X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354213615002

Well Details

Well ID: 0354213615002
Loading map...
Location: 00/15-36-035-21W4/2
Location Alias: 00/15-36-35-21 W4M
Location Alias 2: 00/15-36-035-21 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 21
Section: 36
County/Municipality: County of Stettler No. 6
Well Name: EMBER RICH 15-36-35-21
Operator Name: Ember Resources Inc.
License Number: 0352328
License Date: 2006-02-17
License Status: Issued
Spud Date: 2006-02-20
Final Drill Date: 2006-02-22
Well Total Depth: 733.00 m
Surface Hole Latitude: 52.052653
Surface Hole Longitude: -112.872889

For data sources see[1][2]

Well History

Date Event
2006-02-17 Obtained License
2006-02-20 Surface Casing Operation Performed
2006-02-22 Finished Drilling
2006-02-22 Production Casing Operation Performed
2006-02-22 Rig Released
2006-02-22 Well Mode changed to Drilled and Cased
2006-03-04 Well Log Performed
2006-03-10 Perforation Treatment Performed - Jet Perforation
2006-03-10 Well Log Performed
2006-07-05 Perforation Treatment Performed - Fractured
2008-03-19 Perforation Treatment Performed - Jet Perforation
2008-03-19 Well Began Production
2008-03-19 Well Fluid changed to Gas
2008-03-19 Well Mode changed to Flowing
2008-04-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-04-14 Perforation Treatment Performed - Jet Perforation
2008-04-14 Plug Back Performed
2008-04-14 Well Fluid changed to Gas
2008-04-14 Well Mode changed to Abandoned Zone
2008-07-25 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-10 Perforation 713.50 715.00 17
2008-04-14 Perforation 347.90 348.30 13
2008-04-14 Perforation 344.50 346.30 13
2008-04-14 Perforation 339.50 340.50 13
2008-04-14 Perforation 336.50 338.80 13
2008-04-14 Perforation 333.70 334.00 13
2008-04-14 Perforation 319.40 319.80 13
2008-04-14 Perforation 314.90 317.80 13
2008-04-14 Perforation 305.90 306.30 13
2008-04-14 Perforation 304.90 305.60 13
2008-04-14 Perforation 303.90 304.50 13
2006-07-05 Fracture 713.50 715.00 0
2008-04-14 Perforation 302.10 302.50 13
2008-04-14 Perforation 290.30 291.30 13
2008-04-14 Perforation 267.70 268.00 13
2008-04-14 Perforation 250.00 250.30 13
2008-04-14 Perforation 246.00 246.80 13
2008-04-14 Perforation 243.90 244.50 13
2008-04-14 Perforation 239.70 240.00 13
2008-07-25 Fracture 239.70 407.90 0
2008-03-19 Perforation 699.00 704.00 17
2008-03-19 Perforation 530.00 531.00 17
2008-04-14 Packing Device Capped w/Cement 519.00 527.50 0
2008-04-14 Perforation 407.60 407.90 13
2008-04-14 Perforation 395.20 396.30 13
2008-04-14 Perforation 387.60 387.90 13
2008-04-14 Perforation 376.00 376.30 13

For data sources see[4]



References