X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314191606000

Well Details

Well ID: 0314191606000
Loading map...
Location: 00/06-16-031-19W4/0
Location Alias: 00/06-16-31-19 W4M
Location Alias 2: 00/06-16-031-19 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 19
Section: 16
County/Municipality: Starland County
Well Name: OMERS DELIA 6-16-31-19
Operator Name: Gain Energy Ltd.
License Number: 0123295
License Date: 1986-06-12
License Status: RecCertified
Spud Date: 1986-06-20
Final Drill Date: 1986-06-24
Well Total Depth: 1440.00 m
Surface Hole Latitude: 51.655800
Surface Hole Longitude: -112.641838

For data sources see[1][2]

Well History

Date Event
1986-06-12 Obtained License
1986-06-21 Surface Casing Operation Performed
1986-06-24 Drill Stem Test Performed
1986-06-24 Finished Drilling
1986-06-24 Well Log Performed
1986-06-24 Well Mode changed to Drilled and Cased
1986-06-25 Drill Stem Test Performed
1986-06-26 Production Casing Operation Performed
1986-06-26 Rig Released
1986-07-03 Perforation Treatment Performed - Jet Perforation
1986-07-03 Well Log Performed
1986-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-09-10 Perforation Treatment Performed - Jet Perforation
1986-09-10 Plug Back Performed
1986-09-10 Well Log Performed
1986-11-16 Perforation Treatment Performed - Fractured
1986-12-22 Well Began Production
1986-12-22 Well Fluid changed to Gas
1986-12-22 Well Mode changed to Flowing
1992-05-14 Well Log Performed
1992-05-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-05-15 Perforation Treatment Performed - Jet Perforation
1992-05-15 Perforation Treatment Performed - Remedial Casing
1992-05-15 Plug Back Performed
1992-05-15 Well Fluid changed to Gas
1992-05-15 Well Mode changed to Abandoned
1992-05-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-07-03 Perforation 1365.00 1368.00 7
1992-05-15 Perforation 299.50 300.50 13
1992-05-15 Remedial Casing Cementing 299.50 300.50 0
1986-07-05 Acid Treatment 1365.00 1368.00 0
1986-09-10 Packing Device Capped w/Cement 1342.00 1350.00 0
1986-09-10 Perforation 530.50 532.50 7
1986-09-10 Perforation 533.50 535.50 7
1986-09-10 Perforation 520.70 521.50 7
1986-09-10 Perforation 523.00 523.50 7
1986-11-16 Fracture 520.70 535.50 0
1992-05-15 Packing Device Capped w/Cement 507.00 515.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 215 0.0 0.0 0.0
1987 8652 0.0 0.0 0.0
1988 8186 0.0 0.0 0.0
1989 5553 0.0 0.0 0.0

For data sources see[5]

References