If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364200714000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.083389,"lon":-112.854755,"icon":""}]} |
Location: 00/14-07-036-20W4/0 | |
Location Alias: 00/14-07-36-20 W4M | |
Location Alias 2: 00/14-07-036-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 20 | |
Section: 07 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: EMBER FENNW 14-7-36-20 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411026 | |
License Date: 2009-06-18 | |
License Status: Issued | |
Spud Date: 2009-10-01 | |
Final Drill Date: 2009-10-15 | |
Well Total Depth: 751.00 m | |
Surface Hole Latitude: 52.083389 | |
Surface Hole Longitude: -112.854755 |
Date | Event |
---|---|
2009-06-18 | Obtained License |
2009-10-01 | Surface Casing Operation Performed |
2009-10-15 | Finished Drilling |
2009-10-15 | Well Mode changed to Drilled and Cased |
2009-10-16 | Production Casing Operation Performed |
2009-10-16 | Rig Released |
2009-10-16 | Well Log Performed |
2009-11-25 | Perforation Treatment Performed - Jet Perforation |
2009-11-25 | Well Log Performed |
2009-11-27 | Well Fluid changed to Gas |
2009-11-27 | Well Mode changed to Testing |
2009-12-01 | Perforation Treatment Performed - Fractured |
2009-12-09 | Perforation Treatment Performed - Jet Perforation |
2009-12-20 | Perforation Treatment Performed - Fractured |
2010-01-28 | Well Began Production |
2010-01-28 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-01-28 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-11-25 | Perforation | 615.00 | 616.00 | 17 |
2009-12-09 | Perforation | 311.90 | 313.40 | 13 |
2009-12-09 | Perforation | 244.80 | 245.30 | 13 |
2009-12-09 | Perforation | 364.50 | 366.00 | 13 |
2009-12-09 | Perforation | 356.00 | 359.00 | 13 |
2009-12-09 | Perforation | 286.00 | 287.00 | 13 |
2009-12-09 | Perforation | 392.50 | 395.00 | 13 |
2009-12-09 | Perforation | 242.00 | 244.00 | 13 |
2009-12-09 | Perforation | 239.00 | 240.50 | 13 |
2009-12-09 | Perforation | 213.50 | 214.50 | 13 |
2009-12-09 | Perforation | 336.00 | 338.50 | 13 |
2009-11-25 | Perforation | 728.50 | 729.50 | 17 |
2009-12-09 | Perforation | 723.80 | 724.30 | 13 |
2009-12-09 | Perforation | 457.00 | 458.50 | 13 |
2009-12-09 | Perforation | 413.50 | 415.00 | 13 |
2009-12-09 | Perforation | 703.90 | 704.40 | 13 |
2009-12-09 | Perforation | 688.80 | 689.30 | 13 |
2009-12-09 | Perforation | 709.60 | 710.10 | 13 |
2009-12-09 | Perforation | 408.80 | 409.80 | 13 |
2009-12-09 | Perforation | 347.50 | 349.50 | 13 |
2009-12-09 | Perforation | 342.80 | 343.80 | 13 |
2009-12-09 | Perforation | 339.50 | 340.00 | 13 |
2009-12-01 | Fracture | 615.00 | 729.50 | 0 |
2009-12-09 | Perforation | 350.50 | 352.20 | 13 |
2009-12-09 | Perforation | 395.80 | 396.30 | 13 |
2009-12-09 | Perforation | 361.00 | 363.00 | 13 |
2009-12-20 | Fracture | 286.00 | 395.00 | 0 |
2009-12-20 | Fracture | 457.00 | 458.50 | 0 |
2009-12-20 | Fracture | 688.80 | 724.30 | 0 |
2009-12-20 | Fracture | 213.50 | 415.00 | 0 |
2009-12-09 | Perforation | 273.50 | 274.00 | 13 |
2009-12-09 | Perforation | 271.50 | 272.00 | 13 |
2009-12-09 | Perforation | 268.50 | 271.00 | 13 |
2009-12-09 | Perforation | 280.50 | 281.50 | 13 |
2009-12-09 | Perforation | 328.20 | 330.20 | 13 |
2009-12-09 | Perforation | 323.00 | 324.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 48 | 0.0 | 0.0 | 0.0 |
2010 | 8060 | 0.0 | 0.0 | 0.0 |
2011 | 8579 | 0.0 | 0.0 | 0.0 |
2012 | 8475 | 0.0 | 0.0 | 0.0 |
2013 | 8714 | 0.0 | 0.0 | 0.0 |
2014 | 8654 | 0.0 | 0.0 | 0.0 |
2015 | 8707 | 0.0 | 0.0 | 0.0 |
2016 | 8587 | 0.0 | 0.0 | 0.0 |
2017 | 8712 | 0.0 | 0.0 | 0.0 |
2018 | 8713 | 0.0 | 0.0 | 0.0 |
2019 | 8632 | 0.0 | 0.0 | 0.0 |
2020 | 2148 | 0.0 | 0.0 | 0.0 |
For data sources see[5]