X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364201214000

Well Details

Well ID: 0364201214000
Loading map...
Location: 00/14-12-036-20W4/0
Location Alias: 00/14-12-36-20 W4M
Location Alias 2: 00/14-12-036-20 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 12
County/Municipality: County of Stettler No. 6
Well Name: GULF CAPRONA FENNBV 14-12-36-20
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0007319
License Date: 1953-11-13
License Status: RecCertified
Spud Date: 1953-11-24
Final Drill Date: 1953-12-13
Well Total Depth: 1599.60 m
Surface Hole Latitude: 52.082843
Surface Hole Longitude: -112.734134

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-11-13 Obtained License
1953-12-13 Finished Drilling
1953-12-13 Production Casing Operation Performed
1953-12-13 Well Mode changed to Drilled and Cased
1953-12-15 Perforation Treatment Performed - Jet Perforation
1953-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-12-16 Well Began Production
1953-12-16 Well Fluid changed to Crude Oil
1953-12-16 Well Mode changed to Flowing
1976-09-30 Perforation Treatment Performed - Cement Squeeze
1976-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-10-01 Perforation Treatment Performed - Jet Perforation
1984-04-18 Well Log Performed
1985-03-12 Well Fluid changed to Crude Oil
1985-03-12 Well Mode changed to Pumping
1986-08-05 Well Log Performed
1986-08-06 Perforation Treatment Performed - Jet Perforation
1986-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-08-15 Perforation Treatment Performed - Cement Squeeze
1986-08-18 Perforation Treatment Performed - Jet Perforation
1986-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-05-13 Perforation Treatment Performed - Selective Jet Perforations
1987-05-20 Perforation Treatment Performed - Acid Wash - No Pressure
1987-05-20 Perforation Treatment Performed - Selective Jet Perforations
1987-05-22 Perforation Treatment Performed - Acid Wash - No Pressure
1987-05-22 Perforation Treatment Performed - Selective Jet Perforations
1987-05-25 Perforation Treatment Performed - Selective Jet Perforations
1987-05-26 Perforation Treatment Performed - Acid Wash - No Pressure
1987-05-27 Perforation Treatment Performed - Selective Jet Perforations
1987-05-29 Perforation Treatment Performed - Acid Wash - No Pressure
1988-08-25 Perforation Treatment Performed - Jet Perforation
1988-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-08-01 Well Fluid changed to Crude Oil
1991-08-01 Well Mode changed to Suspended
1991-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-08-24 Plug Back Performed
1991-08-24 Well Fluid changed to Crude Oil
1991-08-24 Well Mode changed to Abandoned Zone
1996-06-14 Perforation Treatment Performed - Jet Perforation
1996-06-15 Perforation Treatment Performed - Remedial Casing
1996-06-18 Perforation Treatment Performed - Cement Plug
1996-08-03 Well Abandoned
1996-08-03 Well Fluid changed to Crude Oil
1996-08-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-12-15 Perforation 1593.50 1599.60 13
1986-08-19 Acid Treatment 1576.50 1577.50 0
1987-05-13 Selective Jet Perforations 1574.60 1574.60 0
1987-05-20 Selective Jet Perforations 1574.40 1574.40 0
1987-05-20 Acid Wash 1574.40 1574.60 0
1987-05-22 Selective Jet Perforations 1573.40 1573.40 0
1987-05-22 Acid Wash 1573.40 1573.40 0
1987-05-25 Selective Jet Perforations 1575.50 1575.50 0
1987-05-26 Acid Wash 1575.50 1575.50 0
1987-05-27 Selective Jet Perforations 1575.50 1575.50 0
1987-05-29 Acid Wash 1575.50 1575.50 0
1953-12-16 Acid Treatment 1593.50 1599.60 0
1988-08-25 Perforation 1573.40 1574.40 13
1988-08-26 Acid Treatment 1573.40 1574.40 0
1991-08-24 Packing Device Capped w/Cement 1557.00 1565.00 0
1996-06-14 Perforation 271.00 272.00 13
1996-06-15 Remedial Casing Cementing 271.00 272.00 0
1996-06-18 Cement Plug 47.00 272.00 0
1976-09-30 Cement Squeeze 1593.50 1599.60 0
1976-10-01 Perforation 1581.90 1588.00 7
1976-10-01 Acid Treatment 1581.90 1588.00 0
1986-08-06 Perforation 1579.50 1579.60 13
1986-08-08 Acid Treatment 1579.50 1579.60 0
1986-08-15 Cement Squeeze 1579.50 1579.60 0
1986-08-18 Perforation 1576.50 1577.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 288 0.0 0.0 0.0
1968 954 0.0 0.0 0.0
1969 4795 0.0 0.0 0.0
1970 3732 0.0 0.0 0.0
1971 4063 0.0 0.0 0.0
1972 5642 0.0 0.0 0.0
1973 6006 0.0 0.0 0.0
1974 4807 0.0 0.0 0.0
1975 5677 0.0 0.0 0.0
1976 6003 0.0 0.0 0.0
1977 4819 0.0 0.0 0.0
1978 5078 0.0 0.0 0.0
1979 7700 0.0 0.0 0.0
1980 7454 0.0 0.0 0.0
1981 7194 0.0 0.0 0.0
1982 7402 0.0 0.0 0.0
1983 6933 0.0 0.0 0.0
1984 8101 0.0 0.0 0.0
1985 7491 0.0 0.0 0.0
1986 6754 0.0 0.0 0.0
1987 7742 0.0 0.0 0.0
1988 7077 0.0 0.0 0.0
1989 7259 0.0 0.0 0.0
1990 7257 0.0 0.0 0.0
1991 2923 0.0 0.0 0.0

For data sources see[5]

References