.00 | 982.00 | 0 |
2011-09-09 | Perforation | 182.00 | 184.00 | 13 |
2011-09-09 | Perforation | 188.00 | 190.00 | 13 |
2011-09-09 | Perforation | 197.00 | 199.00 | 13 |
2011-09-09 | Perforation | 256.60 | 257.10 | 13 |
2011-09-09 | Perforation | 262.20 | 262.70 | 13 |
2011-09-09 | Perforation | 267.00 | 268.00 | 13 |
2011-09-09 | Perforation | 268.50 | 269.00 | 13 |
2011-02-20 | Perforation | 250.00 | 252.00 | 13 |
2011-09-09 | Perforation | 270.00 | 271.00 | 13 |
2011-09-09 | Perforation | 342.00 | 345.00 | 13 |
2011-09-09 | Perforation | 380.00 | 380.50 | 13 |
2011-09-09 | Perforation | 385.00 | 386.00 | 13 |
2011-09-09 | Perforation | 394.20 | 394.70 | 13 |
2011-09-09 | Perforation | 402.00 | 405.00 | 13 |
2011-09-09 | Perforation | 445.30 | 445.80 | 13 |
2011-09-09 | Perforation | 494.50 | 495.00 | 13 |
2011-09-09 | Perforation | 514.10 | 514.60 | 13 |
2011-09-09 | Perforation | 516.00 | 518.00 | 13 |
2011-02-20 | Perforation | 273.00 | 275.00 | 13 |
2011-09-09 | Perforation | 519.10 | 519.60 | 13 |
2011-09-09 | Perforation | 540.00 | 542.00 | 13 |
2011-09-09 | Perforation | 558.00 | 561.00 | 13 |
2011-09-09 | Perforation | 577.70 | 578.20 | 13 |
2011-09-09 | Perforation | 583.00 | 583.50 | 13 |
2011-09-09 | Perforation | 584.20 | 585.20 | 13 |
2011-09-09 | Perforation | 593.00 | 595.00 | 13 |
2011-09-09 | Perforation | 608.20 | 610.20 | 13 |
2011-09-09 | Perforation | 611.30 | 611.80 | 13 |
2011-09-09 | Perforation | 621.00 | 623.00 | 13 |
2011-02-20 | Perforation | 498.00 | 500.00 | 13 |
2011-09-09 | Perforation | 626.80 | 627.80 | 13 |
2011-09-09 | Perforation | 619.20 | 619.70 | 13 |
2011-09-09 | Perforation | 633.00 | 634.00 | 13 |
2011-09-09 | Perforation | 639.00 | 640.00 | 13 |
2011-09-09 | Perforation | 642.80 | 644.30 | 13 |
2011-09-09 | Perforation | 650.60 | 652.10 | 13 |
2011-09-09 | Perforation | 657.90 | 658.90 | 13 |
2011-09-09 | Perforation | 660.10 | 661.60 | 13 |
2011-09-09 | Perforation | 661.90 | 663.90 | 13 |
2011-09-09 | Perforation | 674.20 | 675.20 | 13 |
2011-02-20 | Perforation | 887.00 | 889.00 | 13 |
2011-09-09 | Perforation | 847.00 | 849.00 | 13 |
2011-09-22 | Fracture | 650.60 | 849.00 | 0 |
2011-09-23 | Fracture | 256.60 | 644.30 | 0 |
2011-02-20 | Perforation | 980.00 | 982.00 | 13 |
2011-07-17 | Fracture | 232.00 | 234.00 | 0 |
2011-07-17 | Fracture | 250.00 | 252.00 | 0 |
2011-07-17 | Fracture | 273.00 | 275.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 436 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8739 | 0.0 | 0.0 | 0.0 |
2016 | 8752 | 0.0 | 0.0 | 0.0 |
2017 | 8683 | 0.0 | 0.0 | 0.0 |
2018 | 8725 | 0.0 | 0.0 | 0.0 |
2019 | 8698 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]