X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334010607000

Well Details

Well ID: 0334010607000
Loading map...
Location: 00/07-06-033-01W4/0
Location Alias: 00/07-06-33-01 W4M
Location Alias 2: 00/07-06-033-01 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 01
Section: 06
County/Municipality: Special Areas No. 4
Well Name: ANEGADA HZ 7D ESTHER 7-6-33-1
Operator Name: Baytex Energy Ltd.
License Number: 0470165
License Date: 2014-09-24
License Status: Issued
Spud Date: 2015-06-25
Final Drill Date: 2015-06-27
Well Total Depth: 2260.00 m
Surface Hole Latitude: 51.785230
Surface Hole Longitude: -110.133547

For data sources see[1][2]

Well History

Date Event
2014-09-24 Obtained License
2015-06-25 Surface Casing Operation Performed
2015-06-26 Direction Drilling Operation Performed - Deviate
2015-06-26 Direction Drilling Operation Performed - Horizontal
2015-06-27 Finished Drilling
2015-06-27 Well Log Performed
2015-06-27 Well Mode changed to Drilled and Cased
2015-06-28 Production Casing Operation Performed
2015-06-28 Rig Released
2015-07-03 Well Log Performed
2015-08-01 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-02 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-04 Well Began Production
2015-08-04 Well Fluid changed to Crude Oil
2015-08-04 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-06-25 Precision Drilling Corporation 145 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-06-26 428.90 Deviate (5 - 79 degrees)
2015-06-26 855.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-08-01 Multi-Stage Fracture 2249.00 2249.50 0
2015-08-01 Multi-Stage Fracture 1719.00 1719.50 0
2015-08-01 Multi-Stage Fracture 1679.00 1679.50 0
2015-08-01 Multi-Stage Fracture 1650.00 1650.50 0
2015-08-01 Multi-Stage Fracture 1621.00 1621.50 0
2015-08-01 Multi-Stage Fracture 1586.00 1586.50 0
2015-08-01 Multi-Stage Fracture 1525.00 1525.50 0
2015-08-01 Multi-Stage Fracture 1498.00 1498.50 0
2015-08-01 Multi-Stage Fracture 1463.00 1463.50 0
2015-08-01 Multi-Stage Fracture 1435.00 1435.50 0
2015-08-01 Multi-Stage Fracture 1410.00 1410.50 0
2015-08-01 Multi-Stage Fracture 2223.00 2223.50 0
2015-08-01 Multi-Stage Fracture 1380.00 1380.50 0
2015-08-01 Multi-Stage Fracture 1352.00 1352.50 0
2015-08-01 Multi-Stage Fracture 1317.00 1317.50 0
2015-08-01 Multi-Stage Fracture 1285.00 1285.50 0
2015-08-01 Multi-Stage Fracture 1258.00 1258.50 0
2015-08-02 Multi-Stage Fracture 1223.00 1223.50 0
2015-08-02 Multi-Stage Fracture 1195.00 1195.50 0
2015-08-02 Multi-Stage Fracture 1165.00 1165.50 0
2015-08-02 Multi-Stage Fracture 1140.00 1140.50 0
2015-08-02 Multi-Stage Fracture 1112.00 1112.50 0
2015-08-01 Multi-Stage Fracture 2183.00 2183.50 0
2015-08-02 Multi-Stage Fracture 1077.00 1077.50 0
2015-08-02 Multi-Stage Fracture 1058.00 1058.50 0
2015-08-02 Multi-Stage Fracture 1032.00 1032.50 0
2015-08-02 Multi-Stage Fracture 997.00 997.50 0
2015-08-02 Multi-Stage Fracture 956.00 956.50 0
2015-08-02 Multi-Stage Fracture 925.00 925.50 0
2015-08-01 Multi-Stage Fracture 2090.00 2090.50 0
2015-08-01 Multi-Stage Fracture 2047.00 2047.50 0
2015-08-01 Multi-Stage Fracture 1967.00 1967.50 0
2015-08-01 Multi-Stage Fracture 1810.00 1810.50 0
2015-08-01 Multi-Stage Fracture 1781.00 1781.50 0
2015-08-01 Multi-Stage Fracture 1754.00 1754.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-01 2015-08-02 720 1,399 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 78.7772 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 21.4022 N/A
IH-CS-1 Fusion Technologies Inc. Clay Control Non-Whimis Regulated 64-18-6 100 0.2482 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.1184 N/A
IH-NE-1 Fusion Technologies Inc. Surfactant 2-ethyhexanol 104-76-7 100 0.0651 N/A
EO-C7-9-iso. C8-rich alcohols 78330-19-5 100 0.0651 N/A
EO-C9-11-iso. C10-rich alcohols 78330-20-8 100 0.0651 N/A
Heavy aromatic naptha 64742-94-5 100 0.0651 N/A
Isopropanol 67-63-0 100 0.0651 N/A
Methanol 67-56-1 100 0.0651 N/A
Napthalene 91-20-3 100 0.0651 N/A
Polyethylene glycol 25322-68-3 100 0.0651 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-07-03 2015-08-01 Municipal Water 1287

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 3348 0.0 0.0 0.0
2016 8562 0.0 0.0 0.0
2017 8350 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8735 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-06-28 No Incident Encountered 0.00 0.00
2015-08-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References