X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364201213000

Well Details

Well ID: 0364201213000
Loading map...
Location: 00/13-12-036-20W4/0
Location Alias: 00/13-12-36-20 W4M
Location Alias 2: 00/13-12-036-20 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 12
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH FENNBV 13-12-36-20
Operator Name: Cona Resources Ltd.
License Number: 0007090
License Date: 1953-09-24
License Status: Issued
Spud Date: 1953-10-21
Final Drill Date: 1953-11-10
Well Total Depth: 1602.60 m
Surface Hole Latitude: 52.082860
Surface Hole Longitude: -112.739823

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-09-24 Obtained License
1953-11-10 Finished Drilling
1953-11-10 Well Mode changed to Drilled and Cased
1953-11-11 Production Casing Operation Performed
1953-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-11-12 Perforation Treatment Performed - Jet Perforation
1953-11-13 Well Began Production
1953-11-13 Well Fluid changed to Crude Oil
1953-11-13 Well Mode changed to Flowing
1982-08-19 Perforation Treatment Performed - Cement Squeeze
1982-08-20 Perforation Treatment Performed - Jet Perforation
1983-08-20 Well Log Performed
1985-02-05 Well Fluid changed to Crude Oil
1985-02-05 Well Mode changed to Pumping
1986-02-17 Well Log Performed
1986-09-27 Perforation Treatment Performed - Acid Wash - No Pressure
1986-09-27 Perforation Treatment Performed - Selective Jet Perforations
1986-09-28 Perforation Treatment Performed - Selective Jet Perforations
1986-09-29 Perforation Treatment Performed - Acid Wash - No Pressure
1986-09-29 Perforation Treatment Performed - Selective Jet Perforations
1986-09-30 Perforation Treatment Performed - Acid Wash - No Pressure
1986-09-30 Perforation Treatment Performed - Selective Jet Perforations
1986-10-02 Perforation Treatment Performed - Cement Squeeze
1986-10-02 Perforation Treatment Performed - Jet Perforation
1986-10-03 Perforation Treatment Performed - Acid Wash - No Pressure
1987-05-06 Perforation Treatment Performed - Acid Wash - No Pressure
1987-05-06 Perforation Treatment Performed - Selective Jet Perforations
1987-05-07 Perforation Treatment Performed - Acid Wash - No Pressure
1988-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-28 Perforation Treatment Performed - Jet Perforation
1988-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-08-01 Well Fluid changed to Crude Oil
1991-08-01 Well Mode changed to Suspended
1996-02-29 Well Log Performed
1996-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-01 Perforation Treatment Performed - Jet Perforation
1996-03-01 Plug Back Performed
1996-03-01 Well Fluid changed to Crude Oil
1996-03-01 Well Mode changed to Abandoned Zone
1996-03-05 Well Log Performed
1996-03-06 Perforation Treatment Performed - Jet Perforation
1996-03-08 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-11-12 Perforation 1595.90 1602.00 13
1986-09-29 Acid Wash 1577.00 1577.00 0
1986-09-30 Selective Jet Perforations 1578.50 1578.50 0
1986-09-30 Acid Wash 1578.50 1578.50 0
1986-10-02 Cement Squeeze 1580.00 1582.30 0
1986-10-02 Perforation 1578.20 1578.80 16
1986-10-03 Acid Wash 1578.20 1578.80 0
1987-05-06 Selective Jet Perforations 1577.70 1577.70 0
1987-05-06 Acid Wash 1577.70 1577.70 0
1987-05-07 Acid Wash 1577.70 1577.70 0
1988-09-26 Acid Treatment 1578.20 1578.80 0
1953-11-12 Acid Treatment 1595.90 1602.00 0
1988-09-28 Perforation 1573.50 1574.30 13
1988-09-28 Perforation 1575.50 1576.00 13
1988-09-29 Acid Treatment 1575.50 1577.70 0
1996-03-01 Packing Device Capped w/Cement 1550.40 1558.40 0
1996-03-01 Perforation 1272.50 1276.50 17
1996-03-01 Perforation 1281.40 1285.60 17
1996-03-06 Perforation 1276.00 1279.00 16
1996-03-08 Fracture 1272.50 1285.60 0
1982-08-19 Cement Squeeze 1595.90 1602.00 0
1982-08-20 Perforation 1581.30 1582.30 13
1986-09-27 Selective Jet Perforations 1580.00 1580.00 0
1986-09-27 Acid Wash 1580.00 1580.00 0
1986-09-28 Selective Jet Perforations 1578.50 1578.50 0
1986-09-29 Acid Wash 1578.50 1578.50 0
1986-09-29 Selective Jet Perforations 1577.00 1577.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1971 1352 0.0 0.0 0.0
1983 114 0.0 0.0 0.0
1984 8219 0.0 0.0 0.0
1985 5015 0.0 0.0 0.0
1986 5952 0.0 0.0 0.0
1987 6637 0.0 0.0 0.0
1988 6781 0.0 0.0 0.0
1989 7689 0.0 0.0 0.0
1990 4528 0.0 0.0 0.0

For data sources see[5]

References