X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334081904000

Well Details

Well ID: 0334081904000
Loading map...
Location: 00/04-19-033-08W4/0
Location Alias: 00/04-19-33-08 W4M
Location Alias 2: 00/04-19-033-08 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 08
Section: 19
County/Municipality: Special Areas No. 4
Well Name: HUSKY 4B HZ PROVOST 4-19-33-8
Operator Name: Husky Oil Operations Limited
License Number: 0449696
License Date: 2012-11-01
License Status: Suspension
Spud Date: 2012-11-18
Final Drill Date: 2012-11-23
Well Total Depth: 1602.00 m
Surface Hole Latitude: 51.846500
Surface Hole Longitude: -111.138072

For data sources see[1][2]

Well History

Date Event
2012-11-01 Obtained License
2012-11-19 Surface Casing Operation Performed
2012-11-19 Well Log Performed
2012-11-20 Direction Drilling Operation Performed - Deviate
2012-11-21 Direction Drilling Operation Performed - Horizontal
2012-11-23 Finished Drilling
2012-11-23 Production Casing Operation Performed
2012-11-23 Well Mode changed to Drilled and Cased
2012-11-24 Rig Released
2012-12-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-16 Well Fluid changed to Crude Oil
2012-12-16 Well Mode changed to Drilling and Completing
2013-08-12 Well Began Production
2013-08-12 Well Fluid changed to Crude Oil
2013-08-12 Well Mode changed to Pumping
2014-05-16 Well Fluid changed to Crude Oil
2014-05-16 Well Mode changed to Suspended
2016-08-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-08-17 Plug Back Performed
2016-08-17 Well Fluid changed to Crude Oil
2016-08-17 Well Mode changed to Abandoned Zone
2018-06-13 Well Log Performed
2018-06-21 Perforation Treatment Performed - Jet Perforation
2018-06-21 Well Log Performed
2018-06-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-06-25 Perforation Treatment Performed - Remedial Casing
2018-06-27 Perforation Treatment Performed - Jet Perforation
2018-06-27 Well Log Performed
2018-06-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-06-29 Perforation Treatment Performed - Remedial Casing
2019-05-22 Perforation Treatment Performed - Jet Perforation
2019-05-22 Well Log Performed
2019-05-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-05-24 Perforation Treatment Performed - Remedial Casing
2019-05-25 Perforation Treatment Performed - Jet Perforation
2019-05-25 Well Log Performed
2019-05-27 Perforation Treatment Performed - Jet Perforation
2019-05-27 Well Log Performed
2019-05-29 Perforation Treatment Performed - Remedial Casing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-11-18 Trinidad Drilling Ltd. 61 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-11-20 671.00 Deviate (5 - 79 degrees)
2012-11-21 979.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-12-15 Multi-Stage Fracture 1574.30 1574.70 0
2016-08-17 Packing Device Capped w/Cement 908.00 940.00 0
2018-06-21 Perforation 742.00 745.00 20
2018-06-21 Perforation 742.00 745.00 17
2018-06-25 Remedial Casing Cementing 742.00 745.00 0
2018-06-25 Packing Device Capped w/Cement 722.00 737.00 0
2018-06-27 Perforation 442.00 445.00 20
2018-06-27 Perforation 442.00 445.00 17
2018-06-29 Remedial Casing Cementing 442.00 445.00 0
2018-06-29 Packing Device Capped w/Cement 429.00 438.00 0
2019-05-22 Perforation 190.50 193.50 17
2012-12-15 Multi-Stage Fracture 1520.50 1520.90 0
2019-05-22 Perforation 190.50 193.50 20
2019-05-24 Remedial Casing Cementing 190.50 193.50 0
2019-05-24 Packing Device Capped w/Cement 174.00 186.20 0
2019-05-25 Perforation 147.00 150.00 17
2019-05-25 Perforation 147.00 150.00 20
2019-05-27 Perforation 147.00 150.00 99
2019-05-29 Remedial Casing Cementing 147.00 150.00 0
2012-12-15 Multi-Stage Fracture 1460.40 1460.80 0
2012-12-15 Multi-Stage Fracture 1390.40 1390.80 0
2012-12-15 Multi-Stage Fracture 1340.90 1341.30 0
2012-12-15 Multi-Stage Fracture 1289.40 1289.70 0
2012-12-15 Multi-Stage Fracture 1220.30 1220.70 0
2012-12-15 Multi-Stage Fracture 1159.70 1160.00 0
2012-12-15 Multi-Stage Fracture 1099.50 1099.90 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 0 0.0 0.0 0.0
2013 1720 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-24 No Incident Encountered 0.00 0.00
2013-01-08 No Incident Encountered 0.00 0.00
2016-08-17 No Incident Encountered 0.00 0.00
2018-06-29 No Incident Encountered 0.00 0.00
2019-05-30 No Incident Encountered 0.00 0.00

For data sources see[8]

References