X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354202613000

Well Details

Well ID: 0354202613000
Loading map...
Location: 00/13-26-035-20W4/0
Location Alias: 00/13-26-35-20 W4M
Location Alias 2: 00/13-26-035-20 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 26
County/Municipality: County of Stettler No. 6
Well Name: IMP HB FENN BV 13-26N-35-20
Operator Name: Imperial Oil Resources Limited
License Number: 0008127
License Date: 1954-06-16
License Status: RecCertified
Spud Date: 1954-06-18
Final Drill Date: 1954-07-04
Well Total Depth: 1631.30 m
Surface Hole Latitude: 52.039602
Surface Hole Longitude: -112.762893

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-06-16 Obtained License
1954-07-04 Finished Drilling
1954-07-04 Well Mode changed to Drilled and Cased
1954-07-05 Production Casing Operation Performed
1954-07-07 Perforation Treatment Performed - Open-Hole Completion
1954-07-22 Well Began Production
1954-07-22 Well Fluid changed to Crude Oil
1954-07-22 Well Mode changed to Flowing
1979-10-23 Perforation Treatment Performed - Cement Plug
1979-10-23 Perforation Treatment Performed - Open-Hole Completion
1983-03-01 Well Fluid changed to Crude Oil
1983-03-01 Well Mode changed to Suspended
1990-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-29 Plug Back Performed
1990-09-29 Well Fluid changed to Crude Oil
1990-09-29 Well Log Performed
1990-09-29 Well Mode changed to Abandoned
1990-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-30 Perforation Treatment Performed - Jet Perforation
1990-10-01 Perforation Treatment Performed - Remedial Casing
1990-11-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-07-07 Open Hole/Barefoot Completion 1617.00 1631.30 0
1979-10-23 Cement Plug 1621.10 1631.30 0
1979-10-23 Open Hole/Barefoot Completion 1617.00 1621.10 0
1990-09-29 Packing Device Capped w/Cement 1597.00 1605.00 0
1990-09-30 Perforation 1213.00 1213.50 13
1990-09-30 Packing Device Capped w/Cement 831.00 839.00 0
1990-09-30 Perforation 240.90 241.50 13
1990-10-01 Remedial Casing Cementing 240.90 241.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1979 1192 0.0 0.0 0.0
1980 4377 0.0 0.0 0.0
1981 7519 0.0 0.0 0.0
1982 7077 0.0 0.0 0.0
1983 1411 0.0 0.0 0.0

For data sources see[5]

References