X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354202603000

Well Details

Well ID: 0354202603000
Loading map...
Location: 00/03-26-035-20W4/0
Location Alias: 00/03-26-35-20 W4M
Location Alias 2: 00/03-26-035-20 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 26
County/Municipality: Big Valley
Well Name: IMP HB FENN BV 3-26N-35-20
Operator Name: Imperial Oil Resources Limited
License Number: 0007420
License Date: 1953-12-04
License Status: Abandoned
Spud Date: 1954-01-13
Final Drill Date: 1954-02-09
Well Total Depth: 1597.80 m
Surface Hole Latitude: 52.028775
Surface Hole Longitude: -112.758147

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-12-04 Obtained License
1954-02-09 Finished Drilling
1954-02-09 Well Mode changed to Drilled and Cased
1954-02-11 Drill Stem Test Performed
1954-02-11 Production Casing Operation Performed
1954-02-13 Perforation Treatment Performed - Open-Hole Completion
1954-03-03 Well Began Production
1954-03-03 Well Fluid changed to Crude Oil
1954-03-03 Well Mode changed to Flowing
1980-05-12 Perforation Treatment Performed - Cement Plug
1980-05-12 Perforation Treatment Performed - Open-Hole Completion
1983-01-22 Perforation Treatment Performed - Cement Plug
1983-01-22 Perforation Treatment Performed - Open-Hole Completion
1987-06-24 Perforation Treatment Performed - Cement Plug
1987-06-24 Perforation Treatment Performed - Open-Hole Completion
1987-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-01 Well Fluid changed to Crude Oil
1988-08-01 Well Mode changed to Suspended
1990-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-10-06 Plug Back Performed
1990-10-06 Well Fluid changed to Crude Oil
1990-10-06 Well Mode changed to Abandoned
1990-10-07 Perforation Treatment Performed - Jet Perforation
1990-10-07 Well Log Performed
1990-10-08 Perforation Treatment Performed - Remedial Casing
1990-10-31 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-02-13 Open Hole/Barefoot Completion 1579.50 1597.80 0
1990-10-06 Packing Device Capped w/Cement 1562.00 1570.00 0
1990-10-07 Perforation 1163.00 1163.50 13
1990-10-07 Perforation 208.30 208.80 13
1990-10-08 Remedial Casing Cementing 208.30 208.80 0
1980-05-12 Cement Plug 1591.10 1597.80 0
1980-05-12 Open Hole/Barefoot Completion 1579.50 1591.10 0
1983-01-22 Cement Plug 1584.50 1590.50 0
1983-01-22 Open Hole/Barefoot Completion 1579.50 1584.50 0
1987-06-24 Cement Plug 1582.00 1584.50 0
1987-06-24 Open Hole/Barefoot Completion 1579.50 1582.00 0
1987-07-03 Acid Treatment 1579.50 1582.00 0
1987-08-31 Acid Treatment 1579.50 1582.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1980 3199 0.0 0.0 0.0
1981 2678 0.0 0.0 0.0
1982 4540 0.0 0.0 0.0
1983 5227 0.0 0.0 0.0
1984 7681 0.0 0.0 0.0
1985 6879 0.0 0.0 0.0
1986 8134 0.0 0.0 0.0
1987 7677 0.0 0.0 0.0
1988 4500 0.0 0.0 0.0

For data sources see[5]

References