X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354151601002

Well Details

Well ID: 0354151601002
Loading map...
Location: 00/01-16-035-15W4/2
Location Alias: 00/01-16-35-15 W4M
Location Alias 2: 00/01-16-035-15 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 15
Section: 16
County/Municipality: County of Stettler No. 6
Well Name: CPEC ENDIANG 1-16-35-15
Operator Name: Crescent Point Energy Corp.
License Number: 0296902
License Date: 2003-11-26
License Status: Abandoned
Spud Date: 2004-01-18
Final Drill Date: 2004-01-20
Well Total Depth: 1210.00 m
Surface Hole Latitude: 52.000959
Surface Hole Longitude: -112.081848

For data sources see[1][2]

Well History

Date Event
2003-11-26 Obtained License
2004-01-18 Surface Casing Operation Performed
2004-01-19 Production Casing Operation Performed
2004-01-20 Finished Drilling
2004-01-20 Well Log Performed
2004-01-20 Well Mode changed to Drilled and Cased
2004-01-21 Rig Released
2004-01-23 Well Log Performed
2004-01-31 Perforation Treatment Performed - Jet Perforation
2004-01-31 Well Log Performed
2004-03-11 Perforation Treatment Performed - Jet Perforation
2004-03-12 Well Log Performed
2004-05-03 Perforation Treatment Performed - Jet Perforation
2004-05-03 Well Log Performed
2004-05-27 Perforation Treatment Performed - Bridge Plug No Cement Required
2004-05-27 Perforation Treatment Performed - Cement Plug
2004-05-27 Plug Back Performed
2004-05-27 Well Log Performed
2008-03-04 Perforation Treatment Performed - Jet Perforation
2008-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-09 Plug Back Performed
2008-10-09 Well Mode changed to Abandoned Zone
2008-10-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-01-31 Perforation 1158.00 1161.50 17
2008-10-09 Packing Device Capped w/Cement 993.00 1001.50 0
2004-03-11 Perforation 1131.00 1139.00 17
2004-05-03 Perforation 1026.00 1029.00 17
2004-05-27 Bridge Plug, No Cement 1125.00 1125.30 0
2004-05-27 Cement Plug 1117.00 1125.00 0
2008-03-04 Perforation 1010.50 1012.00 13
2008-03-04 Perforation 1015.00 1017.00 13
2008-10-09 Packing Device Capped w/Cement 1140.00 1148.50 0
2008-10-09 Packing Device Capped w/Cement 1113.00 1121.50 0

For data sources see[4]



References