X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354203509000

Well Details

Well ID: 0354203509000
Loading map...
Location: 00/09-35-035-20W4/0
Location Alias: 00/09-35-35-20 W4M
Location Alias 2: 00/09-35-035-20 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 35
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH FENNBV 9-35-35-20
Operator Name: Enhance Energy Inc.
License Number: 0004815
License Date: 1952-06-11
License Status: Issued
Spud Date: 1952-06-11
Final Drill Date: 1952-07-19
Well Total Depth: 1649.00 m
Surface Hole Latitude: 52.050071
Surface Hole Longitude: -112.746200

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-06-11 Obtained License
1952-06-19 Drill Stem Test Performed
1952-06-19 Lost Circulation Occurred
1952-06-22 Drill Stem Test Performed
1952-06-23 Drill Stem Test Performed
1952-07-02 Drill Stem Test Performed
1952-07-08 Drill Stem Test Performed
1952-07-09 Drill Stem Test Performed
1952-07-12 Liner Casing Operation Performed
1952-07-15 Drill Stem Test Performed
1952-07-16 Drill Stem Test Performed
1952-07-17 Drill Stem Test Performed
1952-07-19 Finished Drilling
1952-07-19 Lost Circulation Occurred
1952-07-19 Well Mode changed to Drilled and Cased
1952-07-21 Drill Stem Test Performed
1952-07-30 Perforation Treatment Performed - Bullet Perforation
1952-08-09 Well Began Production
1952-08-09 Well Fluid changed to Crude Oil
1952-08-09 Well Mode changed to Flowing
1965-01-28 Perforation Treatment Performed - Jet Perforation
1965-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-09-19 Perforation Treatment Performed - Cement Squeeze
1965-09-19 Well Fluid changed to Crude Oil
1965-09-19 Well Mode changed to Abandoned Zone
1965-09-23 Perforation Treatment Performed - Cement Squeeze
1965-09-26 Perforation Treatment Performed - Jet Perforation
1965-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-19 Perforation Treatment Performed - Cement Squeeze
1980-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-25 Perforation Treatment Performed - Jet Perforation
1980-03-25 Well Fluid changed to Crude Oil
1980-03-25 Well Mode changed to Pumping
1982-12-17 Perforation Treatment Performed - Cement Squeeze
1982-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-21 Perforation Treatment Performed - Jet Perforation
1984-11-22 Perforation Treatment Performed - Cement Squeeze
1984-11-24 Perforation Treatment Performed - Jet Perforation
1985-05-08 Perforation Treatment Performed - Cement Squeeze
1985-05-10 Perforation Treatment Performed - Jet Perforation
1985-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-26 Perforation Treatment Performed - Cement Squeeze
1990-10-31 Perforation Treatment Performed - Jet Perforation
1990-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-02 Perforation Treatment Performed - Jet Perforation
1997-01-16 Perforation Treatment Performed - Cement Squeeze
1997-01-16 Plug Back Performed
1997-01-16 Well Fluid changed to Crude Oil
1997-01-16 Well Mode changed to Abandoned Zone
1997-01-27 Perforation Treatment Performed - Jet Perforation
1997-01-27 Well Log Performed
1997-01-29 Well Log Performed
1997-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-24 Perforation Treatment Performed - Jet Perforation
1997-02-24 Well Log Performed
1997-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-25 Perforation Treatment Performed - Cement Squeeze
1997-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-02 Perforation Treatment Performed - Jet Perforation
1997-03-02 Well Log Performed
1997-03-28 Perforation Treatment Performed - Chemical Squeeze
1997-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-05-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-05-30 Plug Back Performed
1997-05-30 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-07-30 Bullet Perforation 1610.60 1622.80 13
1965-09-26 Perforation 1644.70 1645.00 13
1965-09-27 Acid Treatment 1644.70 1645.00 0
1980-03-19 Cement Squeeze 1644.70 1645.00 0
1980-03-25 Perforation 1608.00 1613.00 13
1980-03-25 Acid Treatment 1608.00 1613.00 0
1982-12-17 Cement Squeeze 1608.00 1613.00 0
1982-12-21 Perforation 1608.00 1610.30 13
1982-12-21 Acid Treatment 1608.00 1610.30 0
1984-11-22 Cement Squeeze 1608.00 1610.30 0
1984-11-24 Perforation 1606.80 1608.80 13
1965-01-28 Perforation 1645.30 1645.60 7
1985-05-08 Cement Squeeze 1606.80 1608.80 0
1985-05-10 Perforation 1605.00 1606.50 13
1985-05-11 Acid Treatment 1605.00 1606.50 0
1990-10-26 Cement Squeeze 1605.00 1606.50 0
1990-10-31 Perforation 1603.50 1605.50 13
1990-11-01 Acid Treatment 1603.50 1605.50 0
1990-11-02 Perforation 1604.50 1606.00 13
1997-01-16 Cement Squeeze 1603.50 1606.00 0
1997-01-27 Perforation 1641.70 1642.60 20
1997-01-27 Perforation 1642.50 1643.50 20
1965-01-29 Acid Treatment 1645.30 1645.60 0
1997-01-30 Acid Treatment 1641.70 1642.60 0
1997-02-24 Perforation 1644.20 1644.80 20
1997-02-25 Acid Treatment 1641.70 1644.80 0
1997-02-25 Cement Squeeze 1641.70 1644.80 0
1997-03-02 Perforation 1642.50 1643.50 20
1997-03-02 Acid Treatment 1642.50 1643.50 0
1997-03-28 Chemical Squeeze 1642.50 1643.50 0
1997-04-01 Acid Treatment 1642.50 1643.50 0
1997-04-10 Acid Treatment 1642.50 1643.50 0
1997-05-30 Packing Device Capped w/Cement 1627.00 1635.00 0
1965-01-30 Acid Treatment 1645.30 1645.60 0
1997-05-30 Packing Device Capped w/Cement 1600.00 1620.00 0
1965-09-19 Acid Treatment 1645.30 1645.60 0
1965-09-19 Cement Squeeze 1610.60 1622.80 0
1965-09-19 Cement Squeeze 1645.30 1645.60 0
1965-09-23 Cement Squeeze 1610.60 1622.80 0
1965-09-23 Cement Squeeze 1645.30 1645.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1980 4518 0.0 0.0 0.0
1981 8729 0.0 0.0 0.0
1982 7984 0.0 0.0 0.0
1983 8583 0.0 0.0 0.0
1984 8204 0.0 0.0 0.0
1985 8577 0.0 0.0 0.0
1986 8666 0.0 0.0 0.0
1987 8370 0.0 0.0 0.0
1988 8652 0.0 0.0 0.0
1989 8472 0.0 0.0 0.0
1990 8348 0.0 0.0 0.0
1991 8128 0.0 0.0 0.0
1992 8737 0.0 0.0 0.0
1993 8373 0.0 0.0 0.0
1994 8746 0.0 0.0 0.0
1995 8552 0.0 0.0 0.0
1996 8593 0.0 0.0 0.0
1997 384 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1952-06-19 Lost Circulation 1312.80 1312.80
1952-07-19 Lost Circulation 1640.40 1649.00

For data sources see[6]

References