X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334020210000

Well Details

Well ID: 0334020210000
Loading map...
Location: 00/10-02-033-02W4/0
Location Alias: 00/10-02-33-02 W4M
Location Alias 2: 00/10-02-033-02 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 02
Section: 02
County/Municipality: Special Areas No. 4
Well Name: ANEGADA HZ 10B ESTHER 10-2-33-2
Operator Name: Baytex Energy Ltd.
License Number: 0470179
License Date: 2014-09-24
License Status: Amended
Spud Date: 2014-10-23
Final Drill Date: 2014-10-25
Well Total Depth: 2435.00 m
Surface Hole Latitude: 51.785213
Surface Hole Longitude: -110.180573

For data sources see[1][2]

Well History

Date Event
2014-09-24 Obtained License
2014-10-23 Surface Casing Operation Performed
2014-10-24 Direction Drilling Operation Performed - Deviate
2014-10-24 Direction Drilling Operation Performed - Horizontal
2014-10-25 Finished Drilling
2014-10-25 Well Log Performed
2014-10-25 Well Mode changed to Drilled and Cased
2014-10-26 Production Casing Operation Performed
2014-10-26 Rig Released
2014-10-31 Well Log Performed
2014-11-10 Well Log Performed
2014-11-30 Perforation Treatment Performed - Multi-Stage Fracture
2014-12-01 Perforation Treatment Performed - Multi-Stage Fracture
2014-12-02 Perforation Treatment Performed - Multi-Stage Fracture
2014-12-05 Well Began Production
2014-12-05 Well Fluid changed to Crude Oil
2014-12-05 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-10-24 438.70 Deviate (5 - 79 degrees)
2014-10-24 851.69 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-11-30 Multi-Stage Fracture 2295.00 2295.50 0
2014-12-01 Multi-Stage Fracture 1937.00 1937.50 0
2014-12-01 Multi-Stage Fracture 1896.00 1896.50 0
2014-12-01 Multi-Stage Fracture 1855.00 1855.50 0
2014-12-01 Multi-Stage Fracture 1815.00 1815.50 0
2014-12-01 Multi-Stage Fracture 1775.00 1775.50 0
2014-12-01 Multi-Stage Fracture 1735.00 1735.50 0
2014-12-01 Multi-Stage Fracture 1695.00 1695.50 0
2014-12-01 Multi-Stage Fracture 1654.00 1654.50 0
2014-12-01 Multi-Stage Fracture 1613.00 1613.50 0
2014-12-01 Multi-Stage Fracture 1577.00 1577.50 0
2014-11-30 Multi-Stage Fracture 2255.00 2255.50 0
2014-12-01 Multi-Stage Fracture 1537.00 1537.50 0
2014-12-01 Multi-Stage Fracture 1496.00 1496.50 0
2014-12-02 Multi-Stage Fracture 1460.00 1460.50 0
2014-12-02 Multi-Stage Fracture 1295.00 1295.50 0
2014-12-02 Multi-Stage Fracture 1265.00 1265.50 0
2014-12-02 Multi-Stage Fracture 1236.00 1236.50 0
2014-12-02 Multi-Stage Fracture 1205.00 1205.50 0
2014-12-02 Multi-Stage Fracture 1175.00 1175.50 0
2014-12-02 Multi-Stage Fracture 1145.00 1145.50 0
2014-12-02 Multi-Stage Fracture 1115.00 1115.50 0
2014-11-30 Multi-Stage Fracture 2215.00 2215.50 0
2014-12-02 Multi-Stage Fracture 1087.00 1087.50 0
2014-12-02 Multi-Stage Fracture 1054.00 1054.50 0
2014-12-02 Multi-Stage Fracture 1025.00 1025.50 0
2014-12-02 Multi-Stage Fracture 995.00 995.50 0
2014-12-02 Multi-Stage Fracture 965.00 965.50 0
2014-12-02 Multi-Stage Fracture 925.00 925.50 0
2014-12-02 Multi-Stage Fracture 895.00 895.50 0
2014-11-30 Multi-Stage Fracture 2175.00 2175.50 0
2014-11-30 Multi-Stage Fracture 2135.00 2135.50 0
2014-11-30 Multi-Stage Fracture 2095.00 2095.50 0
2014-12-01 Multi-Stage Fracture 2055.00 2055.50 0
2014-12-01 Multi-Stage Fracture 2015.00 2015.50 0
2014-12-01 Multi-Stage Fracture 1974.00 1974.50 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-11-30 2014-12-02 732 1,160 N/A
2 2014-12-02 2014-12-02 732 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 81.4045 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 11.8001 N/A
IH-BEZ-4 Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0409 N/A
IH-CS-1 Fusion Technologies Inc. Clay Control Non-Whimis Regulated 64-18-6 100 0.2741 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1572 N/A
Ethylene glycol 107-21-1 100 0.1572 N/A
Potassium Carbonate 584-08-7 100 0.1572 N/A
Potassium Hydroxide 1310-58-3 100 0.1572 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3495 N/A
IH-NE-1 Fusion Technologies Inc. Surfactant 2-ethyhexanol 104-76-7 100 0.0756 N/A
EO-C7-9-iso. C8-rich alcohols 78330-19-5 100 0.0756 N/A
EO-C9-11-iso. C10-rich alcohols 78330-20-8 100 0.0756 N/A
Heavy aromatic naptha 64742-94-5 100 0.0756 N/A
Isopropanol 67-63-0 100 0.0756 N/A
Methanol 67-56-1 100 0.0756 N/A
Napthalene 91-20-3 100 0.0756 N/A
Polyethylene glycol 25322-68-3 100 0.0756 N/A
2 IH-NE-1 Fusion Technologies Inc. Surfactant 1.2.4-trimethylbenzene 95-63-6 100 0.0722 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-10-31 2014-12-05 Municipal Water 1059

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 432 0.0 0.0 0.0
2015 8137 0.0 0.0 0.0
2016 8172 0.0 0.0 0.0
2017 8432 0.0 0.0 0.0
2018 8755 0.0 0.0 0.0
2019 8659 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-26 No Incident Encountered 0.00 0.00
2014-12-05 No Incident Encountered 0.00 0.00

For data sources see[9]

References