X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364200113000

Well Details

Well ID: 0364200113000
Loading map...
Location: 00/13-01-036-20W4/0
Location Alias: 00/13-01-36-20 W4M
Location Alias 2: 00/13-01-036-20 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 01
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH FENNBV 13-1-36-20
Operator Name: Cona Resources Ltd.
License Number: 0006495
License Date: 1953-05-25
License Status: Abandoned
Spud Date: 1953-05-27
Final Drill Date: 1953-06-17
Well Total Depth: 1638.00 m
Surface Hole Latitude: 52.068330
Surface Hole Longitude: -112.740003

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-05-25 Obtained License
1953-06-17 Finished Drilling
1953-06-17 Well Mode changed to Drilled and Cased
1953-06-19 Production Casing Operation Performed
1953-06-21 Perforation Treatment Performed - Jet Perforation
1953-06-22 Well Began Production
1953-06-22 Well Fluid changed to Crude Oil
1953-06-22 Well Mode changed to Flowing
1971-12-01 Perforation Treatment Performed - Cement Squeeze
1971-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-12-02 Perforation Treatment Performed - Jet Perforation
1972-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-01-18 Perforation Treatment Performed - Cement Squeeze
1972-01-26 Perforation Treatment Performed - Jet Perforation
1972-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-14 Well Fluid changed to Crude Oil
1980-11-14 Well Mode changed to Pumping
1985-01-22 Perforation Treatment Performed - Cement Squeeze
1985-01-23 Well Log Performed
1985-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-24 Perforation Treatment Performed - Jet Perforation
1985-10-17 Well Log Performed
1985-10-19 Perforation Treatment Performed - Cement Squeeze
1985-10-22 Well Log Performed
1985-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-23 Perforation Treatment Performed - Jet Perforation
1987-11-18 Well Log Performed
1987-11-19 Well Log Performed
1987-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-11-21 Perforation Treatment Performed - Cement Squeeze
1987-12-01 Well Log Performed
1987-12-02 Perforation Treatment Performed - Jet Perforation
1987-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-28 Perforation Treatment Performed - Cement Squeeze
1990-12-05 Perforation Treatment Performed - Jet Perforation
1990-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-12-07 Perforation Treatment Performed - Jet Perforation
1992-04-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-04-03 Plug Back Performed
1992-04-03 Well Fluid changed to Crude Oil
1992-04-03 Well Mode changed to Abandoned Zone
2000-08-29 Well Log Performed
2000-08-31 Perforation Treatment Performed - Cement Plug
2000-08-31 Perforation Treatment Performed - Jet Perforation
2000-08-31 Perforation Treatment Performed - Remedial Casing
2000-08-31 Well Log Performed
2000-09-01 Well Log Performed
2000-10-28 Well Abandoned
2000-10-28 Well Fluid changed to Crude Oil
2000-10-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-06-21 Perforation 1612.40 1624.60 13
1980-06-19 Acid Treatment 1607.50 1609.30 0
1985-01-22 Cement Squeeze 1607.50 1609.30 0
1985-01-24 Perforation 1605.00 1606.30 13
1985-01-24 Acid Treatment 1605.00 1606.30 0
1985-10-19 Cement Squeeze 1605.00 1606.30 0
1985-10-23 Perforation 1602.30 1604.10 13
1985-10-23 Acid Treatment 1602.30 1604.10 0
1987-11-20 Acid Treatment 1602.30 1604.10 0
1987-11-21 Cement Squeeze 1602.30 1604.10 0
1987-12-02 Perforation 1601.20 1602.70 13
1971-12-01 Cement Squeeze 1612.40 1624.60 0
1987-12-03 Acid Treatment 1601.20 1602.70 0
1990-11-27 Acid Treatment 1601.20 1602.70 0
1990-11-28 Cement Squeeze 1601.20 1602.70 0
1990-12-05 Perforation 1599.20 1600.50 7
1990-12-06 Acid Treatment 1599.20 1600.50 0
1990-12-07 Perforation 1599.00 1601.50 13
1990-12-07 Acid Treatment 1599.00 1601.50 0
1992-04-03 Packing Device Capped w/Cement 1587.00 1595.00 0
2000-08-31 Perforation 645.00 646.00 20
2000-08-31 Remedial Casing Cementing 645.00 646.00 0
1971-12-02 Perforation 1600.80 1602.30 7
2000-08-31 Cement Plug 622.00 642.00 0
2000-08-31 Perforation 340.00 341.00 20
2000-08-31 Remedial Casing Cementing 340.00 341.00 0
2000-08-31 Cement Plug 325.00 338.00 0
1971-12-02 Perforation 1604.20 1605.70 7
1971-12-02 Acid Treatment 1600.80 1605.70 0
1972-01-18 Acid Treatment 1600.80 1605.70 0
1972-01-18 Cement Squeeze 1600.80 1605.70 0
1972-01-26 Perforation 1607.50 1609.30 7
1972-01-27 Acid Treatment 1607.50 1609.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5683 0.0 0.0 0.0
1968 5974 0.0 0.0 0.0
1969 5510 0.0 0.0 0.0
1970 4026 0.0 0.0 0.0
1971 3876 0.0 0.0 0.0
1972 6079 0.0 0.0 0.0
1973 6853 0.0 0.0 0.0
1974 7314 0.0 0.0 0.0
1975 6161 0.0 0.0 0.0
1976 6362 0.0 0.0 0.0
1977 5376 0.0 0.0 0.0
1978 5808 0.0 0.0 0.0
1979 6543 0.0 0.0 0.0
1980 6355 0.0 0.0 0.0
1981 3177 0.0 0.0 0.0
1982 3642 0.0 0.0 0.0
1983 5317 0.0 0.0 0.0
1984 8151 0.0 0.0 0.0
1985 7083 0.0 0.0 0.0
1986 4974 0.0 0.0 0.0
1987 7722 0.0 0.0 0.0
1988 8713 0.0 0.0 0.0
1989 8427 0.0 0.0 0.0
1990 7763 0.0 0.0 0.0

For data sources see[5]

References