If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294261813000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.488361,"lon":-113.656948,"icon":""}]} |
Location: 00/13-18-029-26W4/0 | |
Location Alias: 00/13-18-29-26 W4M | |
Location Alias 2: 00/13-18-029-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 26 | |
Section: 18 | |
County/Municipality: Kneehill County | |
Well Name: EMBER ET AL ENTICE 13-18-29-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0440645 | |
License Date: 2011-12-08 | |
License Status: Issued | |
Spud Date: 2011-12-17 | |
Final Drill Date: 2011-12-18 | |
Well Total Depth: 859.00 m | |
Surface Hole Latitude: 51.488361 | |
Surface Hole Longitude: -113.656948 |
Date | Event |
---|---|
2011-12-08 | Obtained License |
2011-12-13 | Surface Casing Operation Performed |
2011-12-18 | Finished Drilling |
2011-12-18 | Production Casing Operation Performed |
2011-12-18 | Rig Released |
2011-12-18 | Well Mode changed to Drilled and Cased |
2012-01-07 | Perforation Treatment Performed - Jet Perforation |
2012-01-07 | Well Log Performed |
2012-02-07 | Perforation Treatment Performed - Fractured |
2012-02-16 | Well Began Production |
2012-02-16 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-16 | Well Mode changed to Flowing |
2013-02-06 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-07 | Perforation | 735.00 | 736.00 | 13 |
2012-01-07 | Perforation | 614.00 | 616.50 | 13 |
2012-01-07 | Perforation | 599.00 | 599.50 | 13 |
2012-01-07 | Perforation | 580.50 | 581.00 | 13 |
2012-01-07 | Perforation | 564.00 | 564.50 | 13 |
2012-01-07 | Perforation | 555.80 | 556.30 | 13 |
2012-01-07 | Perforation | 429.50 | 430.50 | 13 |
2012-01-07 | Perforation | 323.50 | 324.00 | 13 |
2012-01-07 | Perforation | 312.00 | 312.50 | 13 |
2012-01-07 | Perforation | 301.00 | 301.50 | 13 |
2012-02-07 | Fracture | 735.00 | 736.00 | 0 |
2012-01-07 | Perforation | 723.50 | 725.00 | 13 |
2012-02-07 | Fracture | 723.50 | 725.00 | 0 |
2012-02-07 | Fracture | 712.50 | 713.50 | 0 |
2012-02-07 | Fracture | 705.50 | 710.00 | 0 |
2012-02-07 | Fracture | 693.40 | 694.40 | 0 |
2012-02-07 | Fracture | 675.50 | 676.50 | 0 |
2012-02-07 | Fracture | 668.30 | 668.80 | 0 |
2012-02-07 | Fracture | 659.00 | 659.50 | 0 |
2012-02-07 | Fracture | 626.80 | 628.30 | 0 |
2012-02-07 | Fracture | 614.00 | 616.50 | 0 |
2012-02-07 | Fracture | 599.00 | 599.50 | 0 |
2012-01-07 | Perforation | 712.50 | 713.50 | 13 |
2012-02-07 | Fracture | 580.50 | 581.00 | 0 |
2012-02-07 | Fracture | 564.00 | 564.50 | 0 |
2012-02-07 | Fracture | 555.80 | 556.30 | 0 |
2012-02-07 | Fracture | 429.50 | 430.50 | 0 |
2012-02-07 | Fracture | 323.50 | 324.00 | 0 |
2012-02-07 | Fracture | 312.00 | 312.50 | 0 |
2012-02-07 | Fracture | 301.00 | 301.50 | 0 |
2013-02-06 | Fracture | 735.00 | 736.00 | 0 |
2013-02-06 | Fracture | 723.50 | 725.00 | 0 |
2013-02-06 | Fracture | 712.50 | 713.50 | 0 |
2012-01-07 | Perforation | 705.50 | 710.00 | 13 |
2013-02-06 | Fracture | 705.50 | 710.00 | 0 |
2013-02-06 | Fracture | 693.40 | 694.40 | 0 |
2013-02-06 | Fracture | 675.50 | 676.50 | 0 |
2013-02-06 | Fracture | 668.30 | 668.80 | 0 |
2013-02-06 | Fracture | 659.00 | 659.50 | 0 |
2013-02-06 | Fracture | 626.80 | 628.30 | 0 |
2013-02-06 | Fracture | 614.00 | 616.50 | 0 |
2013-02-06 | Fracture | 599.00 | 599.50 | 0 |
2013-02-06 | Fracture | 580.50 | 581.00 | 0 |
2013-02-06 | Fracture | 564.00 | 564.50 | 0 |
2012-01-07 | Perforation | 693.40 | 694.40 | 13 |
2013-02-06 | Fracture | 555.80 | 556.30 | 0 |
2013-02-06 | Fracture | 429.50 | 430.50 | 0 |
2013-02-06 | Fracture | 323.50 | 324.00 | 0 |
2013-02-06 | Fracture | 312.00 | 312.50 | 0 |
2013-02-06 | Fracture | 301.00 | 301.50 | 0 |
2012-01-07 | Perforation | 675.50 | 676.50 | 13 |
2012-01-07 | Perforation | 668.30 | 668.80 | 13 |
2012-01-07 | Perforation | 659.00 | 659.50 | 13 |
2012-01-07 | Perforation | 626.80 | 628.30 | 13 |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-02-06 | 2013-02-06 | N/A | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Nitrogen; liquid form | 7727-37-9 | 100 | 100 | N/A |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7640 | 0.0 | 0.0 | 0.0 |
2013 | 8706 | 0.0 | 0.0 | 0.0 |
2014 | 4703 | 0.0 | 0.0 | 0.0 |
2015 | 5215 | 0.0 | 0.0 | 0.0 |
2016 | 8653 | 0.0 | 0.0 | 0.0 |
2017 | 8689 | 0.0 | 0.0 | 0.0 |
2018 | 8747 | 0.0 | 0.0 | 0.0 |
2019 | 8693 | 0.0 | 0.0 | 0.0 |
2020 | 1832 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-02-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]