X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324011302000

Well Details

Well ID: 0324011302000
Loading map...
Location: 00/02-13-032-01W4/0
Location Alias: 00/02-13-32-01 W4M
Location Alias 2: 00/02-13-032-01 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 01
Section: 13
County/Municipality: Special Areas No. 4
Well Name: ANEGADA HZ 2A ESTHER 2-13-32-1
Operator Name: Baytex Energy Ltd.
License Number: 0467882
License Date: 2014-07-07
License Status: Issued
Spud Date: 2014-09-04
Final Drill Date: 2014-09-06
Well Total Depth: 2265.00 m
Surface Hole Latitude: 51.751839
Surface Hole Longitude: -110.012083

For data sources see[1][2]

Well History

Date Event
2014-07-07 Obtained License
2014-09-04 Surface Casing Operation Performed
2014-09-05 Direction Drilling Operation Performed - Deviate
2014-09-05 Direction Drilling Operation Performed - Horizontal
2014-09-06 Finished Drilling
2014-09-06 Well Log Performed
2014-09-06 Well Mode changed to Drilled and Cased
2014-09-07 Production Casing Operation Performed
2014-09-07 Rig Released
2014-09-16 Well Log Performed
2014-10-06 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-11 Well Began Production
2014-10-11 Well Fluid changed to Crude Oil
2014-10-11 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-09-04 Precision Drilling Corporation 145 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-09-05 535.10 Deviate (5 - 79 degrees)
2014-09-05 809.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-10-06 Multi-Stage Fracture 2245.00 2245.50 0
2014-10-07 Multi-Stage Fracture 1975.00 1975.50 0
2014-10-07 Multi-Stage Fracture 1945.00 1945.50 0
2014-10-07 Multi-Stage Fracture 1915.00 1915.50 0
2014-10-07 Multi-Stage Fracture 1885.00 1885.50 0
2014-10-07 Multi-Stage Fracture 1855.00 1855.50 0
2014-10-07 Multi-Stage Fracture 1825.00 1825.50 0
2014-10-07 Multi-Stage Fracture 1795.00 1795.50 0
2014-10-07 Multi-Stage Fracture 1765.00 1765.50 0
2014-10-07 Multi-Stage Fracture 1735.00 1735.50 0
2014-10-07 Multi-Stage Fracture 1705.00 1705.50 0
2014-10-07 Multi-Stage Fracture 2215.00 2215.50 0
2014-10-07 Multi-Stage Fracture 1675.00 1675.50 0
2014-10-07 Multi-Stage Fracture 1645.00 1645.50 0
2014-10-07 Multi-Stage Fracture 1615.00 1615.50 0
2014-10-07 Multi-Stage Fracture 1585.00 1585.50 0
2014-10-07 Multi-Stage Fracture 1555.00 1555.50 0
2014-10-07 Multi-Stage Fracture 1525.00 1525.50 0
2014-10-07 Multi-Stage Fracture 1495.00 1495.50 0
2014-10-07 Multi-Stage Fracture 1120.00 1120.50 0
2014-10-07 Multi-Stage Fracture 1090.00 1090.50 0
2014-10-07 Multi-Stage Fracture 1060.00 1060.50 0
2014-10-07 Multi-Stage Fracture 2185.00 2185.50 0
2014-10-07 Multi-Stage Fracture 1030.00 1030.50 0
2014-10-07 Multi-Stage Fracture 1000.00 1000.50 0
2014-10-07 Multi-Stage Fracture 970.00 970.50 0
2014-10-07 Multi-Stage Fracture 940.00 940.50 0
2014-10-07 Multi-Stage Fracture 910.00 910.50 0
2014-10-07 Multi-Stage Fracture 880.00 880.50 0
2014-10-07 Multi-Stage Fracture 2155.00 2155.50 0
2014-10-07 Multi-Stage Fracture 2125.00 2125.50 0
2014-10-07 Multi-Stage Fracture 2095.00 2095.50 0
2014-10-07 Multi-Stage Fracture 2065.00 2065.50 0
2014-10-07 Multi-Stage Fracture 2035.00 2035.50 0
2014-10-07 Multi-Stage Fracture 2005.00 2005.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-10-06 2014-10-07 738 1,320 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 74.9016 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 13.129 N/A
IH-BEZ-4 Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0244 N/A
IH-CS-1 Fusion Technologies Inc. Clay Control Non-Whimis Regulated 64-18-6 100 0.2364 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.122 N/A
Ethylene glycol 107-21-1 100 0.122 N/A
Potassium Carbonate 584-08-7 100 0.122 N/A
Potassium Hydroxide 1310-58-3 100 0.122 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.2695 N/A
IH-NE-1 Fusion Technologies Inc. Surfactant 1.2.4-trimethylbenzene 95-63-6 100 0.0632 N/A
2-ethyhexanol 104-76-7 100 0.0632 N/A
EO-C7-9-iso. C8-rich alcohols 78330-19-5 100 0.0632 N/A
EO-C9-11-iso. C10-rich alcohols 78330-20-8 100 0.0632 N/A
Heavy aromatic naptha 64742-94-5 100 0.0632 N/A
Isopropanol 67-63-0 100 0.0632 N/A
Methanol 67-56-1 100 0.0632 N/A
Napthalene 91-20-3 100 0.0632 N/A
Polyethylene glycol 25322-68-3 100 0.0632 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-10-05 2014-10-08 Municipal Water 480

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 1659 0.0 0.0 0.0
2015 8064 0.0 0.0 0.0
2016 7734 0.0 0.0 0.0
2017 8027 0.0 0.0 0.0
2018 8699 0.0 0.0 0.0
2019 8754 0.0 0.0 0.0
2020 2095 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-09-07 No Incident Encountered 0.00 0.00
2014-10-11 No Incident Encountered 0.00 0.00

For data sources see[10]

References