X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294282606003

Well Details

Well ID: 0294282606003
Loading map...
Location: 00/06-26-029-28W4/3
Location Alias: 00/06-26-29-28 W4M
Location Alias 2: 00/06-26-029-28 W4/03
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 28
Section: 26
County/Municipality: Mountain View County
Well Name: BAYTEX LPINECK 6-26-29-28
Operator Name: Baytex Energy Ltd.
License Number: 0042764
License Date: 1972-06-15
License Status: Amended
Spud Date: 1972-06-29
Final Drill Date: 1972-07-23
Well Total Depth: 2423.20 m
Surface Hole Latitude: 51.507797
Surface Hole Longitude: -113.841985

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-06-15 Obtained License
1972-07-23 Finished Drilling
1972-07-23 Well Mode changed to Drilled and Cased
1972-07-24 Production Casing Operation Performed
1972-09-06 Perforation Treatment Performed - Jet Perforation
1972-09-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-12-15 Perforation Treatment Performed - Jet Perforation
2002-12-15 Plug Back Performed
2002-12-15 Well Log Performed
2002-12-16 Well Log Performed
2002-12-17 Perforation Treatment Performed - Jet Perforation
2002-12-18 Perforation Treatment Performed - Fractured
2006-06-23 Well Began Production
2006-06-23 Well Fluid changed to Gas
2006-06-23 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-09-06 Perforation 2388.70 2389.60 7
2002-12-17 Perforation 2096.40 2098.20 17
2002-12-17 Perforation 2088.50 2092.80 17
2002-12-17 Perforation 2081.20 2086.70 17
2002-12-18 Fracture 2081.20 2098.20 0
1972-09-06 Perforation 2391.20 2392.70 7
1972-09-06 Perforation 2394.20 2395.10 7
1972-09-06 Perforation 2396.60 2397.90 7
1972-09-06 Perforation 2399.70 2400.30 7
1972-09-06 Perforation 2401.20 2404.30 7
1972-09-07 Acid Treatment 2388.70 2404.30 0
2002-12-15 Packing Device Capped w/Cement 2370.00 2378.00 0
2002-12-15 Perforation 2109.20 2114.10 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 4420 0.0 0.0 0.0
2007 7719 0.0 0.0 0.0
2008 8781 0.0 0.0 0.0
2009 8664 0.0 0.0 0.0
2010 8614 0.0 0.0 0.0
2011 8170 0.0 0.0 0.0
2012 7295 0.0 0.0 0.0
2013 7738 0.0 0.0 0.0
2014 8703 0.0 0.0 0.0
2015 8568 0.0 0.0 0.0
2016 7742 0.0 0.0 0.0
2017 8720 0.0 0.0 0.0
2018 8755 0.0 0.0 0.0
2019 7708 0.0 0.0 0.0
2020 1958 0.0 0.0 0.0

For data sources see[5]

References