X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364201109000

Well Details

Well ID: 0364201109000
Loading map...
Location: 00/09-11-036-20W4/0
Location Alias: 00/09-11-36-20 W4M
Location Alias 2: 00/09-11-036-20 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 11
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH FENNBV 9-11-36-20
Operator Name: Enhance Energy Inc.
License Number: 0007091
License Date: 1953-09-24
License Status: Issued
Spud Date: 1953-10-23
Final Drill Date: 1953-11-09
Well Total Depth: 1622.80 m
Surface Hole Latitude: 52.079248
Surface Hole Longitude: -112.746166

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-09-24 Obtained License
1953-11-09 Finished Drilling
1953-11-09 Well Mode changed to Drilled and Cased
1953-11-10 Production Casing Operation Performed
1953-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-11-11 Perforation Treatment Performed - Jet Perforation
1953-11-13 Well Began Production
1953-11-13 Well Fluid changed to Crude Oil
1953-11-13 Well Mode changed to Flowing
1984-10-23 Perforation Treatment Performed - Cement Squeeze
1984-10-23 Well Log Performed
1984-10-24 Perforation Treatment Performed - Jet Perforation
1984-10-25 Well Fluid changed to Crude Oil
1984-10-25 Well Mode changed to Pumping
1985-08-14 Well Log Performed
1985-09-10 Well Log Performed
1985-09-12 Perforation Treatment Performed - Cement Squeeze
1985-09-13 Perforation Treatment Performed - Jet Perforation
1985-09-13 Well Log Performed
1985-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-09-05 Perforation Treatment Performed - Selective Jet Perforations
1986-09-09 Perforation Treatment Performed - Acid Wash - No Pressure
1986-09-09 Perforation Treatment Performed - Selective Jet Perforations
1986-09-10 Perforation Treatment Performed - Cement Plug
1986-09-10 Perforation Treatment Performed - Jet Perforation
1986-09-12 Perforation Treatment Performed - Acid Wash - No Pressure
1986-09-18 Perforation Treatment Performed - Acid Wash - No Pressure
1988-12-07 Perforation Treatment Performed - Cement Squeeze
1988-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-12-08 Perforation Treatment Performed - Jet Perforation
1989-06-01 Perforation Treatment Performed - Jet Perforation
1989-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-06 Perforation Treatment Performed - Jet Perforation
1989-06-06 Well Log Performed
1989-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-30 Perforation Treatment Performed - Cement Squeeze
1993-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-12-03 Perforation Treatment Performed - Jet Perforation
1994-05-04 Well Log Performed
1994-05-06 Perforation Treatment Performed - Cement Squeeze
1994-05-12 Well Log Performed
1994-05-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-13 Perforation Treatment Performed - Jet Perforation
1997-03-19 Perforation Treatment Performed - Jet Perforation
1997-03-19 Well Log Performed
1997-06-21 Perforation Treatment Performed - Cement Squeeze
1997-06-21 Well Log Performed
1997-06-24 Perforation Treatment Performed - Jet Perforation
1997-06-24 Well Log Performed
1997-06-26 Well Log Performed
1997-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-11-11 Perforation 1612.40 1618.50 13
1986-09-09 Acid Wash 1600.60 1601.90 0
1986-09-10 Perforation 1601.90 1602.90 13
1986-09-10 Cement Plug 1603.50 1604.10 0
1986-09-12 Acid Wash 1601.90 1602.90 0
1986-09-18 Acid Wash 1601.90 1602.90 0
1988-12-07 Cement Squeeze 1600.60 1602.90 0
1988-12-08 Perforation 1599.00 1599.50 14
1988-12-08 Acid Treatment 1599.00 1599.50 0
1989-06-01 Perforation 1569.50 1570.00 13
1989-06-02 Acid Treatment 1569.50 1570.00 0
1953-11-11 Acid Treatment 1612.40 1618.50 0
1989-06-06 Perforation 1585.00 1586.50 13
1989-06-07 Acid Treatment 1599.00 1599.50 0
1989-06-07 Acid Treatment 1585.00 1586.50 0
1989-06-08 Acid Treatment 1585.00 1586.50 0
1993-11-30 Cement Squeeze 1599.00 1599.50 0
1993-12-03 Perforation 1592.00 1594.00 17
1993-12-03 Acid Treatment 1590.50 1591.50 0
1993-12-03 Acid Treatment 1591.80 1592.80 0
1993-12-03 Acid Treatment 1592.90 1593.90 0
1993-12-03 Acid Treatment 1593.00 1594.00 0
1984-10-23 Cement Squeeze 1612.40 1618.50 0
1994-05-06 Cement Squeeze 1569.50 1594.00 0
1994-05-13 Perforation 1595.10 1595.60 17
1994-05-13 Acid Treatment 1595.10 1595.60 0
1997-03-19 Perforation 1567.00 1567.10 13
1997-03-19 Perforation 1568.60 1568.70 13
1997-03-19 Perforation 1580.20 1580.30 13
1997-06-21 Cement Squeeze 1595.10 1595.60 0
1997-06-24 Perforation 1585.00 1586.50 18
1997-06-24 Perforation 1589.00 1589.50 18
1997-06-27 Acid Treatment 1585.00 1589.50 0
1984-10-24 Perforation 1605.70 1606.90 13
1985-09-12 Cement Squeeze 1605.70 1606.90 0
1985-09-13 Perforation 1603.10 1604.10 13
1985-09-16 Acid Treatment 1603.10 1604.10 0
1986-09-05 Selective Jet Perforations 1600.60 1600.60 0
1986-09-09 Selective Jet Perforations 1601.90 1601.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1970 3975 0.0 0.0 0.0
1971 3366 0.0 0.0 0.0
1972 5320 0.0 0.0 0.0
1973 5479 0.0 0.0 0.0
1974 5950 0.0 0.0 0.0
1975 5281 0.0 0.0 0.0
1976 3301 0.0 0.0 0.0
1977 5694 0.0 0.0 0.0
1978 4547 0.0 0.0 0.0
1979 5859 0.0 0.0 0.0
1980 6124 0.0 0.0 0.0
1981 6422 0.0 0.0 0.0
1982 5420 0.0 0.0 0.0
1983 5923 0.0 0.0 0.0
1984 6170 0.0 0.0 0.0
1985 8238 0.0 0.0 0.0
1986 6601 0.0 0.0 0.0
1987 7126 0.0 0.0 0.0
1988 7916 0.0 0.0 0.0
1989 7406 0.0 0.0 0.0
1990 7994 0.0 0.0 0.0
1991 8071 0.0 0.0 0.0
1992 8721 0.0 0.0 0.0
1993 7774 0.0 0.0 0.0
1994 5291 0.0 0.0 0.0
1995 8419 0.0 0.0 0.0
1996 8741 0.0 0.0 0.0
1997 6207 0.0 0.0 0.0
1998 8554 0.0 0.0 0.0
1999 8651 0.0 0.0 0.0
2000 8588 0.0 0.0 0.0
2001 8495 0.0 0.0 0.0
2002 8669 0.0 0.0 0.0
2003 8221 0.0 0.0 0.0
2004 7861 0.0 0.0 0.0
2005 8200 0.0 0.0 0.0
2006 8671 0.0 0.0 0.0
2007 8536 0.0 0.0 0.0
2008 8395 0.0 0.0 0.0
2009 8748 0.0 0.0 0.0
2010 8660 0.0 0.0 0.0
2011 8714 0.0 0.0 0.0
2012 8372 0.0 0.0 0.0
2013 6952 0.0 0.0 0.0
2014 8704 0.0 0.0 0.0
2015 8756 0.0 0.0 0.0
2016 8494 0.0 0.0 0.0
2017 8278 0.0 0.0 0.0
2018 8733 0.0 0.0 0.0
2019 8751 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References