X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354181201000

Well Details

Well ID: 0354181201000
Loading map...
Location: 00/01-12-035-18W4/0
Location Alias: 00/01-12-35-18 W4M
Location Alias 2: 00/01-12-035-18 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 18
Section: 12
County/Municipality: County of Stettler No. 6
Well Name: STARPOINT LEO 1-12-35-18
Operator Name: Obsidian Energy Ltd.
License Number: 0226954
License Date: 1999-09-30
License Status: Abandoned
Spud Date: 1999-10-10
Final Drill Date: 1999-10-11
Well Total Depth: 626.00 m
Surface Hole Latitude: 51.985563
Surface Hole Longitude: -112.438250

For data sources see[1][2]

Well History

Date Event
1999-09-30 Obtained License
1999-10-10 Surface Casing Operation Performed
1999-10-11 Finished Drilling
1999-10-12 Production Casing Operation Performed
1999-10-12 Rig Released
1999-10-12 Well Log Performed
1999-10-12 Well Mode changed to Drilled and Cased
1999-10-17 Well Log Performed
1999-10-20 Perforation Treatment Performed - Jet Perforation
1999-11-02 Perforation Treatment Performed - Cement Squeeze
1999-11-04 Perforation Treatment Performed - Jet Perforation
2000-02-21 Well Began Production
2000-02-21 Well Fluid changed to Gas
2000-02-21 Well Mode changed to Flowing
2018-12-31 Well Fluid changed to Gas
2018-12-31 Well Mode changed to Suspended
2019-09-01 Well Fluid changed to Gas
2019-09-01 Well Mode changed to Flowing
2019-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-24 Plug Back Performed
2019-09-24 Well Fluid changed to Gas
2019-09-24 Well Mode changed to Abandoned Zone
2019-10-24 Well Abandoned
2019-10-24 Well Fluid changed to Gas
2019-10-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-10-20 Perforation 386.00 390.00 13
1999-11-02 Cement Squeeze 386.00 390.00 0
1999-11-04 Perforation 118.50 120.00 14
1999-11-04 Perforation 222.00 223.00 14
1999-11-04 Perforation 550.50 554.00 14
2019-09-24 Packing Device Capped w/Cement 369.80 377.80 0
2019-09-24 Packing Device Capped w/Cement 106.80 114.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 6858 0.0 0.0 0.0
2001 7801 0.0 0.0 0.0
2002 8302 0.0 0.0 0.0
2003 8251 0.0 0.0 0.0
2004 8081 0.0 0.0 0.0
2005 8594 0.0 0.0 0.0
2006 8438 0.0 0.0 0.0
2007 8205 0.0 0.0 0.0
2008 32 0.0 0.0 0.0
2009 1559 0.0 0.0 0.0
2010 7233 0.0 0.0 0.0
2011 8654 0.0 0.0 0.0
2012 8406 0.0 0.0 0.0
2013 8688 0.0 0.0 0.0
2014 8680 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 4869 0.0 0.0 0.0
2019 24 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-09-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References