X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324022902000

Well Details

Well ID: 0324022902000
Loading map...
Location: 00/02-29-032-02W4/0
Location Alias: 00/02-29-32-02 W4M
Location Alias 2: 00/02-29-032-02 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 02
Section: 29
County/Municipality: Special Areas No. 4
Well Name: ANEGADA HZ ESTHER 2-29-32-2
Operator Name: Baytex Energy Ltd.
License Number: 0461571
License Date: 2013-11-28
License Status: Issued
Spud Date: 2014-03-07
Final Drill Date: 2014-03-10
Well Total Depth: 2315.00 m
Surface Hole Latitude: 51.782219
Surface Hole Longitude: -110.252042

For data sources see[1][2]

Well History

Date Event
2013-11-28 Obtained License
2014-03-07 Surface Casing Operation Performed
2014-03-08 Direction Drilling Operation Performed - Deviate
2014-03-09 Direction Drilling Operation Performed - Horizontal
2014-03-10 Finished Drilling
2014-03-10 Production Casing Operation Performed
2014-03-10 Well Log Performed
2014-03-10 Well Mode changed to Drilled and Cased
2014-03-11 Rig Released
2014-05-29 Well Log Performed
2014-05-30 Well Log Performed
2014-06-05 Perforation Treatment Performed - Multi-Stage Fracture
2014-06-12 Well Began Production
2014-06-12 Well Fluid changed to Crude Oil
2014-06-12 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-03-07 Precision Well Servicing 145 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-03-08 355.49 Deviate (5 - 79 degrees)
2014-03-09 876.98 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-06-05 Multi-Stage Fracture 2302.00 2302.50 0
2014-06-05 Multi-Stage Fracture 1980.00 1980.50 0
2014-06-05 Multi-Stage Fracture 1945.00 1945.50 0
2014-06-05 Multi-Stage Fracture 1910.00 1910.50 0
2014-06-05 Multi-Stage Fracture 1875.00 1875.50 0
2014-06-05 Multi-Stage Fracture 1840.50 1841.00 0
2014-06-05 Multi-Stage Fracture 1810.00 1810.50 0
2014-06-05 Multi-Stage Fracture 1735.00 1735.50 0
2014-06-05 Multi-Stage Fracture 1700.00 1700.50 0
2014-06-05 Multi-Stage Fracture 1665.00 1665.50 0
2014-06-05 Multi-Stage Fracture 1630.00 1630.50 0
2014-06-05 Multi-Stage Fracture 2269.50 2270.00 0
2014-06-05 Multi-Stage Fracture 1595.00 1595.50 0
2014-06-05 Multi-Stage Fracture 1560.00 1560.50 0
2014-06-05 Multi-Stage Fracture 1525.00 1525.50 0
2014-06-05 Multi-Stage Fracture 1490.00 1490.50 0
2014-06-05 Multi-Stage Fracture 1420.00 1420.50 0
2014-06-05 Multi-Stage Fracture 1385.00 1385.50 0
2014-06-05 Multi-Stage Fracture 1350.00 1350.50 0
2014-06-05 Multi-Stage Fracture 1315.00 1315.50 0
2014-06-05 Multi-Stage Fracture 1280.00 1280.50 0
2014-06-05 Multi-Stage Fracture 1245.00 1245.50 0
2014-06-05 Multi-Stage Fracture 2240.00 2240.50 0
2014-06-05 Multi-Stage Fracture 1210.00 1210.50 0
2014-06-05 Multi-Stage Fracture 1174.50 1175.00 0
2014-06-05 Multi-Stage Fracture 1140.00 1140.50 0
2014-06-05 Multi-Stage Fracture 1105.00 1105.50 0
2014-06-05 Multi-Stage Fracture 1070.00 1070.50 0
2014-06-05 Multi-Stage Fracture 1035.00 1035.50 0
2014-06-05 Multi-Stage Fracture 999.50 1000.00 0
2014-06-05 Multi-Stage Fracture 965.00 965.50 0
2014-06-05 Multi-Stage Fracture 920.00 920.50 0
2014-06-05 Multi-Stage Fracture 2210.00 2210.50 0
2014-06-05 Multi-Stage Fracture 2150.50 2151.00 0
2014-06-05 Multi-Stage Fracture 2120.00 2120.50 0
2014-06-05 Multi-Stage Fracture 2085.00 2085.50 0
2014-06-05 Multi-Stage Fracture 2050.00 2050.50 0
2014-06-05 Multi-Stage Fracture 2015.50 2016.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-06-05 2014-06-05 700 1,382 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 71.3834 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 14.3605 N/A
IH-BEZ-3 Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0136 N/A
Buff 75 Fusion Technologies Inc. Buffer Formic Acid 992-98-3 100 0.012 N/A
IH-CS-1 Fusion Technologies Inc. Clay Control Non-Whimis Regulated 64-18-6 100 0.1308 N/A
IH-CBX-1 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1403 N/A
Ethylene glycol 107-21-1 100 0.1405 N/A
Potassium Carbonate 584-08-7 100 0.1405 N/A
Potassium Hydroxide 1310-58-3 100 0.1403 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.2997 N/A
IH-NE-1 Fusion Technologies Inc. Surfactant 1.2.4-trimethylbenzene 95-63-6 100 0.0546 N/A
2-ethyhexanol 104-76-7 100 0.0546 N/A
EO-C7-9-iso. C8-rich alcohols 78330-19-5 100 0.0546 N/A
EO-C9-11-iso. C10-rich alcohols 78330-20-8 100 0.0546 N/A
Heavy aromatic naptha 64742-94-5 100 0.0546 N/A
Isopropanol 67-63-0 100 0.0546 N/A
Methanol 67-56-1 100 0.0546 N/A
Napthalene 91-20-3 100 0.0546 N/A
Polyethylene glycol 25322-68-3 100 0.0546 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-05-30 2014-07-08 Municipal Water 1271

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 4825 0.0 0.0 0.0
2015 8440 0.0 0.0 0.0
2016 6556 0.0 0.0 0.0
2017 8630 0.0 0.0 0.0
2018 7802 0.0 0.0 0.0
2019 8581 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-11 No Incident Encountered 0.00 0.00
2014-06-14 No Incident Encountered 0.00 0.00

For data sources see[10]

References