X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364201416000

Well Details

Well ID: 0364201416000
Loading map...
Location: 00/16-14-036-20W4/0
Location Alias: 00/16-14-36-20 W4M
Location Alias 2: 00/16-14-036-20 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 14
County/Municipality: County of Stettler No. 6
Well Name: RANDON NO 16
Operator Name: Gulf Canada Limited
License Number: 0005536
License Date: 1952-10-23
License Status: RecCertified
Spud Date: 1952-10-31
Final Drill Date: 1952-11-18
Well Total Depth: 1600.80 m
Surface Hole Latitude: 52.097452
Surface Hole Longitude: -112.746133

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-10-23 Obtained License
1952-11-18 Finished Drilling
1952-11-18 Well Mode changed to Drilled and Cased
1952-11-20 Production Casing Operation Performed
1952-11-22 Perforation Treatment Performed - Open-Hole Completion
1952-11-26 Well Began Production
1952-11-26 Well Fluid changed to Crude Oil
1952-11-26 Well Mode changed to Flowing
1970-10-31 Perforation Treatment Performed - Cement Plug
1970-10-31 Perforation Treatment Performed - Open-Hole Completion
1976-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-01 Well Fluid changed to Crude Oil
1980-04-01 Well Mode changed to Suspended
1990-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-01-09 Perforation Treatment Performed - Jet Perforation
1990-01-09 Plug Back Performed
1990-01-09 Well Fluid changed to Crude Oil
1990-01-09 Well Mode changed to Abandoned
1990-01-10 Perforation Treatment Performed - Remedial Casing
1990-01-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-11-22 Open Hole/Barefoot Completion 1577.30 1600.80 0
1970-10-31 Cement Plug 1595.60 1600.50 0
1970-10-31 Open Hole/Barefoot Completion 1577.30 1595.60 0
1976-10-20 Acid Treatment 1577.30 1595.60 0
1990-01-09 Packing Device Capped w/Cement 1562.00 1572.00 0
1990-01-09 Perforation 208.00 209.00 13
1990-01-10 Remedial Casing Cementing 208.00 209.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3303 0.0 0.0 0.0
1968 2926 0.0 0.0 0.0
1969 3438 0.0 0.0 0.0
1970 4128 0.0 0.0 0.0
1971 4823 0.0 0.0 0.0
1972 7053 0.0 0.0 0.0
1973 7467 0.0 0.0 0.0
1974 7009 0.0 0.0 0.0
1975 8225 0.0 0.0 0.0
1976 7137 0.0 0.0 0.0
1977 8496 0.0 0.0 0.0
1978 8469 0.0 0.0 0.0
1979 8705 0.0 0.0 0.0
1980 1698 0.0 0.0 0.0

For data sources see[5]

References