If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354192007000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.016122,"lon":-112.67761,"icon":""}]} |
Location: 00/07-20-035-19W4/0 | |
Location Alias: 00/07-20-35-19 W4M | |
Location Alias 2: 00/07-20-035-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 19 | |
Section: 20 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: EMBER FENNBV 7-20-35-19 | |
Operator Name: Ember Resources Inc. | |
License Number: 0383551 | |
License Date: 2007-10-22 | |
License Status: Amended | |
Spud Date: 2008-10-01 | |
Final Drill Date: 2008-10-02 | |
Well Total Depth: 403.00 m | |
Surface Hole Latitude: 52.016122 | |
Surface Hole Longitude: -112.677610 |
Date | Event |
---|---|
2007-10-22 | Obtained License |
2008-10-01 | Surface Casing Operation Performed |
2008-10-02 | Finished Drilling |
2008-10-02 | Production Casing Operation Performed |
2008-10-02 | Rig Released |
2008-10-02 | Well Mode changed to Drilled and Cased |
2008-10-15 | Well Log Performed |
2008-10-25 | Perforation Treatment Performed - Jet Perforation |
2008-10-25 | Well Log Performed |
2008-11-01 | Perforation Treatment Performed - Fractured |
2008-11-05 | Well Began Production |
2008-11-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-11-05 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-10-25 | Perforation | 358.70 | 359.20 | 13 |
2008-10-25 | Perforation | 228.20 | 228.70 | 13 |
2008-10-25 | Perforation | 224.40 | 224.90 | 13 |
2008-10-25 | Perforation | 219.70 | 220.20 | 13 |
2008-10-25 | Perforation | 212.20 | 212.70 | 13 |
2008-10-25 | Perforation | 208.40 | 210.90 | 13 |
2008-10-25 | Perforation | 200.80 | 201.30 | 13 |
2008-10-25 | Perforation | 195.20 | 195.70 | 13 |
2008-10-25 | Perforation | 193.00 | 194.00 | 13 |
2008-10-25 | Perforation | 187.50 | 188.00 | 13 |
2008-10-25 | Perforation | 181.80 | 182.80 | 13 |
2008-10-25 | Perforation | 311.40 | 311.90 | 13 |
2008-10-25 | Perforation | 147.60 | 148.60 | 13 |
2008-11-01 | Fracture | 358.70 | 359.20 | 0 |
2008-11-01 | Fracture | 311.40 | 311.90 | 0 |
2008-11-01 | Fracture | 305.20 | 305.70 | 0 |
2008-11-01 | Fracture | 289.30 | 289.80 | 0 |
2008-11-01 | Fracture | 253.40 | 253.90 | 0 |
2008-11-01 | Fracture | 249.50 | 250.50 | 0 |
2008-11-01 | Fracture | 242.70 | 243.20 | 0 |
2008-11-01 | Fracture | 238.60 | 239.60 | 0 |
2008-11-01 | Fracture | 236.80 | 237.30 | 0 |
2008-10-25 | Perforation | 305.20 | 305.70 | 13 |
2008-11-01 | Fracture | 228.20 | 228.70 | 0 |
2008-11-01 | Fracture | 224.40 | 224.90 | 0 |
2008-11-01 | Fracture | 219.70 | 220.20 | 0 |
2008-11-01 | Fracture | 212.20 | 212.70 | 0 |
2008-11-01 | Fracture | 208.40 | 210.90 | 0 |
2008-11-01 | Fracture | 200.80 | 201.30 | 0 |
2008-11-01 | Fracture | 195.20 | 195.70 | 0 |
2008-11-01 | Fracture | 193.00 | 194.00 | 0 |
2008-11-01 | Fracture | 187.50 | 188.00 | 0 |
2008-11-01 | Fracture | 181.80 | 182.80 | 0 |
2008-10-25 | Perforation | 289.30 | 289.80 | 13 |
2008-11-01 | Fracture | 147.60 | 148.60 | 0 |
2008-10-25 | Perforation | 253.40 | 253.90 | 13 |
2008-10-25 | Perforation | 249.50 | 250.50 | 13 |
2008-10-25 | Perforation | 242.70 | 243.20 | 13 |
2008-10-25 | Perforation | 238.60 | 239.60 | 13 |
2008-10-25 | Perforation | 236.80 | 237.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 1269 | 0.0 | 0.0 | 0.0 |
2009 | 7479 | 0.0 | 0.0 | 0.0 |
2010 | 7455 | 0.0 | 0.0 | 0.0 |
2011 | 8297 | 0.0 | 0.0 | 0.0 |
2012 | 8678 | 0.0 | 0.0 | 0.0 |
2013 | 4786 | 0.0 | 0.0 | 0.0 |
2014 | 8535 | 0.0 | 0.0 | 0.0 |
2015 | 8656 | 0.0 | 0.0 | 0.0 |
2016 | 8175 | 0.0 | 0.0 | 0.0 |
2017 | 8414 | 0.0 | 0.0 | 0.0 |
2018 | 7106 | 0.0 | 0.0 | 0.0 |
2019 | 8100 | 0.0 | 0.0 | 0.0 |
2020 | 2169 | 0.0 | 0.0 | 0.0 |
For data sources see[5]