If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304221110003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.555963,"lon":-112.990873,"icon":""}]} |
Location: 00/10-11-030-22W4/3 | |
Location Alias: 00/10-11-30-22 W4M | |
Location Alias 2: 00/10-11-030-22 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 22 | |
Section: 11 | |
County/Municipality: Kneehill County | |
Well Name: B.A. ET AL HUBER GPINE 10-11MU-30-22 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0029263 | |
License Date: 1965-10-28 | |
License Status: Issued | |
Spud Date: 1965-10-29 | |
Final Drill Date: 1965-11-07 | |
Well Total Depth: 1482.90 m | |
Surface Hole Latitude: 51.555963 | |
Surface Hole Longitude: -112.990873 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1965-10-28 | Obtained License |
1965-11-07 | Drill Stem Test Performed |
1965-11-07 | Finished Drilling |
1965-11-08 | Drill Stem Test Performed |
1965-11-09 | Drill Stem Test Performed |
1965-11-09 | Production Casing Operation Performed |
1965-11-23 | Perforation Treatment Performed - Jet Perforation |
1965-12-08 | Perforation Treatment Performed - Fractured |
1966-03-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1966-03-12 | Perforation Treatment Performed - Jet Perforation |
1968-03-22 | Perforation Treatment Performed - Jet Perforation |
1968-03-22 | Well Mode changed to Drilled and Cased |
1968-10-31 | Well Began Production |
1968-10-31 | Well Fluid changed to Gas |
1968-10-31 | Well Mode changed to Flowing |
1992-12-04 | Perforation Treatment Performed - Jet Perforation |
1993-01-30 | Perforation Treatment Performed - Fractured |
1995-03-01 | Well Fluid changed to Gas |
1995-03-01 | Well Mode changed to Suspended |
2005-12-22 | Perforation Treatment Performed - Jet Perforation |
2005-12-22 | Well Log Performed |
2006-01-04 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1965-11-23 | Perforation | 1453.30 | 1455.70 | 13 |
2006-01-04 | Fracture | 1221.00 | 1222.00 | 0 |
1965-12-08 | Fracture | 1453.30 | 1455.70 | 0 |
1966-03-08 | Packing Device Capped w/Cement | 1441.70 | 1441.70 | 0 |
1966-03-12 | Perforation | 1394.80 | 1396.00 | 13 |
1966-03-12 | Perforation | 1397.20 | 1398.70 | 13 |
1968-03-22 | Perforation | 1416.70 | 1419.10 | 7 |
1992-12-04 | Perforation | 1427.00 | 1430.10 | 13 |
1993-01-30 | Fracture | 1427.00 | 1430.10 | 0 |
2005-12-22 | Perforation | 1221.00 | 1222.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1968 | 0 | 0.0 | 0.0 | 0.0 |
1969 | 696 | 0.0 | 0.0 | 0.0 |
1970 | 6141 | 0.0 | 0.0 | 0.0 |
1971 | 7856 | 0.0 | 0.0 | 0.0 |
1972 | 1326 | 0.0 | 0.0 | 0.0 |
1985 | 53 | 0.0 | 0.0 | 0.0 |
1986 | 276 | 0.0 | 0.0 | 0.0 |
1987 | 35 | 0.0 | 0.0 | 0.0 |
1993 | 593 | 0.0 | 0.0 | 0.0 |
For data sources see[5]