X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324201504002

Well Details

Well ID: 0324201504002
Loading map...
Location: 00/04-15-032-20W4/2
Location Alias: 00/04-15-32-20 W4M
Location Alias 2: 00/04-15-032-20 W4/02
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 20
Section: 15
County/Municipality: Starland County
Well Name: RENAISSANCE ROWLEY 4-15-32-20
Operator Name: Husky Oil Operations Limited
License Number: 0020881
License Date: 1961-06-07
License Status: RecCertified
Spud Date: 1961-06-15
Final Drill Date: 1961-06-20
Well Total Depth: 1389.30 m
Surface Hole Latitude: 51.737915
Surface Hole Longitude: -112.765738

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-06-07 Obtained License
1961-06-20 Finished Drilling
1961-06-20 Well Mode changed to Drilled and Cased
1961-06-21 Drill Stem Test Performed
1961-06-22 Production Casing Operation Performed
1961-06-24 Drill Stem Test Performed
1961-06-24 Perforation Treatment Performed - Jet Perforation
1961-06-25 Perforation Treatment Performed - Cement Squeeze
1961-06-26 Perforation Treatment Performed - Jet Perforation
1961-07-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-07-02 Perforation Treatment Performed - Fractured
1961-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-07-19 Perforation Treatment Performed - Jet Perforation
1981-04-29 Well Began Production
1981-04-29 Well Fluid changed to Gas
1981-04-29 Well Mode changed to Flowing
1992-02-01 Well Fluid changed to Gas
1992-02-01 Well Mode changed to Suspended
1993-06-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-09 Perforation Treatment Performed - Jet Perforation
1993-06-09 Plug Back Performed
1993-06-09 Well Abandoned
1993-06-09 Well Fluid changed to Gas
1993-06-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-06-24 Perforation 1347.20 1347.80 7
1993-06-09 Perforation 245.00 246.00 13
1993-06-09 Packing Device Capped w/Cement 234.00 250.00 0
1961-06-25 Cement Squeeze 1347.20 1347.80 0
1961-06-26 Perforation 1365.50 1368.60 7
1961-07-02 Acid Treatment 1365.50 1368.60 0
1961-07-02 Fracture 1365.50 1368.60 0
1961-07-08 Acid Treatment 1365.50 1368.60 0
1978-07-19 Perforation 555.30 558.30 7
1993-06-09 Packing Device Capped w/Cement 1353.00 1361.00 0
1993-06-09 Packing Device Capped w/Cement 542.00 550.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 3346 0.0 0.0 0.0
1982 5335 0.0 0.0 0.0
1983 4389 0.0 0.0 0.0
1984 8553 0.0 0.0 0.0
1985 5604 0.0 0.0 0.0
1986 3964 0.0 0.0 0.0
1987 4072 0.0 0.0 0.0
1988 4574 0.0 0.0 0.0
1989 3593 0.0 0.0 0.0
1990 6703 0.0 0.0 0.0
1991 4218 0.0 0.0 0.0

For data sources see[5]

References