X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364191816000

Well Details

Well ID: 0364191816000
Loading map...
Location: 00/16-18-036-19W4/0
Location Alias: 00/16-18-36-19 W4M
Location Alias 2: 00/16-18-036-19 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 19
Section: 18
County/Municipality: County of Stettler No. 6
Well Name: EMBER FENNBV 16-18-36-19
Operator Name: Ember Resources Inc.
License Number: 0084390
License Date: 1980-07-24
License Status: Issued
Spud Date: 1980-07-24
Final Drill Date: 1980-07-30
Well Total Depth: 1314.00 m
Surface Hole Latitude: 52.096248
Surface Hole Longitude: -112.701055

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-24 Obtained License
1980-07-29 Drill Stem Test Performed
1980-07-30 Finished Drilling
1980-07-30 Well Mode changed to Drilled and Cased
1980-07-31 Drill Stem Test Performed
1980-08-01 Production Casing Operation Performed
1980-10-06 Perforation Treatment Performed - Jet Perforation
1980-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-10 Perforation Treatment Performed - Jet Perforation
1980-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-20 Perforation Treatment Performed - Cement Squeeze
1980-10-21 Perforation Treatment Performed - Jet Perforation
1980-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-27 Perforation Treatment Performed - Jet Perforation
1984-03-08 Well Began Production
1984-03-08 Well Fluid changed to Gas
1984-03-08 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-10-06 Perforation 1282.00 1283.50 7
1980-10-24 Packing Device Capped w/Cement 1262.00 1270.00 0
1980-10-27 Perforation 631.00 641.50 7
1980-10-08 Acid Treatment 1282.00 1283.50 0
1980-10-10 Perforation 1275.50 1277.50 7
1980-10-10 Perforation 1278.50 1279.50 7
1980-10-10 Perforation 1280.50 1281.00 7
1980-10-14 Acid Treatment 1275.50 1281.00 0
1980-10-20 Cement Squeeze 1275.50 1283.50 0
1980-10-21 Perforation 1275.50 1277.80 7
1980-10-22 Acid Treatment 1275.50 1277.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 6555 0.0 0.0 0.0
1985 7827 0.0 0.0 0.0
1986 5708 0.0 0.0 0.0
1987 8727 0.0 0.0 0.0
1988 8748 0.0 0.0 0.0
1989 8715 0.0 0.0 0.0
1990 8584 0.0 0.0 0.0
1991 8699 0.0 0.0 0.0
1992 8759 0.0 0.0 0.0
1993 8617 0.0 0.0 0.0
1994 7382 0.0 0.0 0.0
1995 7060 0.0 0.0 0.0
1996 8613 0.0 0.0 0.0
1997 8690 0.0 0.0 0.0
1998 8327 0.0 0.0 0.0
1999 8660 0.0 0.0 0.0
2000 8686 0.0 0.0 0.0
2001 8623 0.0 0.0 0.0
2002 8684 0.0 0.0 0.0
2003 8649 0.0 0.0 0.0
2004 8315 0.0 0.0 0.0
2005 6658 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8758 0.0 0.0 0.0
2008 8748 0.0 0.0 0.0
2009 8408 0.0 0.0 0.0
2010 8680 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8645 0.0 0.0 0.0
2016 8733 0.0 0.0 0.0
2017 8640 0.0 0.0 0.0
2018 8607 0.0 0.0 0.0
2019 3816 0.0 0.0 0.0
2020 2133 0.0 0.0 0.0

For data sources see[5]

References