If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344191914000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.937262,"lon":-112.689128,"icon":""}]} |
Location: 00/14-19-034-19W4/0 | |
Location Alias: 00/14-19-34-19 W4M | |
Location Alias 2: 00/14-19-034-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 19 | |
Section: 19 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: EMBER ET AL RICH 14-19-34-19 | |
Operator Name: Ember Resources Inc. | |
License Number: 0332443 | |
License Date: 2005-06-07 | |
License Status: Amended | |
Spud Date: 2005-08-21 | |
Final Drill Date: 2005-08-24 | |
Well Total Depth: 647.40 m | |
Surface Hole Latitude: 51.937262 | |
Surface Hole Longitude: -112.689128 |
Date | Event |
---|---|
2005-06-07 | Obtained License |
2005-08-22 | Surface Casing Operation Performed |
2005-08-24 | Finished Drilling |
2005-08-24 | Production Casing Operation Performed |
2005-08-24 | Rig Released |
2005-08-24 | Well Log Performed |
2005-08-24 | Well Mode changed to Drilled and Cased |
2005-10-26 | Perforation Treatment Performed - Jet Perforation |
2005-10-29 | Perforation Treatment Performed - Fractured |
2005-11-01 | Perforation Treatment Performed - Jet Perforation |
2005-11-01 | Well Log Performed |
2006-02-01 | Well Began Production |
2006-02-01 | Well Fluid changed to Gas |
2006-02-01 | Well Mode changed to Flowing |
2006-07-01 | Perforation Treatment Performed - Jet Perforation |
2006-07-03 | Perforation Treatment Performed - Fractured |
2006-08-24 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-10-26 | Perforation | 601.00 | 603.00 | 17 |
2006-07-01 | Perforation | 265.00 | 268.00 | 13 |
2006-07-01 | Perforation | 250.00 | 251.00 | 13 |
2006-07-01 | Perforation | 246.00 | 247.00 | 13 |
2006-07-01 | Perforation | 234.00 | 235.00 | 13 |
2006-07-01 | Perforation | 231.00 | 232.00 | 13 |
2006-07-01 | Perforation | 215.50 | 216.50 | 13 |
2006-07-01 | Perforation | 210.00 | 213.00 | 13 |
2006-07-01 | Perforation | 205.00 | 207.00 | 13 |
2006-07-01 | Perforation | 183.00 | 184.00 | 13 |
2006-07-01 | Perforation | 174.00 | 176.00 | 13 |
2005-10-29 | Fracture | 601.00 | 603.00 | 0 |
2006-07-03 | Fracture | 367.00 | 368.00 | 0 |
2006-07-03 | Fracture | 364.00 | 365.00 | 0 |
2006-07-03 | Fracture | 314.00 | 315.00 | 0 |
2006-07-03 | Fracture | 302.00 | 303.00 | 0 |
2006-07-03 | Fracture | 300.00 | 301.00 | 0 |
2006-07-03 | Fracture | 265.00 | 268.00 | 0 |
2006-07-03 | Fracture | 250.00 | 251.00 | 0 |
2006-07-03 | Fracture | 246.00 | 247.00 | 0 |
2006-07-03 | Fracture | 234.00 | 235.00 | 0 |
2006-07-03 | Fracture | 231.00 | 232.00 | 0 |
2005-11-01 | Perforation | 547.00 | 549.50 | 17 |
2006-07-03 | Fracture | 215.50 | 216.50 | 0 |
2006-07-03 | Fracture | 210.00 | 213.00 | 0 |
2006-07-03 | Fracture | 205.00 | 207.00 | 0 |
2006-07-03 | Fracture | 183.00 | 184.00 | 0 |
2006-07-03 | Fracture | 174.00 | 176.00 | 0 |
2005-11-01 | Perforation | 545.00 | 547.00 | 17 |
2006-07-01 | Perforation | 367.00 | 368.00 | 13 |
2006-07-01 | Perforation | 364.00 | 365.00 | 13 |
2006-07-01 | Perforation | 314.00 | 315.00 | 13 |
2006-07-01 | Perforation | 302.00 | 303.00 | 13 |
2006-07-01 | Perforation | 300.00 | 301.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 7766 | 0.0 | 0.0 | 0.0 |
2007 | 8748 | 0.0 | 0.0 | 0.0 |
2008 | 8781 | 0.0 | 0.0 | 0.0 |
2009 | 8752 | 0.0 | 0.0 | 0.0 |
2010 | 8757 | 0.0 | 0.0 | 0.0 |
2011 | 8754 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8667 | 0.0 | 0.0 | 0.0 |
2016 | 8644 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8681 | 0.0 | 0.0 | 0.0 |
2019 | 8532 | 0.0 | 0.0 | 0.0 |
2020 | 2172 | 0.0 | 0.0 | 0.0 |
For data sources see[5]