If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344202302002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.928815,"lon":-112.731307,"icon":""}]} |
Location: 00/02-23-034-20W4/2 | |
Location Alias: 00/02-23-34-20 W4M | |
Location Alias 2: 00/02-23-034-20 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 20 | |
Section: 23 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: EMBER RICH 2-23-34-20 | |
Operator Name: Ember Resources Inc. | |
License Number: 0336433 | |
License Date: 2005-08-15 | |
License Status: Issued | |
Spud Date: 2005-10-28 | |
Final Drill Date: 2005-10-31 | |
Well Total Depth: 655.00 m | |
Surface Hole Latitude: 51.928815 | |
Surface Hole Longitude: -112.731307 |
Date | Event |
---|---|
2005-08-15 | Obtained License |
2005-10-29 | Surface Casing Operation Performed |
2005-10-31 | Finished Drilling |
2005-10-31 | Production Casing Operation Performed |
2005-10-31 | Rig Released |
2005-10-31 | Well Mode changed to Drilled and Cased |
2005-11-12 | Well Log Performed |
2005-12-22 | Perforation Treatment Performed - Jet Perforation |
2005-12-22 | Well Log Performed |
2006-01-06 | Perforation Treatment Performed - Fractured |
2006-01-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-01-18 | Plug Back Performed |
2006-01-18 | Well Log Performed |
2006-02-22 | Perforation Treatment Performed - Jet Perforation |
2006-02-22 | Well Log Performed |
2006-02-25 | Perforation Treatment Performed - Fractured |
2006-03-07 | Well Began Production |
2006-03-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-03-07 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-12-22 | Perforation | 471.00 | 475.00 | 17 |
2006-02-22 | Perforation | 251.50 | 252.50 | 14 |
2006-02-22 | Perforation | 236.50 | 237.50 | 14 |
2006-02-22 | Perforation | 233.50 | 234.50 | 14 |
2006-02-22 | Perforation | 231.00 | 232.00 | 14 |
2006-02-22 | Perforation | 224.00 | 225.00 | 14 |
2006-02-22 | Perforation | 221.00 | 222.00 | 14 |
2006-02-22 | Perforation | 204.00 | 205.00 | 14 |
2006-02-22 | Perforation | 197.00 | 198.00 | 14 |
2006-02-22 | Perforation | 188.00 | 189.00 | 14 |
2006-02-25 | Fracture | 391.50 | 393.50 | 0 |
2006-01-06 | Fracture | 471.00 | 475.00 | 0 |
2006-02-25 | Fracture | 340.50 | 341.50 | 0 |
2006-02-25 | Fracture | 333.80 | 334.80 | 0 |
2006-02-25 | Fracture | 285.00 | 287.00 | 0 |
2006-02-25 | Fracture | 270.00 | 272.00 | 0 |
2006-02-25 | Fracture | 267.00 | 268.00 | 0 |
2006-02-25 | Fracture | 251.50 | 252.50 | 0 |
2006-02-25 | Fracture | 236.50 | 237.50 | 0 |
2006-02-25 | Fracture | 233.50 | 234.50 | 0 |
2006-02-25 | Fracture | 231.00 | 232.00 | 0 |
2006-02-25 | Fracture | 224.00 | 225.00 | 0 |
2006-01-18 | Packing Device Capped w/Cement | 455.00 | 463.00 | 0 |
2006-02-25 | Fracture | 221.00 | 222.00 | 0 |
2006-02-25 | Fracture | 204.00 | 205.00 | 0 |
2006-02-25 | Fracture | 197.00 | 198.00 | 0 |
2006-02-25 | Fracture | 188.00 | 189.00 | 0 |
2006-02-22 | Perforation | 391.50 | 393.50 | 14 |
2006-02-22 | Perforation | 340.50 | 341.50 | 14 |
2006-02-22 | Perforation | 333.80 | 334.80 | 14 |
2006-02-22 | Perforation | 285.00 | 287.00 | 14 |
2006-02-22 | Perforation | 270.00 | 272.00 | 14 |
2006-02-22 | Perforation | 267.00 | 268.00 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 7071 | 0.0 | 0.0 | 0.0 |
2007 | 8684 | 0.0 | 0.0 | 0.0 |
2008 | 8688 | 0.0 | 0.0 | 0.0 |
2009 | 8697 | 0.0 | 0.0 | 0.0 |
2010 | 8682 | 0.0 | 0.0 | 0.0 |
2011 | 8712 | 0.0 | 0.0 | 0.0 |
2012 | 8697 | 0.0 | 0.0 | 0.0 |
2013 | 8691 | 0.0 | 0.0 | 0.0 |
2014 | 8382 | 0.0 | 0.0 | 0.0 |
2015 | 8620 | 0.0 | 0.0 | 0.0 |
2016 | 8643 | 0.0 | 0.0 | 0.0 |
2017 | 8678 | 0.0 | 0.0 | 0.0 |
2018 | 8629 | 0.0 | 0.0 | 0.0 |
2019 | 8532 | 0.0 | 0.0 | 0.0 |
2020 | 2172 | 0.0 | 0.0 | 0.0 |
For data sources see[5]