X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304221406002

Well Details

Well ID: 0304221406002
Loading map...
Location: 00/06-14-030-22W4/2
Location Alias: 00/06-14-30-22 W4M
Location Alias 2: 00/06-14-030-22 W4/02
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 22
Section: 14
County/Municipality: Kneehill County
Well Name: B.A. ET AL HESKETH 6-14-30-22
Operator Name: Pine Cliff Energy Ltd.
License Number: 0029143
License Date: 1965-10-13
License Status: Issued
Spud Date: 1965-10-17
Final Drill Date: 1965-10-24
Well Total Depth: 1484.40 m
Surface Hole Latitude: 51.566730
Surface Hole Longitude: -112.996582

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-10-13 Obtained License
1965-10-24 Finished Drilling
1965-10-25 Drill Stem Test Performed
1965-10-26 Drill Stem Test Performed
1965-10-27 Drill Stem Test Performed
1965-10-28 Production Casing Operation Performed
1965-11-11 Perforation Treatment Performed - Jet Perforation
1965-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-11-13 Perforation Treatment Performed - Acid Wash - No Pressure
1965-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1965-11-18 Perforation Treatment Performed - Jet Perforation
1965-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-12-13 Perforation Treatment Performed - Acid Wash - No Pressure
1965-12-13 Perforation Treatment Performed - Nitrogen Treatment
1993-07-09 Perforation Treatment Performed - Jet Perforation
1993-07-10 Perforation Treatment Performed - Jet Perforation
1993-07-15 Perforation Treatment Performed - Fractured
1993-09-07 Well Mode changed to Drilled and Cased
2001-07-26 Well Began Production
2001-07-26 Well Fluid changed to Gas
2001-07-26 Well Mode changed to Flowing
2003-09-22 Well Fluid changed to Gas
2003-09-22 Well Mode changed to Suspended
2007-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-12-09 Plug Back Performed
2007-12-09 Well Fluid changed to Gas
2007-12-09 Well Mode changed to Abandoned Zone
2007-12-15 Perforation Treatment Performed - Jet Perforation
2007-12-18 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-11-11 Perforation 1438.00 1439.00 13
1993-07-09 Perforation 1438.00 1439.00 13
1993-07-09 Perforation 1440.80 1442.00 13
1993-07-10 Perforation 1438.00 1445.00 13
1993-07-15 Fracture 1438.00 1445.00 0
2007-12-09 Packing Device Capped w/Cement 1424.80 1432.80 0
2007-12-09 Packing Device Capped w/Cement 1395.70 1403.90 0
2007-12-15 Perforation 1220.00 1223.00 20
2007-12-18 Fracture 1220.00 1223.00 0
1965-11-11 Perforation 1440.80 1442.00 13
1965-11-13 Acid Wash 1438.00 1442.00 0
1965-11-13 Acid Treatment 1438.00 1442.00 0
1965-11-16 Packing Device Capped w/Cement 1420.70 1420.70 0
1965-11-18 Perforation 1409.70 1412.70 13
1965-12-13 Acid Wash 1409.70 1412.70 0
1965-12-13 Nitrogen Treatment 1409.70 1412.70 0
1965-12-13 Acid Treatment 1409.70 1412.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1479 0.0 0.0 0.0
2002 1464 0.0 0.0 0.0

For data sources see[5]

References