X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334010507020

Well Details

Well ID: 0334010507020
Loading map...
Location: 02/07-05-033-01W4/0
Location Alias: 02/07-05-33-01 W4M
Location Alias 2: 02/07-05-033-01 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 01
Section: 05
County/Municipality: Special Areas No. 4
Well Name: ANEGADA HZ 7A ESTHER 7-5-33-1
Operator Name: Baytex Energy Ltd.
License Number: 0475355
License Date: 2015-05-01
License Status: Issued
Spud Date: 2015-09-27
Final Drill Date: 2015-09-29
Well Total Depth: 2034.00 m
Surface Hole Latitude: 51.786387
Surface Hole Longitude: -110.106673

For data sources see[1][2]

Well History

Date Event
2015-05-01 Obtained License
2015-09-28 Direction Drilling Operation Performed - Deviate
2015-09-28 Surface Casing Operation Performed
2015-09-29 Direction Drilling Operation Performed - Horizontal
2015-09-29 Finished Drilling
2015-09-29 Well Log Performed
2015-09-29 Well Mode changed to Drilled and Cased
2015-09-30 Production Casing Operation Performed
2015-09-30 Rig Released
2015-10-03 Well Log Performed
2015-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-08 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-09 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-12 Well Began Production
2015-10-12 Well Fluid changed to Crude Oil
2015-10-12 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-09-27 Precision Drilling Corporation 145 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-09-28 547.30 Deviate (5 - 79 degrees)
2015-09-29 808.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-10-07 Multi-Stage Fracture 2015.00 2015.50 0
2015-10-07 Multi-Stage Fracture 1575.00 1575.50 0
2015-10-07 Multi-Stage Fracture 1526.00 1526.50 0
2015-10-07 Multi-Stage Fracture 1473.00 1473.50 0
2015-10-07 Multi-Stage Fracture 1427.00 1427.50 0
2015-10-08 Multi-Stage Fracture 1400.00 1400.50 0
2015-10-08 Multi-Stage Fracture 1370.00 1370.50 0
2015-10-08 Multi-Stage Fracture 1337.00 1337.50 0
2015-10-08 Multi-Stage Fracture 1310.00 1310.50 0
2015-10-08 Multi-Stage Fracture 1284.00 1284.50 0
2015-10-08 Multi-Stage Fracture 1250.00 1250.50 0
2015-10-07 Multi-Stage Fracture 1872.00 1872.50 0
2015-10-08 Multi-Stage Fracture 1222.00 1222.50 0
2015-10-08 Multi-Stage Fracture 1188.00 1188.50 0
2015-10-08 Multi-Stage Fracture 1160.00 1160.50 0
2015-10-08 Multi-Stage Fracture 1134.00 1134.50 0
2015-10-08 Multi-Stage Fracture 1100.00 1100.50 0
2015-10-08 Multi-Stage Fracture 1072.00 1072.50 0
2015-10-09 Multi-Stage Fracture 1038.00 1038.50 0
2015-10-09 Multi-Stage Fracture 1010.00 1010.50 0
2015-10-09 Multi-Stage Fracture 984.00 984.50 0
2015-10-09 Multi-Stage Fracture 950.00 950.50 0
2015-10-07 Multi-Stage Fracture 1838.00 1838.50 0
2015-10-09 Multi-Stage Fracture 923.00 923.50 0
2015-10-09 Multi-Stage Fracture 888.00 888.50 0
2015-10-07 Multi-Stage Fracture 1812.00 1812.50 0
2015-10-07 Multi-Stage Fracture 1778.00 1778.50 0
2015-10-07 Multi-Stage Fracture 1752.00 1752.50 0
2015-10-07 Multi-Stage Fracture 1724.00 1724.50 0
2015-10-07 Multi-Stage Fracture 1636.00 1636.50 0
2015-10-07 Multi-Stage Fracture 1601.00 1601.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-10-07 2015-10-09 731 1,099 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 88.817 N/A
20/40 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 10.9417 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.299 N/A
Water 7732-18-5 100 0.299 N/A
ELE-Glide Lubricant Element Friction Reducer Dinonylphenyl polyoxyethylene 9014-93-1 100 0.0121 N/A
Ethylene Glycol Monobutyl Ether 111-76-2 100 0.0121 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0121 N/A
Poly(oxy-1.2-ethanediyl).alpha-(4-nonylphenyl)-omega-hydroxy-.branche
d
127087-87-0 100 0.0121 N/A
Polyethylene glycol 25322-68-3 100 0.0121 N/A
ELEFR-3A Element Friction Reducer Non-hazardous Ingredients Not Available 100 0.1616 N/A
Tergitol 15-S-20 68131-40-8 100 0.1616 N/A
ELEFE-1 Element Surfactant Alcohols. C9-11. ethoxylated 68439-46-3 100 0.1212 N/A
Methanol 67-56-1 100 0.1212 N/A
Poly(oxy-1.2-ethanediyl). alpha-undecyl-omega-hydroxy- 34398-01-1 100 0.1212 N/A
Water 7732-18-5 100 0.1212 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-10-04 2015-10-05 Municipal Water 1097

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1819 0.0 0.0 0.0
2016 8000 0.0 0.0 0.0
2017 8285 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8735 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-09-30 No Incident Encountered 0.00 0.00
2015-10-12 No Incident Encountered 0.00 0.00

For data sources see[10]

References