If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354190512002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.975956,"lon":-112.689628,"icon":""}]} |
Location: 00/12-05-035-19W4/2 | |
Location Alias: 00/12-05-35-19 W4M | |
Location Alias 2: 00/12-05-035-19 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 19 | |
Section: 05 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: EMBER FENNBV 12-5-35-19 | |
Operator Name: Ember Resources Inc. | |
License Number: 0260383 | |
License Date: 2001-10-09 | |
License Status: Issued | |
Spud Date: 2001-10-26 | |
Final Drill Date: 2001-10-27 | |
Well Total Depth: 704.00 m | |
Surface Hole Latitude: 51.975956 | |
Surface Hole Longitude: -112.689628 |
Date | Event |
---|---|
2001-10-09 | Obtained License |
2001-10-26 | Surface Casing Operation Performed |
2001-10-26 | Well Log Performed |
2001-10-27 | Finished Drilling |
2001-10-27 | Production Casing Operation Performed |
2001-10-27 | Rig Released |
2001-10-27 | Well Log Performed |
2001-10-27 | Well Mode changed to Drilled and Cased |
2001-10-30 | Well Log Performed |
2001-10-31 | Perforation Treatment Performed - Jet Perforation |
2001-11-02 | Perforation Treatment Performed - Fractured |
2011-08-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-08-12 | Perforation Treatment Performed - Jet Perforation |
2011-08-12 | Plug Back Performed |
2011-09-10 | Perforation Treatment Performed - Fractured |
2011-09-15 | Well Began Production |
2011-09-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-09-15 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-10-31 | Perforation | 665.00 | 668.00 | 14 |
2011-08-12 | Perforation | 329.50 | 330.50 | 13 |
2011-08-12 | Perforation | 288.00 | 289.50 | 13 |
2011-08-12 | Perforation | 275.00 | 276.00 | 13 |
2011-08-12 | Perforation | 272.00 | 273.00 | 13 |
2011-08-12 | Perforation | 259.00 | 261.00 | 13 |
2011-08-12 | Perforation | 246.50 | 248.00 | 13 |
2011-08-12 | Perforation | 243.50 | 245.00 | 13 |
2011-08-12 | Perforation | 226.00 | 227.00 | 13 |
2011-08-12 | Perforation | 214.50 | 215.50 | 13 |
2011-08-12 | Perforation | 210.50 | 211.50 | 13 |
2001-10-31 | Perforation | 557.50 | 560.50 | 14 |
2011-08-12 | Perforation | 203.50 | 204.50 | 13 |
2011-08-12 | Perforation | 194.00 | 196.00 | 13 |
2011-09-10 | Fracture | 403.00 | 404.50 | 0 |
2011-09-10 | Fracture | 396.50 | 397.50 | 0 |
2011-09-10 | Fracture | 393.50 | 395.00 | 0 |
2011-09-10 | Fracture | 344.00 | 345.00 | 0 |
2011-09-10 | Fracture | 329.50 | 330.50 | 0 |
2011-09-10 | Fracture | 288.00 | 289.50 | 0 |
2011-09-10 | Fracture | 275.00 | 276.00 | 0 |
2011-09-10 | Fracture | 272.00 | 273.00 | 0 |
2001-11-02 | Fracture | 665.00 | 668.00 | 0 |
2011-09-10 | Fracture | 259.00 | 261.00 | 0 |
2011-09-10 | Fracture | 246.50 | 248.00 | 0 |
2011-09-10 | Fracture | 243.50 | 245.00 | 0 |
2011-09-10 | Fracture | 226.00 | 227.00 | 0 |
2011-09-10 | Fracture | 214.50 | 215.50 | 0 |
2011-09-10 | Fracture | 210.50 | 211.50 | 0 |
2011-09-10 | Fracture | 203.50 | 204.50 | 0 |
2011-09-10 | Fracture | 194.00 | 196.00 | 0 |
2001-11-02 | Fracture | 557.50 | 560.50 | 0 |
2011-08-12 | Packing Device Capped w/Cement | 542.00 | 550.00 | 0 |
2011-08-12 | Perforation | 403.00 | 404.50 | 13 |
2011-08-12 | Perforation | 396.50 | 397.50 | 13 |
2011-08-12 | Perforation | 393.50 | 395.00 | 13 |
2011-08-12 | Perforation | 344.00 | 345.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 2583 | 0.0 | 0.0 | 0.0 |
2012 | 8675 | 0.0 | 0.0 | 0.0 |
2013 | 8668 | 0.0 | 0.0 | 0.0 |
2014 | 8664 | 0.0 | 0.0 | 0.0 |
2015 | 8452 | 0.0 | 0.0 | 0.0 |
2016 | 8658 | 0.0 | 0.0 | 0.0 |
2017 | 8693 | 0.0 | 0.0 | 0.0 |
2018 | 8641 | 0.0 | 0.0 | 0.0 |
2019 | 8525 | 0.0 | 0.0 | 0.0 |
2020 | 2021 | 0.0 | 0.0 | 0.0 |
For data sources see[5]