X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314130310003

Well Details

Well ID: 0314130310003
Loading map...
Location: 00/10-03-031-13W4/3
Location Alias: 00/10-03-31-13 W4M
Location Alias 2: 00/10-03-031-13 W4/03
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 13
Section: 03
County/Municipality: Special Areas No. 2
Well Name: RENAISSANCE RICHDALE 10-3-31-13
Operator Name: Baytex Energy Ltd.
License Number: 0158780
License Date: 1993-06-03
License Status: Abandoned
Spud Date: 1993-06-08
Final Drill Date: 1993-06-12
Well Total Depth: 1155.00 m
Surface Hole Latitude: 51.627841
Surface Hole Longitude: -111.764235

For data sources see[1][2]

Well History

Date Event
1993-06-03 Obtained License
1993-06-09 Surface Casing Operation Performed
1993-06-12 Finished Drilling
1993-06-12 Well Log Performed
1993-06-12 Well Mode changed to Drilled and Cased
1993-06-13 Drill Stem Test Performed
1993-06-14 Production Casing Operation Performed
1993-06-14 Rig Released
1993-06-16 Perforation Treatment Performed - Jet Perforation
1996-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-01-23 Plug Back Performed
1996-01-24 Perforation Treatment Performed - Jet Perforation
1997-10-01 Well Began Production
1997-10-01 Well Fluid changed to Gas
1997-10-01 Well Mode changed to Flowing
1997-10-10 Perforation Treatment Performed - Cement Squeeze
1997-10-10 Plug Back Performed
1997-10-10 Well Fluid changed to Gas
1997-10-10 Well Mode changed to Flowing
1997-10-15 Perforation Treatment Performed - Jet Perforation
1997-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-10-16 Perforation Treatment Performed - Jet Perforation
2004-10-16 Well Log Performed
2007-09-01 Well Fluid changed to Gas
2007-09-01 Well Mode changed to Flowing
2019-06-30 Well Fluid changed to Gas
2019-06-30 Well Mode changed to Suspended
2020-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-30 Plug Back Performed
2020-01-30 Well Fluid changed to Gas
2020-01-30 Well Mode changed to Abandoned Zone
2020-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-31 Plug Back Performed
2020-03-12 Well Abandoned
2020-03-12 Well Fluid changed to Gas
2020-03-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-06-16 Perforation 1123.00 1124.50 13
1996-01-23 Packing Device Capped w/Cement 1111.00 1119.00 0
1996-01-24 Perforation 970.50 971.50 13
1997-10-10 Cement Squeeze 970.50 971.50 0
1997-10-15 Perforation 1115.00 1116.50 13
1997-10-16 Acid Treatment 1115.00 1116.50 0
2004-10-16 Perforation 951.00 955.00 17
2020-01-30 Packing Device Capped w/Cement 1102.00 1110.00 0
2020-01-31 Packing Device Capped w/Cement 917.00 965.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 1700 0.0 0.0 0.0
1998 8240 0.0 0.0 0.0
1999 7785 0.0 0.0 0.0
2000 8035 0.0 0.0 0.0
2001 7900 0.0 0.0 0.0
2002 8557 0.0 0.0 0.0
2003 8661 0.0 0.0 0.0
2004 6502 0.0 0.0 0.0
2007 4391 0.0 0.0 0.0
2008 8780 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8687 0.0 0.0 0.0
2012 8366 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8687 0.0 0.0 0.0
2017 8662 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-29 No Incident Encountered 0.00 0.00

For data sources see[6]

References