X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354201515000

Well Details

Well ID: 0354201515000
Loading map...
Location: 00/15-15-035-20W4/0
Location Alias: 00/15-15-35-20 W4M
Location Alias 2: 00/15-15-035-20 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 15
County/Municipality: County of Stettler No. 6
Well Name: BLAIR ASHLAND FENNBV 15-15-35-20
Operator Name: Blair, Edwin Foster, Estate Of
License Number: 0020049
License Date: 1960-12-02
License Status: Abandoned
Spud Date: 1960-12-05
Final Drill Date: 1960-12-28
Well Total Depth: 1598.10 m
Surface Hole Latitude: 52.010551
Surface Hole Longitude: -112.775283

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-12-02 Obtained License
1960-12-22 Production Casing Operation Performed
1960-12-28 Finished Drilling
1960-12-28 Well Mode changed to Drilled and Cased
1960-12-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-12-30 Perforation Treatment Performed - Bullet Perforation
1961-01-18 Well Began Production
1961-01-18 Well Fluid changed to Crude Oil
1961-01-18 Well Mode changed to Flowing
1975-06-10 Well Fluid changed to Crude Oil
1975-06-10 Well Mode changed to Pumping
1989-01-01 Well Fluid changed to Crude Oil
1989-01-01 Well Mode changed to Suspended
1995-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-29 Perforation Treatment Performed - Jet Perforation
1995-07-29 Perforation Treatment Performed - Remedial Casing
1995-07-29 Plug Back Performed
1995-07-29 Well Fluid changed to Crude Oil
1995-07-29 Well Mode changed to Abandoned
1995-07-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-12-30 Packing Device Capped w/Cement 1595.90 1595.90 0
1960-12-30 Bullet Perforation 1594.40 1595.60 13
1995-07-29 Packing Device Capped w/Cement 1575.00 1583.00 0
1995-07-29 Perforation 189.00 189.50 14
1995-07-29 Remedial Casing Cementing 189.00 189.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1044 0.0 0.0 0.0
1969 7199 0.0 0.0 0.0
1970 6535 0.0 0.0 0.0
1971 7202 0.0 0.0 0.0
1972 8656 0.0 0.0 0.0
1973 7805 0.0 0.0 0.0
1974 5453 0.0 0.0 0.0
1975 7799 0.0 0.0 0.0
1976 8351 0.0 0.0 0.0
1977 8208 0.0 0.0 0.0
1978 8347 0.0 0.0 0.0
1979 7894 0.0 0.0 0.0
1980 7349 0.0 0.0 0.0
1981 8176 0.0 0.0 0.0
1982 6519 0.0 0.0 0.0
1983 7508 0.0 0.0 0.0
1984 8349 0.0 0.0 0.0
1985 8326 0.0 0.0 0.0
1986 8624 0.0 0.0 0.0
1987 8268 0.0 0.0 0.0
1988 8447 0.0 0.0 0.0

For data sources see[5]

References