If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344120606023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.888413,"lon":-111.694444,"icon":""}]} |
Location: 02/06-06-034-12W4/3 | |
Location Alias: 02/06-06-34-12 W4M | |
Location Alias 2: 02/06-06-034-12 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 12 | |
Section: 06 | |
County/Municipality: Special Areas No. 2 | |
Well Name: ACANTHUS 102 GARDEN PLAINS 6-6-34-12 | |
Operator Name: Baytex Energy Ltd. | |
License Number: 0274939 | |
License Date: 2002-10-22 | |
License Status: Suspension | |
Spud Date: 2002-11-01 | |
Final Drill Date: 2002-11-04 | |
Well Total Depth: 1127.80 m | |
Surface Hole Latitude: 51.888413 | |
Surface Hole Longitude: -111.694444 |
Date | Event |
---|---|
2002-10-22 | Obtained License |
2002-11-01 | Surface Casing Operation Performed |
2002-11-04 | Finished Drilling |
2002-11-04 | Production Casing Operation Performed |
2002-11-04 | Well Log Performed |
2002-11-04 | Well Mode changed to Drilled and Cased |
2002-11-05 | Rig Released |
2002-11-12 | Perforation Treatment Performed - Jet Perforation |
2003-12-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-12-19 | Perforation Treatment Performed - Jet Perforation |
2003-12-19 | Plug Back Performed |
2004-10-08 | Perforation Treatment Performed - Jet Perforation |
2005-05-18 | Perforation Treatment Performed - Jet Perforation |
2005-05-20 | Well Began Production |
2005-05-20 | Well Fluid changed to Gas |
2005-05-20 | Well Mode changed to Flowing |
2014-09-30 | Well Fluid changed to Gas |
2014-09-30 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-11-12 | Perforation | 1088.00 | 1089.50 | 17 |
2003-12-19 | Packing Device Capped w/Cement | 1077.00 | 1085.00 | 0 |
2003-12-19 | Perforation | 1001.00 | 1003.00 | 17 |
2004-10-08 | Perforation | 1088.00 | 1089.50 | 17 |
2005-05-18 | Perforation | 962.00 | 963.00 | 17 |
2005-05-18 | Perforation | 954.50 | 956.50 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 5875 | 0.0 | 0.0 | 0.0 |
2006 | 7562 | 0.0 | 0.0 | 0.0 |
2007 | 6913 | 0.0 | 0.0 | 0.0 |
2008 | 8408 | 0.0 | 0.0 | 0.0 |
2009 | 7581 | 0.0 | 0.0 | 0.0 |
2010 | 5979 | 0.0 | 0.0 | 0.0 |
2011 | 2056 | 0.0 | 0.0 | 0.0 |
2012 | 1682 | 0.0 | 0.0 | 0.0 |
For data sources see[5]