X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334010614020

Well Details

Well ID: 0334010614020
Loading map...
Location: 02/14-06-033-01W4/0
Location Alias: 02/14-06-33-01 W4M
Location Alias 2: 02/14-06-033-01 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 01
Section: 06
County/Municipality: Special Areas No. 4
Well Name: RRX HZ 14C ESTHER 14-6-33-1
Operator Name: Baytex Energy Ltd.
License Number: 0479637
License Date: 2016-06-09
License Status: Issued
Spud Date: 2016-12-13
Final Drill Date: 2016-12-19
Well Total Depth: 2284.00 m
Surface Hole Latitude: 51.793074
Surface Hole Longitude: -110.137994

For data sources see[1][2]

Well History

Date Event
2016-06-09 Obtained License
2016-12-13 Surface Casing Operation Performed
2016-12-18 Direction Drilling Operation Performed - Deviate
2016-12-18 Direction Drilling Operation Performed - Horizontal
2016-12-19 Finished Drilling
2016-12-19 Well Log Performed
2016-12-19 Well Mode changed to Drilled and Cased
2016-12-20 Production Casing Operation Performed
2016-12-20 Rig Released
2016-12-20 Well Log Performed
2017-01-10 Well Log Performed
2017-01-15 Perforation Treatment Performed - Jet Perforation
2017-01-15 Well Log Performed
2017-01-20 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-21 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-21 Well Began Production
2017-01-21 Well Fluid changed to Crude Oil
2017-01-21 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-12-13 Predator Drilling Inc. 7 N/A Set Surface
2016-12-18 Tempco Drilling Company Inc. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-12-18 425.50 Deviate (5 - 79 degrees)
2016-12-18 851.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-15 Perforation 2240.00 2240.50 20
2017-01-15 Perforation 1915.00 1915.50 20
2017-01-15 Perforation 1875.00 1875.50 20
2017-01-15 Perforation 1834.00 1834.50 20
2017-01-15 Perforation 1795.00 1795.50 20
2017-01-15 Perforation 1755.00 1755.50 20
2017-01-15 Perforation 1715.00 1715.50 20
2017-01-15 Perforation 1676.00 1676.50 20
2017-01-15 Perforation 1633.00 1633.50 20
2017-01-15 Perforation 1595.00 1595.50 20
2017-01-15 Perforation 1555.00 1555.50 20
2017-01-15 Perforation 2204.00 2204.50 20
2017-01-15 Perforation 1515.00 1515.50 20
2017-01-15 Perforation 1468.00 1468.50 20
2017-01-15 Perforation 1430.00 1430.50 20
2017-01-15 Perforation 1391.50 1392.00 20
2017-01-15 Perforation 1348.00 1348.50 20
2017-01-15 Perforation 1310.00 1310.50 20
2017-01-15 Perforation 1270.00 1270.50 20
2017-01-15 Perforation 1230.00 1230.50 20
2017-01-15 Perforation 1191.50 1192.00 20
2017-01-15 Perforation 1112.00 1112.50 20
2017-01-15 Perforation 2164.50 2165.00 20
2017-01-15 Perforation 1079.00 1079.50 20
2017-01-15 Perforation 1042.00 1042.50 20
2017-01-15 Perforation 1006.00 1006.50 20
2017-01-15 Perforation 969.00 969.50 20
2017-01-15 Perforation 933.00 933.50 20
2017-01-15 Perforation 896.00 896.50 20
2017-01-15 Perforation 860.00 860.50 20
2017-01-20 Multi-Stage Fracture 2240.00 2240.50 0
2017-01-20 Multi-Stage Fracture 2204.00 2204.50 0
2017-01-20 Multi-Stage Fracture 2164.50 2165.00 0
2017-01-15 Perforation 2129.00 2129.50 20
2017-01-20 Multi-Stage Fracture 2129.00 2129.50 0
2017-01-20 Multi-Stage Fracture 2094.00 2094.50 0
2017-01-20 Multi-Stage Fracture 2061.50 2062.00 0
2017-01-20 Multi-Stage Fracture 2024.50 2025.00 0
2017-01-20 Multi-Stage Fracture 1988.00 1988.50 0
2017-01-20 Multi-Stage Fracture 1952.00 1952.50 0
2017-01-20 Multi-Stage Fracture 1915.00 1915.50 0
2017-01-20 Multi-Stage Fracture 1875.00 1875.50 0
2017-01-20 Multi-Stage Fracture 1834.00 1834.50 0
2017-01-20 Multi-Stage Fracture 1795.00 1795.50 0
2017-01-15 Perforation 2094.00 2094.50 20
2017-01-20 Multi-Stage Fracture 1755.00 1755.50 0
2017-01-20 Multi-Stage Fracture 1715.00 1715.50 0
2017-01-20 Multi-Stage Fracture 1676.00 1676.50 0
2017-01-20 Multi-Stage Fracture 1633.00 1633.50 0
2017-01-20 Multi-Stage Fracture 1595.00 1595.50 0
2017-01-20 Multi-Stage Fracture 1555.00 1555.50 0
2017-01-20 Multi-Stage Fracture 1515.00 1515.50 0
2017-01-20 Multi-Stage Fracture 1468.00 1468.50 0
2017-01-20 Multi-Stage Fracture 1430.00 1430.50 0
2017-01-20 Multi-Stage Fracture 1391.50 1392.00 0
2017-01-15 Perforation 2061.50 2062.00 20
2017-01-20 Multi-Stage Fracture 1348.00 1348.50 0
2017-01-20 Multi-Stage Fracture 1310.00 1310.50 0
2017-01-20 Multi-Stage Fracture 1270.00 1270.50 0
2017-01-20 Multi-Stage Fracture 1230.00 1230.50 0
2017-01-20 Multi-Stage Fracture 1191.50 1192.00 0
2017-01-20 Multi-Stage Fracture 1112.00 1112.50 0
2017-01-21 Multi-Stage Fracture 1079.00 1079.50 0
2017-01-21 Multi-Stage Fracture 1042.00 1042.50 0
2017-01-21 Multi-Stage Fracture 1006.00 1006.50 0
2017-01-21 Multi-Stage Fracture 969.00 969.50 0
2017-01-15 Perforation 2024.50 2025.00 20
2017-01-21 Multi-Stage Fracture 933.00 933.50 0
2017-01-21 Multi-Stage Fracture 896.00 896.50 0
2017-01-21 Multi-Stage Fracture 860.00 860.50 0
2017-01-15 Perforation 1988.00 1988.50 20
2017-01-15 Perforation 1952.00 1952.50 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-01-20 2017-01-21 725 1,283 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 74.3693 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 10.9131 N/A
Frac Sand - Resin Coated Iron Horse Energy Services Crystalline Silica 14808-60-7 100 4.1588 N/A
may also contain hexamethylenetetramine 100-97-0 100 4.1588 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0106 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1479 N/A
Ethylene glycol 107-21-1 100 0.1479 N/A
Potassium Carbonate 584-08-7 100 0.1479 N/A
Potassium Hydroxide 1310-58-3 100 0.1479 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.2774 N/A
IH-NE-6 Fusion Technologies Inc. Surfactant 2-ethyhexanol 104-76-7 100 0.047 N/A
EO-C7-9-iso. C8-rich alcohols 78330-19-5 100 0.047 N/A
EO-C9-11-iso. C10-rich alcohols 78330-20-8 100 0.047 N/A
Heavy aromatic naptha 64742-94-5 100 0.047 N/A
Isopropanol 67-63-0 100 0.047 N/A
Methanol 67-56-1 100 0.047 N/A
Polyethylene glycol 25322-68-3 100 0.047 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-14 2017-01-14 Surface Water - Lake 847
2017-01-15 2017-01-15 Municipal Water 210
2017-01-14 2017-01-14 Municipal Water 190

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 8093 0.0 0.0 0.0
2018 8438 0.0 0.0 0.0
2019 8751 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-12-20 No Incident Encountered 0.00 0.00
2017-01-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References