X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354161014000

Well Details

Well ID: 0354161014000
Loading map...
Location: 00/14-10-035-16W4/0
Location Alias: 00/14-10-35-16 W4M
Location Alias 2: 00/14-10-035-16 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 16
Section: 10
County/Municipality: County of Stettler No. 6
Well Name: OMERS ENDIANG 14-10-35-16
Operator Name: Canadian Natural Resources Limited
License Number: 0101311
License Date: 1983-05-11
License Status: RecCertified
Spud Date: 1983-05-15
Final Drill Date: 1983-05-19
Well Total Depth: 1245.00 m
Surface Hole Latitude: 51.994188
Surface Hole Longitude: -112.208241

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-05-11 Obtained License
1983-05-19 Drill Stem Test Performed
1983-05-19 Finished Drilling
1983-05-20 Drill Stem Test Performed
1983-05-21 Production Casing Operation Performed
1983-05-26 Perforation Treatment Performed - Jet Perforation
1983-05-26 Well Mode changed to Drilled and Cased
1983-11-27 Well Began Production
1983-11-27 Well Fluid changed to Gas
1983-11-27 Well Mode changed to Flowing
1983-12-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-10-13 Plug Back Performed
1990-10-13 Well Fluid changed to Gas
1990-10-13 Well Mode changed to Abandoned Zone
1990-10-18 Well Log Performed
1990-11-02 Perforation Treatment Performed - Jet Perforation
1990-11-03 Perforation Treatment Performed - Remedial Casing
1993-08-02 Well Abandoned
1993-08-02 Well Fluid changed to Gas
1993-08-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-05-26 Perforation 1216.00 1219.50 7
1983-12-30 Acid Treatment 1216.00 1219.50 0
1990-10-13 Packing Device Capped w/Cement 1202.00 1210.00 0
1990-11-02 Perforation 200.00 200.50 7
1990-11-02 Perforation 277.00 277.50 7
1990-11-03 Remedial Casing Cementing 200.00 277.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 722 0.0 0.0 0.0
1984 7859 0.0 0.0 0.0
1985 8217 0.0 0.0 0.0
1986 6523 0.0 0.0 0.0
1987 7485 0.0 0.0 0.0
1988 8017 0.0 0.0 0.0
1989 5983 0.0 0.0 0.0
1990 168 0.0 0.0 0.0

For data sources see[5]

References