If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0324053601000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.796357,"lon":-110.574412,"icon":""}]} |
Location: 00/01-36-032-05W4/0 | |
Location Alias: 00/01-36-32-05 W4M | |
Location Alias 2: 00/01-36-032-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 4 | |
Range: 05 | |
Section: 36 | |
County/Municipality: Special Areas No. 4 | |
Well Name: ANEGADA HZ 1B PROVOST 1-36-32-5 | |
Operator Name: Baytex Energy Ltd. | |
License Number: 0476168 | |
License Date: 2015-07-17 | |
License Status: Abandoned | |
Spud Date: 2015-07-30 | |
Final Drill Date: 2015-08-03 | |
Well Total Depth: 2405.00 m | |
Surface Hole Latitude: 51.796357 | |
Surface Hole Longitude: -110.574412 |
Date | Event |
---|---|
2015-07-17 | Obtained License |
2015-07-30 | Surface Casing Operation Performed |
2015-07-31 | Direction Drilling Operation Performed - Deviate |
2015-07-31 | Direction Drilling Operation Performed - Horizontal |
2015-08-03 | Finished Drilling |
2015-08-03 | Well Log Performed |
2015-08-03 | Well Mode changed to Drilled and Cased |
2015-08-04 | Production Casing Operation Performed |
2015-08-04 | Rig Released |
2015-08-12 | Well Log Performed |
2015-08-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-08-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-09-01 | Well Began Production |
2015-09-01 | Well Fluid changed to Gas |
2015-09-01 | Well Mode changed to Flowing |
2017-10-01 | Well Fluid changed to Gas |
2017-10-01 | Well Mode changed to Suspended |
2018-12-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-12-18 | Plug Back Performed |
2018-12-18 | Well Fluid changed to Gas |
2018-12-18 | Well Mode changed to Abandoned Zone |
2018-12-29 | Well Abandoned |
2018-12-29 | Well Fluid changed to Gas |
2018-12-29 | Well Mode changed to Abandoned |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-07-30 | Precision Drilling Corporation | 145 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-07-31 | 486.00 | Deviate (5 - 79 degrees) |
2015-07-31 | 894.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-08-26 | Multi-Stage Fracture | 2386.00 | 2386.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 2140.00 | 2140.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 2112.00 | 2112.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 2084.00 | 2084.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 2016.00 | 2016.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 1989.00 | 1989.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 1962.00 | 1962.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 1926.00 | 1926.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 1899.00 | 1899.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 1870.00 | 1870.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 1841.00 | 1841.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 2359.00 | 2359.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 1814.00 | 1814.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 1787.00 | 1787.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 1751.00 | 1751.50 | 0 |
2015-08-27 | Multi-Stage Fracture | 1724.00 | 1724.50 | 0 |
2015-08-27 | Multi-Stage Fracture | 1694.00 | 1694.50 | 0 |
2015-08-27 | Multi-Stage Fracture | 1667.00 | 1667.50 | 0 |
2015-08-27 | Multi-Stage Fracture | 1638.00 | 1638.50 | 0 |
2015-08-27 | Multi-Stage Fracture | 1573.00 | 1573.50 | 0 |
2015-08-27 | Multi-Stage Fracture | 1286.00 | 1286.50 | 0 |
2015-08-27 | Multi-Stage Fracture | 1259.00 | 1259.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 2332.00 | 2332.50 | 0 |
2015-08-27 | Multi-Stage Fracture | 1233.00 | 1233.50 | 0 |
2015-08-27 | Multi-Stage Fracture | 1207.00 | 1207.50 | 0 |
2015-08-27 | Multi-Stage Fracture | 1181.00 | 1181.50 | 0 |
2015-08-27 | Multi-Stage Fracture | 1155.00 | 1155.50 | 0 |
2015-08-27 | Multi-Stage Fracture | 1128.00 | 1128.50 | 0 |
2015-08-27 | Multi-Stage Fracture | 1015.00 | 1015.50 | 0 |
2018-12-18 | Packing Device Capped w/Cement | 882.00 | 890.00 | 0 |
2015-08-26 | Multi-Stage Fracture | 2303.00 | 2303.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 2276.00 | 2276.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 2249.00 | 2249.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 2222.00 | 2222.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 2195.00 | 2195.50 | 0 |
2015-08-26 | Multi-Stage Fracture | 2168.00 | 2168.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-08-26 | 2015-08-27 | 791 | 1,705 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 76.4155 | N/A | |||
Frac Sand - Regular | Iron Horse Energy Services | Crystalline Silica | 14808-60-7 | 100 | 11.594 | N/A | ||
IH-CS-1 | Fusion Technologies Inc. | Clay Control | Non-Whimis Regulated | 64-18-6 | 100 | 0.2288 | N/A | |
IH-FR-1C | Fusion Technologies Inc. | Friction Reducer | Non-Whimis Regulated | Not Available | 100 | 0.1091 | N/A | |
IH-NE-1 | Fusion Technologies Inc. | Surfactant | 2-ethyhexanol | 104-76-7 | 100 | 0.0584 | N/A | |
EO-C7-9-iso. C8-rich alcohols | 78330-19-5 | 100 | 0.0584 | N/A | ||||
EO-C9-11-iso. C10-rich alcohols | 78330-20-8 | 100 | 0.0584 | N/A | ||||
Heavy aromatic naptha | 64742-94-5 | 100 | 0.0584 | N/A | ||||
Isopropanol | 67-63-0 | 100 | 0.0584 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0584 | N/A | ||||
Napthalene | 91-20-3 | 100 | 0.0584 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0584 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-08-25 | 2015-08-27 | Municipal Water | 1715 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 1056 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-08-04 | No Incident Encountered | 0.00 | 0.00 |
2015-08-31 | No Incident Encountered | 0.00 | 0.00 |
2018-12-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]