X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354203509002

Well Details

Well ID: 0354203509002
Loading map...
Location: 00/09-35-035-20W4/2
Location Alias: 00/09-35-35-20 W4M
Location Alias 2: 00/09-35-035-20 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 35
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH FENNBV 9-35-35-20
Operator Name: Enhance Energy Inc.
License Number: 0004815
License Date: 1952-06-11
License Status: Issued
Spud Date: 1952-06-11
Final Drill Date: 1952-07-19
Well Total Depth: 1649.00 m
Surface Hole Latitude: 52.050071
Surface Hole Longitude: -112.746200

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-06-11 Obtained License
1952-06-19 Drill Stem Test Performed
1952-06-19 Lost Circulation Occurred
1952-06-22 Drill Stem Test Performed
1952-06-23 Drill Stem Test Performed
1952-07-02 Drill Stem Test Performed
1952-07-08 Drill Stem Test Performed
1952-07-09 Drill Stem Test Performed
1952-07-12 Liner Casing Operation Performed
1952-07-15 Drill Stem Test Performed
1952-07-16 Drill Stem Test Performed
1952-07-17 Drill Stem Test Performed
1952-07-19 Finished Drilling
1952-07-19 Lost Circulation Occurred
1952-07-19 Well Mode changed to Drilled and Cased
1952-07-21 Drill Stem Test Performed
1952-07-30 Perforation Treatment Performed - Bullet Perforation
1965-01-28 Perforation Treatment Performed - Jet Perforation
1965-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-09-19 Perforation Treatment Performed - Cement Squeeze
1965-09-23 Perforation Treatment Performed - Cement Squeeze
1965-09-26 Perforation Treatment Performed - Jet Perforation
1965-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-09-29 Well Began Production
1965-09-29 Well Fluid changed to Crude Oil
1965-09-29 Well Mode changed to Flowing
1976-08-24 Well Fluid changed to Crude Oil
1976-08-24 Well Mode changed to Pumping
1980-03-01 Well Fluid changed to Crude Oil
1980-03-01 Well Mode changed to Suspended
1980-03-19 Perforation Treatment Performed - Cement Squeeze
1980-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-25 Perforation Treatment Performed - Jet Perforation
1980-03-25 Well Fluid changed to Crude Oil
1980-03-25 Well Mode changed to Abandoned Zone
1982-12-17 Perforation Treatment Performed - Cement Squeeze
1982-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-21 Perforation Treatment Performed - Jet Perforation
1984-11-22 Perforation Treatment Performed - Cement Squeeze
1984-11-24 Perforation Treatment Performed - Jet Perforation
1985-05-08 Perforation Treatment Performed - Cement Squeeze
1985-05-10 Perforation Treatment Performed - Jet Perforation
1985-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-26 Perforation Treatment Performed - Cement Squeeze
1990-10-31 Perforation Treatment Performed - Jet Perforation
1990-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-02 Perforation Treatment Performed - Jet Perforation
1997-01-16 Perforation Treatment Performed - Cement Squeeze
1997-01-16 Plug Back Performed
1997-01-27 Perforation Treatment Performed - Jet Perforation
1997-01-27 Well Log Performed
1997-01-29 Well Log Performed
1997-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-03 Well Fluid changed to Crude Oil
1997-02-03 Well Mode changed to Pumping
1997-02-24 Perforation Treatment Performed - Jet Perforation
1997-02-24 Well Log Performed
1997-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-25 Perforation Treatment Performed - Cement Squeeze
1997-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-02 Perforation Treatment Performed - Jet Perforation
1997-03-02 Well Log Performed
1997-03-28 Perforation Treatment Performed - Chemical Squeeze
1997-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-05-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-05-30 Plug Back Performed
1997-05-30 Well Fluid changed to Crude Oil
1997-05-30 Well Log Performed
1997-05-30 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-07-30 Bullet Perforation 1610.60 1622.80 13
1965-09-26 Perforation 1644.70 1645.00 13
1965-09-27 Acid Treatment 1644.70 1645.00 0
1980-03-19 Cement Squeeze 1644.70 1645.00 0
1980-03-25 Perforation 1608.00 1613.00 13
1980-03-25 Acid Treatment 1608.00 1613.00 0
1982-12-17 Cement Squeeze 1608.00 1613.00 0
1982-12-21 Perforation 1608.00 1610.30 13
1982-12-21 Acid Treatment 1608.00 1610.30 0
1984-11-22 Cement Squeeze 1608.00 1610.30 0
1984-11-24 Perforation 1606.80 1608.80 13
1965-01-28 Perforation 1645.30 1645.60 7
1985-05-08 Cement Squeeze 1606.80 1608.80 0
1985-05-10 Perforation 1605.00 1606.50 13
1985-05-11 Acid Treatment 1605.00 1606.50 0
1990-10-26 Cement Squeeze 1605.00 1606.50 0
1990-10-31 Perforation 1603.50 1605.50 13
1990-11-01 Acid Treatment 1603.50 1605.50 0
1990-11-02 Perforation 1604.50 1606.00 13
1997-01-16 Cement Squeeze 1603.50 1606.00 0
1997-01-27 Perforation 1641.70 1642.60 20
1997-01-27 Perforation 1642.50 1643.50 20
1965-01-29 Acid Treatment 1645.30 1645.60 0
1997-01-30 Acid Treatment 1641.70 1642.60 0
1997-02-24 Perforation 1644.20 1644.80 20
1997-02-25 Acid Treatment 1641.70 1644.80 0
1997-02-25 Cement Squeeze 1641.70 1644.80 0
1997-03-02 Perforation 1642.50 1643.50 20
1997-03-02 Acid Treatment 1642.50 1643.50 0
1997-03-28 Chemical Squeeze 1642.50 1643.50 0
1997-04-01 Acid Treatment 1642.50 1643.50 0
1997-04-10 Acid Treatment 1642.50 1643.50 0
1997-05-30 Packing Device Capped w/Cement 1627.00 1635.00 0
1965-01-30 Acid Treatment 1645.30 1645.60 0
1997-05-30 Packing Device Capped w/Cement 1600.00 1620.00 0
1965-09-19 Acid Treatment 1645.30 1645.60 0
1965-09-19 Cement Squeeze 1610.60 1622.80 0
1965-09-19 Cement Squeeze 1645.30 1645.60 0
1965-09-23 Cement Squeeze 1610.60 1622.80 0
1965-09-23 Cement Squeeze 1645.30 1645.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 463 0.0 0.0 0.0
1971 667 0.0 0.0 0.0
1972 57 0.0 0.0 0.0
1973 32 0.0 0.0 0.0
1974 578 0.0 0.0 0.0
1975 506 0.0 0.0 0.0
1976 2166 0.0 0.0 0.0
1977 5009 0.0 0.0 0.0
1978 4950 0.0 0.0 0.0
1979 5842 0.0 0.0 0.0
1997 423 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1952-06-19 Lost Circulation 1312.80 1312.80
1952-07-19 Lost Circulation 1640.40 1649.00

For data sources see[6]

References